Location D&D: Edge beam Grid 1 from A to J rmw 31-May-2017 176
CONTINUOUS CONCRETE BEAM DESIGN to BS 8110:2005 TablChecked Revision Job No
Originated from RCC95.xls v4.0 on CD 2006 TCC chg - R68

LOCATION ports: from grid A to grid J STATUS


VALID DESIGN
DIMENSIONS MATERIALS m 1.50
N of spans N 5 Shape L BEAM fcu N/mm 40 m 1.15
Max Span m 5.00 Top cover mm 40 fyl N/mm 500 steel class A
depth, h mm 350 Bottom cover mm 40 fyv N/mm 500 Density kN/m 23.6
bw mm 300 Side cover mm 40 h agg mm 20 (Normal weight concrete)
hf mm 175 pport steel in alt layer ? Y
bf mm 650 100
50
LOADING
0
Self Wt kN/m 1.2
+ Dead kN/m 10.9 -50
Total Dead, gk kN/m 12.1 -100
Imposed qk kN/m 5.0 A J A J
Design load, n = kN/m 25.0 Geometry and Loading Indicative Bending Moment Diagram

BENDING END END FIRST INT INTERIOR INTERNAL BS8110


SUPPORTS (A & J) SPANS SUPPORTS SPANS SUPPORTS Reference
M kNm 0.0 56.2 68.7 43.7 50.0 Table 3.5
d mm 276 290 270 294 270
bf mm 300 650 300 650 300 3.4.1.5
As mm 0 470 648 360 457 3.4.4.4
As' mm 0 0 0 0 0 3.4.4.4
Deflection
L/d Max 36.46 37.98 3.4.6.3
Actual L/d 17.24 OK 17.01 OK 3.4.6.1

Tension reinforcement
16 20 20 12 20
No 2 Top 2 Btm 3 Top 4 Btm 2 Top
As prov mm 402 628 942 452 628
= % 0.49 0.72 1.16 0.51 0.78
Compression reinforcement
16 12 12 12 12
No 2 Btm 2 Top 2 Btm 2 Top 2 Btm
As' prov mm 402 226 226 226 226
= % 0.49 0.26 0.28 0.26 0.28

SHEAR OUTER SUPT FIRST INT SUPT INT SUPT NOMINAL


V kN/m 56.2 75.0 68.7 ~ Table 3.5
v N/mm 0.646 0.926 0.849 ~ Eqn 3
vc N/mm 0.570 0.858 0.749 ~ Table 3.8
Link mm 10 10 10 10
Legs No 2 2 2 2
@ mm 200 200 200 200

OUTPUT/SUMMARY
END END FIRST INT INTERNAL INTERNAL
SUPPORTS SPANS SUPPORTS SPANS SUPPORTS
PROVIDE 2 H16 T 2 H12 T 3 H20 T 2 H12 T 2 H20 T
Main reinforcement Nominal B 2 H20 B Nominal B 4 H12 B Nominal B

Links 2 H10 @ 200 2 H10 @ 200 2 H10 @ 200 2 H10 @ 200 2 H10 @ 200
from CL of support for 800 for 600 for 600

CHECKS BAR SINGLE BAR SHEAR GLOBAL


< COVER LAYERS SPACING DEFLECTION LINKS STATUS
OK OK OK OK OK VALID DESIGN
Project Spreadsheets to BS 8110 The Concrete Centre
Client Advisory Group Made by Date Page
Location D&D: Edge beam Grid 1 from A to J rmw 31-May-2017 178
CONTINUOUS CONCRETE BEAM DESIGN to BS 8110:2005 Table 3.5 Checked Revision Job No
Originated from RCC95.xls v4.0 on CD 2006 TCC chg - R68

SHEAR
OUTER FIRST INT INTERNAL NOMINAL
SUPPORT SUPPORT SUPPORT
Factor 0.45 0.60 0.55 ~ Table 3.5
V kN 56.2 75.0 68.7 ~ -=-

v N/mm 0.646 0.926 0.849 ~ Eqn 3

vc N/mm 0.570 0.858 0.749 ~ Table 3.8

(v-vc)bv N/mm 120.0 120.0 120.0 120.0 Table 3.7


Link ok 10 ok 10 ok 10 ok 10 3.12.7.1
Legs ok 2 ok 2 ok 2 ok 2
@ mm 218 203 203 218 3.12.7.1
Adjust to mm 200 200 200 200
for mm 0 0 0 --- from cl of supt
Adjust to mm 800 600 600 ---
As Dist ok 0.0 ok 90.0 ok 0.0 ok 0.0 3.4.5.5
As' Dist ok 0.0 ok 0.0 ok 0.0 ok 0.0 3.12.7.2
Project Spreadsheets to BS 8110 The Concrete Centre
Client Advisory Group Made by Date Page
Location D&D: Edge beam Grid 1 from A to J rmw May-2017 179
CONTINUOUS CONCRETE BEAM DESIGN to BS 8110:2005 Table 3.5 Checked Revision Job No

