You are on page 1of 2

LONG TERM

SOIL INVESTIGATION
ON ALL SITES PT. BERAU COAL

FACTUAL SOIL INVESTIGATION REPORT WO - 02


REV DATE CONTRACT NO. : WORK ORDER NO. : PAGE
00 27/09/2011 BCTR/PD.DI.1-006/XI-10/RPR 039/Pro-Dev/HO/IV/2011 12 of 27

Figure 2-5 Position of the Deep Boring on the Weighing Bridge Suaran

Location DepthofBoring
No BoreHole
(KM) (m)
1 BES14 KM26+00 30
2 BES15 KM26+01 30
3 BES16 KM26+02 30
4 BES17 KM26+03 30
5 BES18 KM26+04 30
6 BES19 KM26+05 30
7 BES20 KM26+06 30

2.4 Soil Investigation on The Tank BBC and WMP

New WMP and Tank BBC

SEE FIGURE 2-6


FOR THE DETAIL LOCATION
LONG TERM
SOIL INVESTIGATION
ON ALL SITES PT. BERAU COAL

FACTUAL SOIL INVESTIGATION REPORT WO - 02


REV DATE CONTRACT NO. : WORK ORDER NO. : PAGE
00 27/09/2011 BCTR/PD.DI.1-006/XI-10/RPR 039/Pro-Dev/HO/IV/2011 13 of 27

Figure 2-6 Location of the soil investigation on the Tank BBC and WMP

Table 2-5 Coordinate of the Deep Boring and CPT on the New Tank BBC and WMP

Coordinate DepthofBoring
No BoreHole
X Y (m)
1 BWS1 597017.89 209439.22 25
CPT X Y
1 CWS1 597067.18 209339.68
2 CWS2 596992.80 209352.92
3 CWS3 597008.28 209483.96
4 CWS4 596980.78 209504.31
5 CWS5 597034.18 209525.36
6 CWS6 596970.17 209599.65

You might also like