NORMATIVI:
NOSIVI ZIDOVI
MATERIJAL
OPIS
RAD
OPEKA
MORT
KV
PKV
kom
sat
sat
1.
36
0.17
2.25
1.30
2.
42
0.18
2.10
0.80
3.
53
0.18
2.25
0.95
4.
43
0.11
2.10
0.95
5.
54
0.11
2.25
0.95
6.
43
0.61
4.10
2.95
OBRAUN:
OPIS STAVKE:
ZA 1m3 ZIDA
ZIDANJE OPENEGA ZIDA SA SVIM POTREBNIM RADOVIMA
RAD
OPEKA
MORT
KV
PKV
kom
sati
sati
1.
0.006
0.60
0.20
2.
0.0055
0.60
0.20
3.
0.0045
0.60
0.20
5.
17
0.015
0.80
0.30
6.
50
0.04
0.90
0.30
7.
50
0.06
2.00
0.50
8.
1.15
0.25
Izradio:
Tomislav FRANKO i.g.
0.0045
ARM.: 0,90 kg
WIENERBERGER
OBRAUN:
STAVKE 1-7, ZA 1m2 ZIDA i PREGRADNE STJENE
STAVKA 8., ZA 1m1 VERTIKANOG PROTUPOTRESNOG SERKLAA
VERTIKALNI SERKLA
MATERIJAL
OPIS
RAD
UGAO
MORT
KV
PKV
kom
1.
0.006
0.30
0.10
2.
0.005
0.20
0.10
OBRAUN:
OPIS STAVKE:
STROPNI SUSTAV
MATERIAL
OPIS
PTH SERKLA
GREDICA
ISPUNA 16/60
ISPUNA 10/60
kom
m1
kom
kom
1.67
6.7
PO PROJEKTU
2.
ZIDANJE SA POROTHERM
SERKLAOM PO OBODU
PLOE
dimenzije: 11,5 x 33 x 21
OBRAUN:
STAVKA 1, ZA 1m2 STROPA
STAVKA 2, ZA 1m1 OBODA PLOE
OPIS STAVKE:
POLAGANJE POROTHERM GREDICA I ISPUNA, POSTAVLJANJE I VEZANJE ARMATURE TE BETONIRANJE TLANE PLO
IZRADA MORTA, BETONA, PODUPIRANJE, OBRAUNAVAJU SE POSEBNO
POROTHERM NADVOJI
Izradio:
Tomislav FRANKO i.g.
WIENERBERGER
MATERIJAL
OPIS
RAD
NADVOJ
MORT
KV
PKV
1.
NADVOJI DO 2,50m
0.003
0.16
0.08
2.
0.002
0.16
0.16
OBRAUN:
ZA 1m1 NADVOJA
OPIS STAVKE:
Izradio:
Tomislav FRANKO i.g.
WIENERBERGER
Izradio:
Tomislav FRANKO i.g.
WIENERBERGER
RIAL
ARMATURA
BETON
MORT
kg
m3
m3
2.50
0.0076
0.0005
0.002