You are on page 1of 5

COMPETENCY DEMONSTRATION REPORT

Construction of 20 Storey Residential Building


Kingdom of Bahrain
Model Perspective: Actual View of the Completed Project

Page 1 of 5

COMPETENCY DEMONSTRATION REPORT


Photograph 1: Showing the rebar getting done for the beam and laying of duct for
prestressing.

Photograph 2: Showing the rebar getting done on the 8th Floor

Page 2 of 5

COMPETENCY DEMONSTRATION REPORT

Photograph 3: Showing the Core Wall getting done on upto 11th Floor

Photograph 4: Showing the Concrete Pump used on 8th Floor Casting

Page 3 of 5

COMPETENCY DEMONSTRATION REPORT

Photograph 5: Its me on the right side (holding the plans) doing site inspection
before pouring of concrete.

Photograph 6: Rebar works inspection for the correct position of ducting.


Page 4 of 5

COMPETENCY DEMONSTRATION REPORT

Photograph 7: Setting up the equipment for grouting of ducts.

Page 5 of 5