DESIGN CALCULATION
Project Tile:
LAYING OF GAS TRANSMISSION PIPELINE FROM
MERANTI VIEW TO BANYAN AVENUE IN JURONG
ISLAND
Description:
TEMPORARY SHORING FOR HOT TAPPING
EXCAVATION PIT
TABLE OF CONTENTS
1.0.DRAWING No. P4262-SK(C)-03 SHT 1/2 : LOCATION OF
TEMPORARY SHORING FOR HOT TAPPING EXCAVATION PIT........... 3
2.0.DRAWING No. P4262-SK(C)-03 SHT 2/2 : TEMPORARY SHORING
FOR HOT TAPPING EXCAVATION PIT. ......................................................... 4
3.0.CALCULATION TEMPORARY SHORING FOR HOT TAPPING
EXCAVATION PIT................................................................................................. 5
4.0.REFERENCE DOCUMENT: ........................................................................... 6
4.1.FINAL REPORT BY SOIL & FOUNDATION (PTD) LTD: SOIL
INVESTIGATION WORKS FOR BANYAN OTS AT BANYAN AVE,
JURONG ISLAND, SINGAPORE FOR POWERGAS LTD. REPORT NO.
S3697/10 DATE: 16 NOV, 2010........................................................................... 6
1.0. DRAWING No. P4262-SK(C)-03 SHT 1/2 : LOCATION OF TEMPORARY SHORING
FOR HOT TAPPING EXCAVATION PIT.
2.0. DRAWING No. P4262-SK(C)-03 SHT 2/2 : TEMPORARY SHORING FOR HOT
TAPPING EXCAVATION PIT.
3.0. CALCULATION TEMPORARY SHORING FOR HOT TAPPING EXCAVATION PIT.
5.0. REFERENCE DOCUMENT:
5.1. FINAL REPORT BY SOIL & FOUNDATION (PTD) LTD: SOIL INVESTIGATION WORKS
FOR BANYAN OTS AT BANYAN AVE, JURONG ISLAND, SINGAPORE FOR
POWERGAS LTD. REPORT NO. S3697/10 DATE: 16 NOV, 2010