Nazim Baloch
Syed Salman Hussain
Umesh Malaviya; Osama Ayesh; Abdulaziz Mohamed Ragab; Shujaat Khurshid
RE: SITE VISIT: INTEGRATION OF SHUQAIQ-2 POWER PLANT380 KV OVERHEAD LINE
Tuesday, March 18, 2014 11:59:53 AM
image001.png
Ad581ef87-6750-47a3-ba02-525ef3318ac4.pdf

Dear Mr. Salman,


Attached is the letter of SEC containing the details of contact person and meeting
place for this site visit.

Best Regards
Nazim Baloch
Electrical Engineer
Power Transmission Department

Saudi Services for Electro Mechanic Works Co.


(Closed Joints Stock Company)
SSEM HQ | Al- Rashid Tower |5 th & 6th floor
Al Maather St. | Riyadh 11442, KSA | PO Box 6341
T: 462-5511 Ext. 444 |F: 462-7804
Email: n.baloch@ssem.com.sa | www.ssem.com.sa

From: Syed Salman Hussain


Sent: Tuesday, March 18, 2014 8:54 AM
To: Abdulaziz Mohamed Ragab; Shujaat Khurshid; Nazim Baloch
Cc: Umesh Malaviya; Osama Ayesh; Abdulaziz Mohamed Ragab
Subject: RE: SITE VISIT: INTEGRATION OF SHUQAIQ-2 POWER PLANT380 KV OVERHEAD LINE

Dear Gentlemen,
Kindly confirm me about the visit of Shuqaiq 380KV Substation with cell number of contact person in
Shuqaiq.
Also Guide me about the route of Shuqaiq 380KV substation from Bishah City on Google Map.

Thanks & Best Regards ,


Syed Salman Hussain
Electrical Engineer
Al-Bishah 380kv BSP SS Project.

Saudi Services for Electro Mechanical Works (Closed Joint Stock Company).
SSEM JEDDAH BRANCH| AL NOOR COMMERCIAL CENTER |5 TH FLOOR
ROOM NO.35 MADINAH ROAD | JEDDAH, KSA | PO Box 12276 | 21473
T: 0544984687
E-mail: s.hussain@ssem.com.sa

From: Abdulaziz Mohamed Ragab


Sent: Sunday, March 16, 2014 1:12 PM
To: Umesh Malaviya; Shujaat Khurshid
Cc: Syed Salman Hussain; Osama Ayesh
Subject: RE: SITE VISIT: INTEGRATION OF SHUQAIQ-2 POWER PLANT380 KV OVERHEAD LINE

Attached
From: Umesh Malaviya
Sent: Sunday, March 16, 2014 12:54 PM
To: Shujaat Khurshid
Cc: Syed Salman Hussain; Osama Ayesh; Abdulaziz Mohamed Ragab
Subject: FW: SITE VISIT: INTEGRATION OF SHUQAIQ-2 POWER PLANT380 KV OVERHEAD LINE

Dear Mr. Shujaat


Can you please provide to Engr. Salman the PTS/SoW before visit related to substation portion.
Thanking you,

Best Regards,
UMESH MALAVIYA
Project Manager
Bisha 380KV BSP Project
Saudi Services for Electro Mechanic Works
(Closed Joint Stock Company)
SSEM JEDDAH BRANCH| AL NOOR COMMERCIAL CENTER |5 TH FLOOR
ROOM NO.504 MADINAH ROAD | JEDDAH, KSA | PO Box 12276 | 21473
T: 02- 6527697 |F: 02 657 5276| Mobile: 0538320908
E-mail: u.malaviya@ssem.com.sa

From: Syed Salman Hussain


Sent: 16 March 2014 12:29
To: Umesh Malaviya; Osama Ayesh
Subject: RE: SITE VISIT: INTEGRATION OF SHUQAIQ-2 POWER PLANT380 KV OVERHEAD LINE

Dear Sir,
Kindly Arrange Necessary documents for study regarding Tendering of Shuqaiq Project and further
also tell me if any particular information SSEM Tendering team require to collect from shuqaiq Power
Plant regarding 380KV Transmission Line Integration Project.

