SJA FORM / ANALIZA RIZIKA OBRAZAC

Project/ Projekt: 420 kV rskog- Fardal


Appendix to Procedure for Safe Job Analysis/ Prilog procedure za Analizu rizika
SJA Title/Naslov : Upotreba amca izmeu stupova FM270 - FM271. Persons responsible for SJA/Osobe odgovorna za
Use of the boat between the towers FM270 - FM271. SJA:
Bruno Buljan / Branimir Bonovil
Project/ Projekt: 420 kV rskog- Fardal
SJA Meeting / SJA Date/Datum: Time/ Location/ Lokacija: Svelgen
Sastanak:58/2015. 28.07.2015. Vrijeme:
07:30
Description of work- Use of the boat between the columns FM270 and FM271.
/Opis posla: Upotreba amca izmeu stupova FM270 I FM271.
Requirements/Preconditions / Zahtjevi/ Preduvjeti: Total number
1. Method of Performing the Stringing Works_OF_S_rev 1 attachments
Procedure za izvoenje elektromontanih radova / Ukupan
2. SU-4 General instructions for safe operations during stringing works broj priloga:
SU -4 - Ope upute za siguran rad tijekom izvoenja elektromontanih radova
3. Communication table - Airlift 7
Tablica komunikacije s pilotima koji izvode zrane operacije (Airlift)
4. Dalekovod NUF Work procedure work near high voltage lines
Dalekovod NUF - Uputa za siguran rad u blizini vodova pod naponom
5. Dalekovod NUF Safety measures while using fiber straps/slings for carrying load
Dalekovod NUF - Radna procedura - Mjere sigurnosti tijekom koritenja sintetikih ueta za prijenos tereta
6. Dalekovod NUF Notification about accident/injury/incidents on site
Dalekovod NUF - Plan postupanja u sluaju nastanka nezgoda i izvanrednih situacija prilikom izgradnje objekata
7. Competence to operate a motor boat.
Osposobljenost za rukovanje motornim amcem.

1
Date of
Person measure
Element of Possible
No responsibl implemented
Subtask/ risk/danger/ consequence Measure /
./ e/ /
Podzadatak Elementi rizika/ / Mogue Mjere
Br. Odgovorn Datum
opasnosti posljedice
a osoba usvojene
mjere
2. Entry and exit from The fall of workers, Injuries Before entering into the boat it is necessary a
the boat maximum closer a boat before you step on it Foreman
Workers
Ulazak I izlazak iz Pad radnika, Ozljeda Prije ulaska u amac amac je potrebno maksimalno Poslovoa
amaca pribliiti prije nego kroite na njega Radnici
28.07.2015.

3. Handling the boat The fall of workers Injuries, The person who operating the boat, must be trained Foreman
material for handling a boat Workers
Rukovanje amcem Pad radnika, damage Poslovoa
Osoba koja rukuje amcem, mora biti osposobljena za Radnici
Ozljeda, rukovanjem amca
materijalna 28.07.2015.
teta
4. Safety on the water The fall of workers Injuries All the persons who is staying on the boat must have Foreman
a life west for rescue. Workers
Sigurnost na vodi Pad radnika, Ozljeda Sve osobe koje borave na amcu moraju imati Poslovoa
sigurnosni pojas za spaavanje Radnici

28.07.2015.
5. A long stay on the The fall of workers Injuries All the persons who staying on the board must have Foreman
water. lunch packets and water supply Workers
Pad radnika, Ozljeda Sve osobe koje borave na brodu moraju imati sa Poslovoa
Dugotrajan boravak sobom hranu i zalihu vode Radnici
na vodi 28.07.2015.

2
6. An irresponsible The fall of workers Injuries The person who is operating the boat must warn the
driving the other and people other participants who are sailing in the lake that is a Foreman
participants who is Ozljeda forbidden approaching a danger zone where they Workers
sail on the lake Pad radnika I ljudi Poslovoa
performed stringing operations.
Radnici 28.07.2015.
Nepanja ostalih
Osoba koja rukuje amcem mora upozoravati ostale
sudionika koji
prometuju jezerom sudionike koji plove jezerom da se ne pribliavaju
opasnoj zoni gdje se izvode elektromontani radovi.

7. The fall of workers Injuries


Lack of and people
communication Ozljeda The person who is operating the the boat must have
Pad radnika I ljudi radio contact so that exchangeable information
Nedostatak relating to the movement of boats on the lake.
komunikacije 28.07.2015.
Osoba koja rukuje amcem mora imati radio vezu
tako da izmjenjiva informacije vezane za kretanje
amaca po jezeru.

8 Use/ not use of the The fall of workers Injuries The boat will be used only when the conductors in the 28.07.2015.
boat and people water while the conductors in the air there is no need
Koritenje / Ozljeda for constant used of boat.
nekoritenje amca Pad radnika I ljudi
Brod e se koristiti samo kada je faza u void, kada je
faza u zraku nema razloga za konstantnom
upotrebom amca.

Is the overall risk acceptable? (Yes/No) Approval/Recommendatio Date/signature Summary of experience/lessons


Da li je ukupan rizik prihvatljiv? (Da/Ne) n Datum/ Potpis learned after the work is completed:
Odobrenje/Preporuka Iskustva/ lekcije nauene nakon

3
Person responsible for zavretka posla:
SJA:
Osoba odgovorna za
Analizu rizika:
Site manager
Bruno Buljan
Conclusion/Comments: Person responsible for
Zakljuak/ Komentar: implementation /
Workers should be introduced with all the details Osoba odgovorna za
related to the specific in section in which works are implementaciju:
to be performed. Site manager
All equipment and tools used for those purpose Bruno Buljan
must be certified. HSE Officer
Weather and weather conditions must be monitored Branimir Bonovil.
and in the event of bad weather conditions
additional measures have to be considered
Radnici trebaju biti upoznati sa svim detaljima Person responsible for
vezanim uz specifinosti na sekciji na kojoj se izvode work on project/site or
radovi. within area/ Osoba
Sva oprema i alat koji se koriste moraju biti odgovorna za rad na
certificirana. projektu/terenu:
Vremenska prognoza I vremenski uvjeti se moraju Foreman:
pratiti te u tom smislu poduzimati potrebne Zoran Jerkovi
aktivnosti u sluaju loeg vremena.