ออกแบบ Water Tank on Pile กราฟ
ออกแบบ Water Tank on Pile กราฟ
BuildingRETENTION TANK
Engineer .41809
Location :
Date
###
Reference :
(Design Criteria)
Concrete :
240
ksc.
vc1
=0.29fc' =
4.49
ksc.
vc3
=1.32fc' =
20.45 ksc.
fc
vc2
vc4
Ec
Steel Reinf. :
=0.53fc' =
=1.65fc' =
15,100fc=
Modulus of elasticity
Es
fs
0.5fy
fs
0.5fy
fy
fy
=
Es/Ec
1/(1+fs/nfc)
0.5fckj
ksc.
25.56 ksc.
###
ksc.
### ksc.
3,000 ksc.
2,400 ksc.
1,700
=
1,700
=
=
1,500 ksc.
1,200 ksc.
8.72
0.274
8.098 ksc.
0.909
1/(1+fs/nfc)
0.321
0.5fckj
9.312 ksc.
1-k/3
8.21
1-k/3
0.893
RETENTION TANK
: 40
: 1.25
50
Fy
2,400 ksc.
Fy
40 .
2,200 ksc.
Fy
40 .
700 ksc.
:
E-70
200
kg/m2
2,400
kg/m3
1,380
kg/m3
=
=
=
=
2,200
1,000
20
kg/m3
kg/m3
kg/m2
Degree
6.00
m.
3.80
m.
W'
=
=
= (1-sin) / (1+
= w . H
P3
= Ka . d . H
1,900
kg/m3
Ka
P1
1,000
P2
P4
P4
ww . H
= Ka . '. H
= Ka . Surchage
=
=
=
=
7.20
0.30
0.490
m.
m.
###
kg/m2
###
kg/m2
###
###
490.14
kg/m2
kg/m2
kg/m2
RETENTION TANK
Max. negative vertical moment at CvMax. negative horizontal moment aCHMax. positive vertical moment
Cv+
1.89
0.076
0.016
0.014
cm.
RETENTION TANK
0.004
RETENTION TANK
1 ( 1 )
Mv-
###
kg-m.
MH-
###
kg-m.
Mv+
MH+
###
###
2
( 1 )
Cracking moment
fr
###
kg-m.
MH-
###
kg-m.
MH+
=
Mmax/R.B =
(Covering)
USE
DB 12 mm.
DB 20 mm.
DB 16 mm.
M.c
USE
=
=
=
16
mm.
As1
DBW1
16 mm.
USE
29.74
21.22
45.00
5.00
39.00
As = M/fs.j
=
DB 16 mm. As1 =
DBW1
16 mm.
@
USE
=
Asmin = 0.0015bh
Ast
= f2/ft
Ash = M/fs.j.d
376.90
39.40
=
d
###
Mc = Rbd2 =
DB
kg-m.
Mv-
Mv+
kg-m.
@
=
39.20
39.40
###
kg-m.
kg-m.
cm.
ksc.
cm.
cm.
cm.
cm.
cm.
kg-m > MO.K.
max
cm2/m.
0.151
m.
0.150
=
6.75
6.64
8.82
2.01
0.130
0.125
O.K.
cm.
13.34
2.01
###
cm2
m.
cm2/m.
O.K.
cm2/m.
cm2/m.
cm2
m.
m.
cm.
=
O.K.
RETENTION TANK
40.00
DB 12 mm.
34.40
DB 20 mm.
34.00
(Covering)
DB 16 mm.
d
USE
=
d
5.00
34.20
34.40
462.56
dai
0.35
m.
M = WL2/8
Mc = Rbd2
12
As = M/fs.j
mm.
As1
DBW1
12 mm.
USE
13.22
1.05
4.00
4.00
16.00
1.90
DB
35.00 =
=
=
###
###
###
5.21
0.217
=
=
1.13
0.200
cm.
cm.
cm.
O.K.
cm.
cm.
cm.
cm.
ton.
=
pile
ton/ pile
m.
pile
pile
pile
kg/m2
O.K.
m.
kg-m.
kg-m > MO.K.
max
cm2/m.
cm2
m.
m.
O.K.
RETENTION TANK
108.35
ton.=
78.25
ton.=
49.42
236.02
181.44
1.30
108.35
49.42
157.77
181.44
0.87
ton.
=
ton.
=ton.
O.K.
ton.=
ton.
=
ton.
=ton.
FAIL.
108.35
ton.=
142.36
=ton.
181.44
=ton.
49.42
300.12
1.65
ton.
=
ton.
O.K.