Thanks & Best Regards ,


Syed Salman Hussain
Electrical Engineer
Al-Bishah 380kv BSP SS Project.
Saudi Services for Electro Mechanical Works (Closed Joint Stock Company).
SSEM JEDDAH BRANCH| AL NOOR COMMERCIAL CENTER |5 TH FLOOR
ROOM NO.35 MADINAH ROAD | JEDDAH, KSA | PO Box 12276 | 21473
T: 0544984687
E-mail: s.hussain@ssem.com.sa

From: Umesh Malaviya


Sent: Sunday, March 16, 2014 11:13 AM
To: Osama Ayesh
Cc: Syed Salman Hussain
Subject: FW: SITE VISIT: INTEGRATION OF SHUQAIQ-2 POWER PLANT380 KV OVERHEAD LINE

From: SSEM-Department (Tendering)


Sent: 13 March 2014 17:03
To: Umesh Malaviya; Osama Ayesh
Cc: Abdulaziz Mohamed Ragab; SSEM-Division (380KV Substations)
Subject: FW: SITE VISIT: INTEGRATION OF SHUQAIQ-2 POWER PLANT380 KV OVERHEAD LINE

FYKI
From: Abdulaziz Mohamed Ragab
Sent: Thursday, March 13, 2014 4:56 PM
To: Shujaat Khurshid
Cc: Muhammad Yazdani; Adnan Abdul Wahed; Edwardo Tenorio; Nazim Baloch; SSEM-Department
(Tendering)
Subject: RE: SITE VISIT: INTEGRATION OF SHUQAIQ-2 POWER PLANT380 KV OVERHEAD LINE

Dear Mr. Shujaat,


Please find attached our Representative Iqama ID (Engr. Salman EE) from Bisha
Project.
Regards

From: Shujaat Khurshid


Sent: Thursday, March 13, 2014 11:28 AM
To: Abdulaziz Mohamed Ragab
Cc: Muhammad Yazdani; Adnan Abdul Wahed; Edwardo Tenorio; Nazim Baloch; SSEM-Department
(Tendering)
Subject: SITE VISIT: INTEGRATION OF SHUQAIQ-2 POWER PLANT380 KV OVERHEAD LINE

Dear Mr. Abdul Aziz,


Please find attached SEC letter requesting details of representative for site visit.

Best Regards,

Shujaat Khurshed

Deputy Manager
Power Transmission Department
Saudi Services for Electro Mechanic Works Co.
(Closed Joint Stock Company)
SSEM HQ | Al- Rashid Tower |5 th & 6 th Floor
PO Box 6341 | Al Maather St. | Riyadh 11442, K.S.A
T: 011-462-5511 Ext. 562 |F: 011-462-7804 |M: +966503449697
Email: s.khurshid@ssem.com.sa | www.ssem.com.sa

From: Abdulaziz Mohamed Ragab


Sent: Saturday, March 08, 2014 11:58 AM
To: Nazim Baloch; SSEM-Department (Tendering)
Cc: Shujaat Khurshid; Muhammad Yazdani; Adnan Abdul Wahed; Edwardo Tenorio
Subject: RE: INTEGRATION OF SHUQAIQ-2 POWER PLANT380 KV OVERHEAD LINE

Good day
Please be informed that we have only general data that not enough to start any
estimation, therefore we regret to inform you that we cant give you any estimated
price.
Regards

From: Nazim Baloch


Sent: Saturday, March 08, 2014 10:23 AM
To: Abdulaziz Mohamed Ragab; SSEM-Department (Tendering)
Cc: Shujaat Khurshid; Muhammad Yazdani; Adnan Abdul Wahed; Edwardo Tenorio
Subject: RE: INTEGRATION OF SHUQAIQ-2 POWER PLANT380 KV OVERHEAD LINE

Dear Mr. Abdul Aziz,


The available information and afterwards correspondence with SEC has already
been shared with you. As already informed you that we have requested SEC for
Substation Visits but so far, there is no response. So, it is requested to send your
estimated offer by 10.03.2014, so that it can be compiled and prepared for
presentation to management in time.

Best Regards
Nazim Baloch
Electrical Engineer

Power Transmission Department

Saudi Services for Electro Mechanic Works Co.


(Closed Joints Stock Company)
SSEM HQ | Al- Rashid Tower |5 th & 6th floor
Al Maather St. | Riyadh 11442, KSA | PO Box 6341
T: 462-5511 Ext. 444 |F: 462-7804
Email: n.baloch@ssem.com.sa | www.ssem.com.sa

From: Abdulaziz Mohamed Ragab


Sent: Saturday, March 08, 2014 10:06 AM
To: Nazim Baloch; SSEM-Department (Tendering)
Cc: Shujaat Khurshid; Muhammad Yazdani; Adnan Abdul Wahed; Edwardo Tenorio
Subject: RE: INTEGRATION OF SHUQAIQ-2 POWER PLANT380 KV OVERHEAD LINE

Dear Mr. Nazim,


Good day
Please be informed that you dont provide us any data as requested in below emails, therefore we still waiting for these data in order to start our duty.
Regards

From: Nazim Baloch


Sent: Saturday, March 08, 2014 9:59 AM
To: Abdulaziz Mohamed Ragab; SSEM-Department (Tendering)
Cc: Shujaat Khurshid; Muhammad Yazdani; Adnan Abdul Wahed; Edwardo Tenorio
Subject: RE: INTEGRATION OF SHUQAIQ-2 POWER PLANT380 KV OVERHEAD LINE
Importance: High

Dear Mr. Abdul Aziz,


Please be reminded that the bid opening date for the subject tender 13.03.2014.
Therefore, please send your estimated price not later than 10.03.2014. Meanwhile,
we have sent a request for Substations Visit and so far there is no response from SEC.

