Inspection Unit Administration: - Does the unit conduct at least monthly safety / communication meetings? - Has the unit conducted the annual self assessment? are all RVs tested within EIS (i.e., none overdue without approved deviation request per SAP RV System)? are deviation requests submitted to the Inspection Department complete? are all deviation requests and discretionary letter available? Do you have OSI drawings for all equipment and piping in hydrocarbon service or critical service?
Inspection Unit Administration: - Does the unit conduct at least monthly safety / communication meetings? - Has the unit conducted the annual self assessment? are all RVs tested within EIS (i.e., none overdue without approved deviation request per SAP RV System)? are deviation requests submitted to the Inspection Department complete? are all deviation requests and discretionary letter available? Do you have OSI drawings for all equipment and piping in hydrocarbon service or critical service?
Copyright:
Attribution Non-Commercial (BY-NC)
Available Formats
Download as DOCX, PDF, TXT or read online from Scribd
Inspection Unit Administration: - Does the unit conduct at least monthly safety / communication meetings? - Has the unit conducted the annual self assessment? are all RVs tested within EIS (i.e., none overdue without approved deviation request per SAP RV System)? are deviation requests submitted to the Inspection Department complete? are all deviation requests and discretionary letter available? Do you have OSI drawings for all equipment and piping in hydrocarbon service or critical service?
Copyright:
Attribution Non-Commercial (BY-NC)
Available Formats
Download as DOCX, PDF, TXT or read online from Scribd
Administration: - Does the unit conduct at least monthly safety/communication meetings? □ □ - Has the unit conducted the annual self assessment? □ □ Equipment Inspection: - Are all RVs tested within EIS (i.e., none overdue without approved deviation □ □ request per SAP RV System)?
- Do you conduct annual survey to ensure
that installed RVs are tagged, sealed, in the correct location, and piped to a safe □ □ location?
- Are mothballed RV properly designated
and tracked? □ □
- Are deviation requests submitted to the
Inspection Department complete? □ □
- Do you conduct periodic inspection of
the transition area soil/air interface) and □ □ splash zones? - Is the low potential reading and/or the CP system deficiencies reported and □ □ tracked? Drawings & Filling: - Are Equipment Files updated/complete? □ □ - Are all Deviation requests and TSU &PCUdiscretionary letter available? □ Yes □ No Remarks BIs and- Capital Do youProjects: have OSI drawings for all equipment - Submitted on and piping in hydrocarbon time □ □ service or critical service? - No overdue Plant Engineering □ Yes □ No Remarks Library:- Interact with central engineering □ □ - Clean Attending technical exchange meeting □ □ - Development: Engineer Organized □ □ OIM &-MOC: Attending technical courses □ □ - OIM Updated □ □ - IDP updated □ □ - Complete OIM set available □ □ - Signed AEDP (for PDPs) □ □ - Complete MOC available and updated □ □ Drawings: - Updated □ □ - Emergency Drawings available and updated □ □ - Organized □ □ Job Log (CRM): - Utilized □ □ Audited By: _____________________________________ Sign: _____________________________