Professional Documents
Culture Documents
f'c =
fy =
beff =
bw =
beff
4000 psi
60000 psi
45 in.
12 in.
19.5 in.
4 in.
1.73984 in2
d=
hf =
As =
1 =
0.85
As min
3 f
As min
fy
'
c
bw d
0.74 in2
bw
As min =
200
bw d
fy
0.78 in2
clear span
between
parallel T
beams
bw
0.78 in2
minimum steel is OK
<-- controls
If a < hf
As f y
0.85 f c'b
0.68 in.
0.0019827
Mn = Asfy (d - a/2) =
2000000 in-lb =
c = a/1 =
0.80
d c
0.003 0.0698796
c
=
Mn
0.9
1800000 in-lb =
If a > hf:
Asf
166.7 ft-k
150.0 ft-k
fy
Asw = As - Asf =
Asw f y
0.85 f c' b
-5.74
M n Asf f y (d
c = a/1 =
7.48 in2
-8.44
hf
a
) Asw f y (d ) 2
2
-9.93
d c
0.003
c
M nf Asf f y (d
hf
2
k-in
7854
5105
a
M nw Asw f y (d ) -8170
2 -5310
k -in =
d c
0.003 -0.008891
c
=
Mn
0.65
k -in =
see solution
above
ft-k
ow - cells C3 through C9
hf
d
minimum steel is OK
k - ft
= Mnf =
654.5
= Muf =
425.4
= Mnw =
-680.8
= Muw =
-442.5
ft-k
or
z=
#VALUE!
T Beam Design
f'c =
3000 psi
fy =
60000 psi
beff =
79 in.
bw =
15 in.
26 in.
d=
hf =
beff
4 in.
Mu =
clear span
between
parallel T
beams
1497.5 ft-k
-
1 =
0.85
Mtu =
1450.4 ft-k
bw
bw
If a < hf
Rn
Mu
bd 2
373.88 in.
0.85 f c'
2 Rn
1 1
f y
0.85 f c'
f y d
a
0.85 f c'
0.006771
4.142038 in.
c = a/1 =
4.872986
d c
0.003
0.013007
c
As min
As min
=
0.9
Asbd 13.90689 in2
If a > hf:
Asf
3 f c'
fy
bw d
200
bw d
fy
fy
Muf = Asffy (d - hf/2) =
Muw = Muf - Mu
Rnw
M uw
bw d 2
0.85 f c'
w
fy
10.88 in2
1175.0 ft - k =
14100 k - in
322.5 ft - k =
3870 k - in
424.0
1 1
2 Rnw
0.85 f c'
0.85 f c'
w
fy
1 1
2 Rnw
0.85 f c'
w f yd
0.85 f
'
c
c = a/1 =
d c
0.003
c
=
Asw =bwd =
As = Asw + Asf =
0.007779
4.759 in.
5.599 in.
0.0109
0.9
3.03 in2
As min
3 f c'
13.91 in2
As min
fy
bw d
200
bw d
fy
lls C3 through C9
hf
d
3 f c'
fy
bw d 1.068059 in2
200
bw d
fy
1.3 in2
<-- controls
3 f c'
fy
bw d 1.068059 in2
200
bw d
fy
1.3 in2
<-- controls