You are on page 1of 12

OptiX OSN 7500 Commissioning Guide

Contents

Contents
1 Preparations for Equipment Commissioning .................................................................................1-1 1.1 Instruments and Tools.................................................................................................................... 1-2 1.2 Engineering Information................................................................................................................ 1-3 1.3 Connection Points Position ............................................................................................................ 1-4 1.4 External Check .............................................................................................................................. 1-6 1.5 Requirements for Commissioning Engineers ................................................................................. 1-7 1.6 Commissioning Items .................................................................................................................... 1-8

T2-040439-20060320-C-1.50

Huawei Technologies Proprietary

OptiX OSN 7500 Commissioning Guide

Figures

Figures
Figure 1-2 Connection points position of OptiX OSN 7500................................................................. 1-4

T2-040439-20060320-C-1.50

Huawei Technologies Proprietary

iii

OptiX OSN 7500 Commissioning Guide

Tables

Tables
Table 1-1 Organisation of chapter 1 .................................................................................................... 1-1 Table 1-2 Instruments and tools for commissioning ............................................................................. 1-2 Table 1-3 Numbering and functions referred to the connection points .................................................. 1-5 Table 1-4 Testing items ....................................................................................................................... 1-8

T2-040439-20060320-C-1.50

Huawei Technologies Proprietary

OptiX OSN 7500 Commissioning Guide

1 Preparations for Equipment Commissioning

1
Section

Preparations for Equipment Commissioning

This chapter describes the preparations for commissioning. Table 1-1 shows the organisation of this chapter.
Table 1-1 Organisation of chapter 1
Describes the

1.1 Instruments and Tools 1.2 Engineering Information 1.3 Connection Points Position 1.4 External Check 1.5 Requirements for Commissioning Engineers 1.6 Commissioning Items

Instruments and tools needed. Engineering documents needed. Connection points position. External environment required. Requirements for commissioning engineers. Commissioning items.

T2-040439-20060320-C-1.50

Huawei Technologies Proprietary

1-1

1 Preparations for Equipment Commissioning

OptiX OSN 7500 Commissioning Guide

1.1 Instruments and Tools


Table 1-2 shows the instruments and tools for commissioning.
Table 1-2 Instruments and tools for commissioning
Name Used for

SDH analyser Optical power meter Fixed attenuator Laptop computer Multimetre Fibre jumper BER tester Adjustable attenuator Data analyser ATM analyser

Testing multiplex section switching time, frequency deviation and jitter at optical or electrical interfaces, and so on. Testing the actual received optical power, receiver sensitivity, and receiver overload at optical interfaces. Attenuating strong optical power received at optical interfaces to avoid damage. NE commissioning and Ethernet indexes test. Testing voltage, resistance, current intensity. Transfer during optical power test of optical interfaces at the ODF side. Testing bit errors at electrical interfaces. Testing receiver overload at optical interfaces and testing receiver sensitivity. Testing Ethernet services. Testing ATM services.

1-2

Huawei Technologies Proprietary

T2-040439-20060320-C-1.50

OptiX OSN 7500 Commissioning Guide

1 Preparations for Equipment Commissioning

1.2 Engineering Information


Engineering information includes: Networking diagram IP address allocation diagram Board layout of each NE Fibre and cable connection table Timeslot allocation diagram Board level protection information Clock tracing diagram Orderwire diagram

T2-040439-20060320-C-1.50

Huawei Technologies Proprietary

1-3

1 Preparations for Equipment Commissioning

OptiX OSN 7500 Commissioning Guide

1.3 Connection Points Position


EU08 OU08 MU04 TSB8 D34S D75S ETF8 EFF8 ETS8

13

14

12

15

12

Interface board
19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38

GXCS

GSCC

EOW

AUX

20 21 22 23 24 16 17 26 27 28 25

29 30 31 32 33 34 35 36 18
PIU

37

19

10

11 12 13 14

15 16 17 18

Processing board
SL64 SL16 SL4 SLH1 SLT1 SEP1 SL1 PQ1 PL3A SPQ4 LWX MR2A BPA EGT2 EFS0 EGS2 EMR0 ADL4

