0% found this document useful (0 votes)
77 views6 pages

Gas Pipeline Shoring Design Calculation

This document provides design calculations for temporary shoring for an excavation pit needed for hot tapping of a gas transmission pipeline from Meranti View to Banyan Avenue in Jurong Island. It includes drawings showing the location and design of the temporary shoring. The calculations are based on a soil investigation report for the site which is referenced. The temporary shoring is needed to excavate safely and prevent collapse of the excavation for the hot tapping work on the gas transmission pipeline.

Uploaded by

Teddy TP
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
77 views6 pages

Gas Pipeline Shoring Design Calculation

This document provides design calculations for temporary shoring for an excavation pit needed for hot tapping of a gas transmission pipeline from Meranti View to Banyan Avenue in Jurong Island. It includes drawings showing the location and design of the temporary shoring. The calculations are based on a soil investigation report for the site which is referenced. The temporary shoring is needed to excavate safely and prevent collapse of the excavation for the hot tapping work on the gas transmission pipeline.

Uploaded by

Teddy TP
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd

DESIGN CALCULATION

Project Tile:

LAYING OF GAS TRANSMISSION PIPELINE FROM


MERANTI VIEW TO BANYAN AVENUE IN JURONG
ISLAND

Description:

TEMPORARY SHORING FOR HOT TAPPING


EXCAVATION PIT
TABLE OF CONTENTS

1.0.DRAWING No. P4262-SK(C)-03 SHT 1/2 : LOCATION OF


TEMPORARY SHORING FOR HOT TAPPING EXCAVATION PIT........... 3
2.0.DRAWING No. P4262-SK(C)-03 SHT 2/2 : TEMPORARY SHORING
FOR HOT TAPPING EXCAVATION PIT. ......................................................... 4
3.0.CALCULATION TEMPORARY SHORING FOR HOT TAPPING
EXCAVATION PIT................................................................................................. 5
4.0.REFERENCE DOCUMENT: ........................................................................... 6
4.1.FINAL REPORT BY SOIL & FOUNDATION (PTD) LTD: SOIL
INVESTIGATION WORKS FOR BANYAN OTS AT BANYAN AVE,
JURONG ISLAND, SINGAPORE FOR POWERGAS LTD. REPORT NO.
S3697/10 DATE: 16 NOV, 2010........................................................................... 6
1.0. DRAWING No. P4262-SK(C)-03 SHT 1/2 : LOCATION OF TEMPORARY SHORING
FOR HOT TAPPING EXCAVATION PIT.
2.0. DRAWING No. P4262-SK(C)-03 SHT 2/2 : TEMPORARY SHORING FOR HOT
TAPPING EXCAVATION PIT.
3.0. CALCULATION TEMPORARY SHORING FOR HOT TAPPING EXCAVATION PIT.
5.0. REFERENCE DOCUMENT:
5.1. FINAL REPORT BY SOIL & FOUNDATION (PTD) LTD: SOIL INVESTIGATION WORKS
FOR BANYAN OTS AT BANYAN AVE, JURONG ISLAND, SINGAPORE FOR
POWERGAS LTD. REPORT NO. S3697/10 DATE: 16 NOV, 2010

You might also like