The document discusses repairs needed for Boiler no. 2's furnace at the Baturong Palm Oil Mill. It contains diagrams labeling areas in need of repair, including the wall above the fiber inlet and the side wall of the furnace, which are marked in Figures 1A, 1B, 1C and Figures 2A, 2B, 2C respectively.
The document discusses repairs needed for Boiler no. 2's furnace at the Baturong Palm Oil Mill. It contains diagrams labeling areas in need of repair, including the wall above the fiber inlet and the side wall of the furnace, which are marked in Figures 1A, 1B, 1C and Figures 2A, 2B, 2C respectively.
Copyright:
Attribution Non-Commercial (BY-NC)
Available Formats
Download as DOCX, PDF, TXT or read online from Scribd
The document discusses repairs needed for Boiler no. 2's furnace at the Baturong Palm Oil Mill. It contains diagrams labeling areas in need of repair, including the wall above the fiber inlet and the side wall of the furnace, which are marked in Figures 1A, 1B, 1C and Figures 2A, 2B, 2C respectively.
Copyright:
Attribution Non-Commercial (BY-NC)
Available Formats
Download as DOCX, PDF, TXT or read online from Scribd