DATOS:
Fy = 4200 Kg/cm2
Fc = 210 Kg/cm2
S/C = 200 Kg/cm2
con = 2400 Kg/m3
P. Propio = 360 Kg/m2
P.Acabados = 100 Kg/m2
a) Espesor de la Losa
L 400
h= = = 0.15 m.
28 28
b) Cargas ultimas
W= 1.5 CM + 1.8 CV
W= 1.50 (460 Kg/cm2) + 1.80 (200 Kg/m2) = 690 Kg/m2 + 360 Kg/m2
W= 1050 Kg/m2
W= 1.05 Ton/m2
MOMENTOS
. MUNICIPALIDAD PROVINCIAL DE SULLANA
DIVISION DE ESTUDIOS
Momentos Negativos
1 1
M = WU Ln = (1.05 )( 4) 2
11 11
M = 1.53 Tn.m
Momentos Positivos
1 1
M+ = WU Ln = (1.05 )( 4) 2
14 14
M + = 1.20 Tn.m
ACERO MINIMO
AS min = 2.70 cm 2
f 'c
AS min = 0.7 b d d = 15 2 0.64 = 12.36 cm
fy
210
AS min = 0.7 (100 )(12 .36 ) = 2.98 cm 2 / m
4200
AS min = 2.98 cm 2
AS min = 2.98 cm 2
Momentos Negativos
. MUNICIPALIDAD PROVINCIAL DE SULLANA
DIVISION DE ESTUDIOS
M = 1.53 Ton.m
a= 0.008 m.
1 @ 0.30 mt.
Momentos Positivos
M + = 1.20 Ton.m
a= 0.006 m.
1 @ 0.30 mt.
1.05 m. 1.05 m.
@ 0.30 mt.
Corte en el apoyo 1
1
Vu = ( 4.00 )(1.05 )(1.15 ) = 2.42 Ton
2
Vu = 2.42 Ton
Corte en el apoyo 2
1
Vu = ( 4.00 )(1.05 ) = 2.10 Ton
2
. MUNICIPALIDAD PROVINCIAL DE SULLANA
DIVISION DE ESTUDIOS
Vu = 2.10 Ton
V c = 0.53 f 'c b d
V c = 8068 .29