Best Regards
Nazim Baloch
Electrical Engineer
Power Transmission Department

Saudi Services for Electro Mechanic Works Co.

(Closed Joints Stock Company)


SSEM HQ | Al- Rashid Tower |5 th & 6th floor
Al Maather St. | Riyadh 11442, KSA | PO Box 6341
T: 462-5511 Ext. 444 |F: 462-7804
Email: n.baloch@ssem.com.sa | www.ssem.com.sa

From: Abdulaziz Mohamed Ragab


Sent: Wednesday, February 19, 2014 12:53 PM
To: Nazim Baloch; SSEM-Department (Tendering)
Cc: Shujaat Khurshid; Muhammad Yazdani
Subject: RE: INTEGRATION OF SHUQAIQ-2 POWER PLANT380 KV OVERHEAD LINE

Dear Mr. Nazim,


Good day
Please be informed that we want to know the existing data for Control,

annunciation/Alarm, Metering and Monitoring systems like type, model,

manufacture, and availability spare or space for expansion. Moreover find attached
representative Iqama ID (Engr. Salman EE) from Bisha Project.
Regards

From: Nazim Baloch


Sent: Tuesday, February 18, 2014 9:24 AM
To: Abdulaziz Mohamed Ragab; SSEM-Department (Tendering)
Cc: Shujaat Khurshid; Muhammad Yazdani
Subject: RE: INTEGRATION OF SHUQAIQ-2 POWER PLANT380 KV OVERHEAD LINE

Dear Mr. Abdul Aziz,


As discussed, please forward us the possible checklist of the required information so
that we can check it internally if possible. Meanwhile, please send us the Iqama
copies of your engineers who want to visit the substations, so that we can apply for
access permit to these substations.

Best Regards
Nazim Baloch
Electrical Engineer
Power Transmission Department

Saudi Services for Electro Mechanic Works Co.


(Closed Joints Stock Company)

SSEM HQ | Al- Rashid Tower |5 th & 6th floor


Al Maather St. | Riyadh 11442, KSA | PO Box 6341
T: 462-5511 Ext. 444 |F: 462-7804
Email: n.baloch@ssem.com.sa | www.ssem.com.sa

From: Abdulaziz Mohamed Ragab


Sent: Monday, February 17, 2014 1:54 PM
To: Nazim Baloch; SSEM-Department (Tendering)
Cc: Shujaat Khurshid; Muhammad Yazdani
Subject: RE: INTEGRATION OF SHUQAIQ-2 POWER PLANT380 KV OVERHEAD LINE

Dear Mr. Nazim,


Good day
Could you provide us the schedule for site visit to prepare our representative for
attends.
Regards

From: Nazim Baloch


Sent: Monday, February 17, 2014 9:22 AM
To: Abdulaziz Mohamed Ragab; SSEM-Department (Tendering)
Cc: Shujaat Khurshid; Muhammad Yazdani
Subject: RE: INTEGRATION OF SHUQAIQ-2 POWER PLANT380 KV OVERHEAD LINE

Dear Mr. Abdulaziz,


The information available has already been shared with you. However, attached is
the site visit report (OHTL portion) just for your review. For further information the
substations can be visited to get the required details by your team. Thanks

Best Regards
Nazim Baloch
Electrical Engineer
Power Transmission Department

Saudi Services for Electro Mechanic Works Co.