Originated from RCC95.xls v4.0 on CD 2006 TCC chg - R68


APPROX WEIGHT of REINFORCEMENT
No Of No Type Dia Length Unit wt Weight
TOP STEEL

End support 2 2 H 16 1925 1.578 12.2


End span 2 2 H 12 3200 0.888 11.4
First Int support 2 3 H 20 3000 2.466 44.4
Internal span 3 2 H 12 3200 0.888 17.0
Internal support 2 2 H 20 3000 2.466 29.6

BOTTOM STEEL

End support 2 2 H 16 950 1.578 6.0


End span 2 2 H 20 4650 2.466 45.9
First Int support 2 2 H 12 1200 0.888 4.3
Internal span 3 4 H 12 4650 0.888 49.5
Internal support 2 2 H 12 1200 0.888 4.3

LINKS

End span 2 7 H 10 1050 0.617 9.1


2 18 H 10 1050 0.617 23.3
Internal span 3 6 H 10 1050 0.617 11.7
3 19 H 10 1050 0.617 36.9

SUMMARY spacers not included Approx total reinforcement in bay (kg) 305
Reinforcement density (kg/m3: based on bw.d) 115.0
Project Spreadsheets to BS 8110
Location D&D: Edge beam Grid 1 from A to J GRAPH DATA I
CONTINUOUS CONCRETE BEAM DESIGN to BS 8110:2005 Table 3.5
Originated from RCC95.xls v4.0 on CD 2006 TCC

LOADING DIAGRAM
X 0 0 25 25 gk = 12.14
Dead 0 12.14 12.14 0 qk = 5.00
Imposed 12.14 17.14 17.14 12.14 F/2 = 62.49
Base 0 0 0 0
Supports 0 0 5 5 10 10 15 15 20 20 25 25 25 25 25 25 25 25
-3.428 0 -3.428 0 -3.428 0 -3.428 0 -3.428 0 -3.428 0 -3.428 0 -3.428 0 -3.428 0
BM DIAGRAM
Support 1 End 2 Mid 3 Mid
Local X 0 0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 0 0.5 1 1.5 2 2.5
Global X 0 0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 5 5.5 6 6.5 7 7.5 8 8.5 9 9.5 10 10.5 11 11.5 12 12.5
Base 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Moment 0 0 -21.247 -36.244 -44.993 -47.492 -43.743 -33.745 -17.497 4.9992 33.745 68.739 38.744 14.998 -2.4996 -13.748 -18.747 -17.497 -9.9984 3.7494 23.746 49.992 21.872 0 -15.623 -24.996 -28.121
28.121 49.992 65.615 74.988 78.113 74.988 65.615 49.992 28.121
Gridlines 5 5 10 10 15 15 20 20 25 25 25 25 25 25 25 25
75.613 -47.492 75.613 -47.492 75.613 -47.492 75.613 -47.492 75.613 -47.492 75.613 -47.492 75.613 -47.492 75.613 -47.492
GRAPH DATA II

4 Mid 5 End 6
3 3.5 4 4.5 0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 0 0 0 0
13 13.5 14 14.5 15 15.5 16 16.5 17 17.5 18 18.5 19 19.5 20 20.5 21 21.5 22 22.5 23 23.5 24 24.5 25 25 25 25
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
-24.996 -15.623 0 21.872 49.992 23.746 3.7494 -9.9984 -17.497 -18.747 -13.748 -2.4996 14.998 38.744 68.739 33.745 4.9992 -17.497 -33.745 -43.743 -47.492 -44.993 -36.244 -21.247 0 0 0 0
GRAPH DATA III
Made by rmw Job No R68
Date 31-May-17

0 7 0 8 0 9
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Disclaimer
All advice or information from MPA-The Concrete Centre is intended for those who will evaluate the significance and limitations of its
contents and take responsibility for its use and application. No liability (including that for negligence) for any loss resulting from such advice
or information is accepted by MPA-The Concrete Centre or its subcontractors, suppliers or advisors. Users should note that all MPA-The
Concrete Centre software and publications are subject to revision from time to time and they should therefore ensure that they are in
possession of the latest version.

This spreadsheet should be used in compliance with the accompanying publication 'User Guide RC Spreadsheets: v4' available from The
Concrete Centre www.concretecentre.com/rcdesign Tel +44 (0)1276 606800

Status of spreadsheet This spreadsheet is shareware but may not be used for commercial purposes until the user has
Public release version. registered with The Concrete Centre using the licence validation form available on The Concrete
Centre website www.concretecentre.com/rcdesign

Revision history RCC95 Continuous Beams (Tables)

Date Version Action Size (kB)


1-Apr-10 RCC95 v4.0 Re-badged as TCC/Mineral Products Association. 300
28-Jun-06 RCC95 v3.1 v3 release. Page nos, User Guide and registration details amended. 265
12-Nov-05 RCC95 v3.0 Updated to 2005 versions of BS8110 & BS8666 295
22-Jan-03 RCC95 v2.1 DETR logo replaced by DTI. 258
26-Nov-02 RCC95 v2.0 Version 2 enhancements & 3 span bug fixed. 276
First public release.
6-Aug-99 RCC11 v1.0 189
Includes b version comments

You might also like