10

11

11

11

12

Figure 1-1 Connection points position of OptiX OSN 7500

1-4

Huawei Technologies Proprietary

T2-040439-20060320-C-1.50

OptiX OSN 7500 Commissioning Guide

1 Preparations for Equipment Commissioning

Table 1-3 Numbering and functions referred to the connection points


Access Point Number (Note) Position Function Description Connection Type

1 2 3 4 5 6 7 8 9

T2SL64 N1SL16, N2SL16 N1SL4, N2SL4, ADL4 N1SL1, N2SL1, N1SLT1, N1OU08, N2OU08 N1SEP1 N1PL3A, N1D34S N1LWX N1LWX N1MR2A

Optical stm-64 connections Optical stm-16 connections Optical stm-4 connections Optical stm-1 connections 140 Mbit/s and STM-1 Electrical Connections 34 and 45 Mbit/s Electrical Connections 10 Mbit/s to 2.5 Mbit/s Optical Connection at WDM side 10 Mbit/s to 2.5 Mbit/s Optical Connection at client side Adding/Dropping and Multiplexing Any Adjacent Two Channels Connections Optical booster amplifier connections Optical 1000Base-SX and 1000Base-LX Connections Fast Ethernet access connections 140 Mbit/s and STM-1 Electrical Connections (access unit) 2 Mbit/s Electrical Connections Optical fast Ethernet access connections Reset button Alarm cut switch 50 w power output connections -48 v power access connections 75-ohm clock connections 1 120-ohm clock connection 2

LC LC LC LC SMB SMB LC LC LC

10 11 12 13 14 15 16 17 18 19 20 21

N1BPA N1EGT2, N2EGS2, N2EMR0 N1EFT8, N1EFS4, N1ETS8, N2EMR0 N1MU04 N1D75S N1EFF8 N2GSCC N2GSCC T1PIU T1PIU T1EOW T1EOW

LC LC RJ-45 SMB 2mmHM (75 ohm) LC Button Button Common socket4 pin DB3 SMB RJ-45

T2-040439-20060320-C-1.50

Huawei Technologies Proprietary

1-5

1 Preparations for Equipment Commissioning Access Point Number (Note) Position Function Description

OptiX OSN 7500 Commissioning Guide Connection Type

22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37

T1AUX T1EOW T1EOW T1EOW T1EOW T1EOW T1EOW T1AUX T1AUX T1AUX T1AUX T1AUX T1AUX T1AUX T1AUX T1AUX

Extended subrack connection Orderwire connection Outgoing subnet orderwire connections OAM connection Serial signal connections COM commissioning Connection T2000 connection 75-ohm clock connections 3 120-ohm clock connection 4 F&f Connection F1 connection Cabinet alarm indicator output connection Cabinet alarm indicator input concatenation connection Alarm concatenation connection Alarm output connection Alarm input connection

RJ-45 RJ-45 RJ-45 RJ-45 RJ-45 RJ-45 RJ-45 SMB RJ-45 RJ-45 RJ-45 RJ-45 RJ-45 RJ-45 RJ-45 RJ-45

Note: The number in the first column is corresponding to the number in the ring in Figure 1-1.

1.4 External Check


Confirm the following items in advance.

The hardware installation check is complete. The T2000 is ready. The T2000-local craft terminal (T2000-LCT) is ready in the laptop. All equipment on each NE has active and standby power supplies. Check whether alarms need to be output. The interface impedance (75 ohms or 120 ohms) of the DDF on each NE is the same as that of tributary boards and tributary interface boards. Clock protection is provided. The setting of the clock board is correct. To achieve clock protection switching, it is required to provide synchronisation

1-6

Huawei Technologies Proprietary

T2-040439-20060320-C-1.50

OptiX OSN 7500 Commissioning Guide

1 Preparations for Equipment Commissioning

state message bit (SSMB) in the 2 Mbit/s clock signal and the location of that message.

1.5 Requirements for Commissioning Engineers


Before using this manual, commissioning engineers should have received training on optical equipment commissioning and be skillful at using various test tools. The requirements are as follows. Be familiar with the fundamentals of SDH, PDH, Ethernet, and ATM. Be familiar with the equipment. Be skillful at using the T2000 for service configuration. Be skillful at using the LCT for service configuration. Be skillful at using test tools (for SDH, PDH, Ethernet, and ATM).

T2-040439-20060320-C-1.50

Huawei Technologies Proprietary

1-7

1 Preparations for Equipment Commissioning

OptiX OSN 7500 Commissioning Guide

1.6 Commissioning Items


Table 1-4 lists the testing items.
Table 1-4 Testing items
Item Sub-item

NE commissioning

Checking hardware Testing and powering on cabinet Testing subrack functions Accessing the equipment through the NM Testing the RESET button Testing the centralised alarm processing system Testing the software version Configuring service for testing Testing optical or electrical interface indexes Testing the electrical interfaces connection Testing the fibre jumper connection Testing the TPS of electrical interface Testing the active/standby board switching Testing bit errors on an NE Testing the intra-station ECC Backing up the NE database Testing NE restarting after power failure End of commissioning

1-8

Huawei Technologies Proprietary

T2-040439-20060320-C-1.50

OptiX OSN 7500 Commissioning Guide Item Sub-item

1 Preparations for Equipment Commissioning

Network commissioning

Testing network-wide fibre connection Testing ECC routing Checking the network-wide software version Testing service channel availability Testing Ethernet services Testing self-healing protection switching Testing clock protection switching Testing orderwire Testing network-wide BER Other tests Configuring the services T2000 function verification

T2-040439-20060320-C-1.50