(Closed Joints Stock Company)
SSEM HQ | Al- Rashid Tower |5 th & 6th floor
Al Maather St. | Riyadh 11442, KSA | PO Box 6341

T: 462-5511 Ext. 444 |F: 462-7804


Email: n.baloch@ssem.com.sa | www.ssem.com.sa

From: Abdulaziz Mohamed Ragab


Sent: Monday, February 17, 2014 9:01 AM
To: Nazim Baloch; SSEM-Department (Tendering)
Cc: Shujaat Khurshid; Muhammad Yazdani
Subject: RE: INTEGRATION OF SHUQAIQ-2 POWER PLANT380 KV OVERHEAD LINE

Dear Mr. Nazim,


Good day
With reference to pre-bid clarification no. 01, please be informed that our scope will
be limited to clauses 3.02B1, 2&3, clause 3.03 and clause 3.04. These clauses related
to control, annunciation/alarm, metering and monitoring modification works, so
please provide us the site visit report regarding substations in order to start our work.
Regards
From: Nazim Baloch
Sent: Saturday, February 15, 2014 9:11 AM
To: SSEM-Department (Tendering); Abdulaziz Mohamed Ragab
Cc: Shujaat Khurshid; Muhammad Yazdani
Subject: FW: INTEGRATION OF SHUQAIQ-2 POWER PLANT380 KV OVERHEAD LINE

Dear Mr. Abdulaziz Mohamed Ragab


Attached is the pre-bid clarification no. 01 of the subject tender for your information
and consideration tin your price.

Best Regards
Nazim Baloch
Electrical Engineer
Power Transmission Department

Saudi Services for Electro Mechanic Works Co.


(Closed Joints Stock Company)
SSEM HQ | Al- Rashid Tower |5 th & 6th floor
Al Maather St. | Riyadh 11442, KSA | PO Box 6341
T: 462-5511 Ext. 444 |F: 462-7804
Email: n.baloch@ssem.com.sa | www.ssem.com.sa

From: Shujaat Khurshid


Sent: Tuesday, January 21, 2014 1:36 PM
To: Muhammad Yazdani; Nazim Baloch; Gregory Aboy
Subject: INTEGRATION OF SHUQAIQ-2 POWER PLANT380 KV OVERHEAD LINE

For n.a please.


From: SSEM-Department (Tendering)
Sent: Tuesday, January 21, 2014 11:02 AM
To: Shujaat Khurshid
Cc: Jester Tubig; Abdulaziz Mohamed Ragab
Subject: INTEGRATION OF SHUQAIQ-2 POWER PLANT380 KV OVERHEAD LINE

Dear Mr. Shujaat,



Good Day.

Based on Substation Work as per clause 3.02 to 3.08 pages 41 to 44 of 108 in
PTS#12SO316, please find below our clarifications:
1. Clause 3.02
A) 80 MVAR SHUNT REACTORS for BISHA circuits are included in the SOW of
SHUQAIQ-2 Substation PTS # 12SN305; hence we understood this item will be
done by other. Please confirm.

B) EXISTING SYSTEM MODIFICATIONS AT EXISTING SHUQAIQ - 1 380kVS/S,
EXISTING KUDMI 380kVS/S , EXISTING ABHE 380kVS/S and NEW ONGOING
BISHA AND ASIR 380kVS/S. The control, annunciation, metering and
monitoring schemes for these Substations should be provided to us in order
to start our work.
2. Clause 3.03
The metering requirements at existing SHQ-1, KUDMI, ABHE 380kV
substations shall be newly provided or modified. So please provide us the
existing metering data for these Substations in order to start our work.
3. Clause 3.04
Provide and upgrade/modify alarm/annunciation at existing SHQ-1, KUDMI,
ABHE 380kV substations as per 38-TMSS-05 and TES-P- 119.27, Rev.01. So
please provide us TES-P- 119.27, Rev.01 and existing alarm/annunciation
data for these Substations in order to start our work.

4. Clause 3.05
COMMUNICATION SYSTEM REQUIREMENTS as per Appendix-VI there is no
Communication equipment like SDH, DVM, PSE and Media Converter only
required OPGW, UGNMFOC, OFMR and civil work. Hence we understood this
item will be done by OHL Contractor. Please confirm.
5. Clause 3.06
For Protection requirements, refer to Appendix-VII of Shuqaiq-2 Substation
PTS # 12SN305. We understood this PTS # 12SN305 under other Contractor
and not in our scope. Please confirm.
6. Clause 3.07
For SCADA, DSM and SOE requirements refer to Appendix-IX of Shuqaiq-2
Substation PTS # 12SN305. We understood this PTS # 12SN305 under other
Contractor and not in our scope. Please confirm.
7. Clause 3.08
Auxiliary Supply Voltage at existing SHQ-1, KUDMI, ABHE 380kV substations.
Noted.


Truly Regards
Abdulaziz Ragab
Electrical Engineer
Tendering Department
Saudi Services for Electro Mechanical Works Co. Ltd.
SSEM Main Office | Al- Rashid Tower | 5 th & 6 th floor
Al Maather Street|PO Box 6341|Riyadh, KSA 11442
T: 462-5511 Ext. 589|F: 462-7804 |M: 0593064600
Email: A.ragab@ssem.com.sa | www.ssem.com.sa

You might also like