Project
:
Building :
Location :
Owner
:
Engineer .41809
Date
###
(Design Criteria)
Reference :
Concrete :
250
ksc.
vc1
=0.29fc' =
4.59
ksc.
vc3
=1.32fc' =
20.87 ksc.
Ec
15,100fc=
fc
vc2
Steel Reinf. :
vc4
=0.53fc' =
=1.65fc' =
Modulus of elasticity
Es
fs
0.5fy
fs
0.5fy
fy
=
Es/Ec
1/(1+fs/nfc)
0.5fckj
fy
1-k/3
1/(1+fs/nfc)
0.5fckj
1-k/3
8.38
ksc.
26.09 ksc.
###
ksc.
### ksc.
3,000 ksc.
2,400 ksc.
=
1,700
=
1,700
=
1,500 ksc.
1,200 ksc.
8.54
0.270
7.991 ksc.
=
=
0.910
0.316
9.198 ksc.
0.895
: 40
: 1.25
50
Fy
2,400 ksc.
Fy
40 .
2,200 ksc.
Fy
40 .
700 ksc.
:
E-70
200
kg/m2
2,400
kg/m3
1,380
kg/m3
=
=
=
=
2,200
1,000
20
kg/m3
kg/m3
kg/m2
Degree
6.00
m.
4.20
m.
W'
=
=
= (1-sin) / (1+
= w . H
P3
= Ka . d . H
1,900
kg/m3
Ka
P1
1,000
P2
P4
P4
ww . H
= Ka . '. H
= Ka . Surchage
=
=
=
=
7.10
0.30
0.490
m.
m.
###
kg/m2
###
kg/m2
###
###
490.14
kg/m2
kg/m2
kg/m2
Cv+
1.69
0.076
0.016
=
=
0.014
0.004
cm.
1 ( 1 )
Mv-
###
kg-m.
MH -
###
kg-m.
Mv
MH
###
###
2
( 1 )
Mv
MH
Cracking moment
fr
(Covering)
###
kg-m.
###
kg-m.
MH+
=
Mmax/R.B =
USE
DB 12 mm.
DB 20 mm.
DB 16 mm.
M.c
=
=
=
d
USE
Mc = Rbd
DB
16
mm.
As1
16 mm.
DBW1
DB 16 mm.
34.66
28.44
45.00
4.50
39.50
=
=
@
=
39.70
39.50
###
17.81
2.01
0.11
0.10
=
6.75
9.36
9.37
2.01
0.11
0.10
22.89
lb = 0.06 Ab. fy/fc'
(Covering)
DB 12 mm.
USE
505.24
39.90
As = M/fs.j
=
DB 16 mm. As1 =
16 mm.
@
DBW1
USE
=
Asmin = 0.0015bh
Ast
= f2/ft
Ash = M/fs.j.d
###
=
=
d
USE
40.00
34.90
kg-m.
=
=
Mv+
kg-m.
=
=
4.50
34.70
###
kg-m.
kg-m.
cm.
ksc.
cm.
O.K.
cm.
cm.
cm.
cm.
cm.
kg-m > MO.K.
max
cm2/m.
cm2
m.
m.
cm2/m.
O.K.
cm2/m.
cm2/m.
cm2
m.
m.
cm.
=
cm.
cm.
cm.
cm.
cm.
O.K.
O.K.
DB 20 mm.
34.50
0.96
26.04
2.14
ton./m.
6.51
ton.-m.
USE
M
M
Mc = Rbd2
DB
16
As = M/fs.j
mm.
As1
16 mm.
DBW1
USE
=
=
=
M
M
Mc = Rbd
DB
16
As = M/fs.j
mm.
As1
16 mm.
DBW1
USE
1.18
0.16
###
13.75
0.15
4.54
34.70
2.01
0.15
ton.
ton/side
cm2/m.
cm2
m.
m.
4.56
ton./m.
=
=
=
1.18
6.51
0.63
###
13.75
0.15
2.01
0.15
ton.-m.
118.84
48.79
cm2
m.
m.
ton.=
1.29
cm2/m.
85.93
195.96
FAIL.
ton.-m.
kg-m > MO.K.
max
ton.=
253.56
ton./m.
118.84
48.79
ton.-m.
kg-m > MO.K.
max
ton./m.
ton./m.
ton./m.
5.52
cm.
cm.
ton.
=
ton.
=ton.
O.K.
ton.=
ton.
=
FAIL.
167.63
195.96
0.86
ton.
=ton.
FAIL.
118.84
ton.=
155.01
=ton.
195.96
=ton.
48.79
322.64
1.65
ton.
=
ton.
O.K.