Installation of HVAC lines and Fan Coil Units

MIH New Warehouse


Work Detail:
1. Installation of 310 running feet MS Pipe
2. Installation of 4 Fan coil units
3. Connecting Units with main lines,
4. Power connections

Comments:
According to initial design 350 feet of MS pipe was purchased to complete the
lines but during the progress of the work, 40 feet of pipe was saved by the
service provider, but they refused to less the labor cost came as a result of
reducing the length. After negotiation they agreed to share the 50% of the loss.
Rs. 2000/- shall be deducted from the agreed labor cost from the service
provider.

Work Completion Verification:


Mr. Kabeer (HVAC Supervisor)

Mr. Nadir (Manager Support Services)

Danyal Ahmed (Project Coordinator)