PART 1 : CALCULATIONS OF LOADINGS AND DETERMINATION OF


ALLOWABLE IMPOSED LOADINGS

Taking Critical Case of Main Building

(1) Second Storey Slab Checking (** Worst Case)

ly/lx = 2.2, One way slab (With Imposed loads of 4 KN/m2 )

Slab thickness = 150mm


d = 150-2(20)-2(10) = 90mm

Self Weight = 24 x 0.15 x 1m strip width = 3.6 kN/m

Service Dead Load = 0.75 kPa (assumed) x 1m strip width = 0.75 kN/m

Live Load = 4 KN/m2 (assumed) x 1m strip width = 4 kN/m

Wult = SW + SDL + LL = 8.35 kN/m

Mmax = WultL2/8 = 8.3 x 22 / 8 = 4.15 kNm

Assumed fcu = 20 N/mm2 (Concrete Characteristic Strength) Mild Steel of 250N/mm2

k = Mmax / fcubd2 = 4.15 x 106 / 20 x 1000 x 902 = 0.0256 < 0.156

Z = 90 { 0.5 + [0.25 (0.0256/0.9)]1/2 } = 87.4mm > 0.95d = 85.5mm

As(required) = 4.15 x 106 / 0.87 x 250 x 85.5 = 223 mm2

As(provided) = R12-225mm as scanned at the site


= 5R12 = 565 mm2 > As(required) = 223 mm2 Ok, assumption correct
Harvest

PART 2 : Checking of Main Building Foundation Loads


(All dimensions & structures are to be assumed
conservatively)

Elevation view

1st storey plan


Harvest

2nd storey plan

3rd storey plan


Harvest

(2a) First Storey:

(i) Dead Load:

Assume slab to be non-suspended slab


Floor finishes = 0.75 kPa (assumed) x (6/2 + 4/2) x (5.6/2 + 4.4/2) = 18.75 kN
Column = 0.45 x 0.4 x 4.75 x 24 = 20.52 kN
Brickwall = 20 x 0.175 x (6/2 + 4/2) x 4.75 = 83.13 kN
Total = 122.4 kN

(2b) Second Storey:

(i) Dead Load:

Slab = 0.15m (assumed) x 24 x (6/2 + 4/2) x (5.6/2 + 4.4/2) = 90 kN


Floor finishes = 0.75 kPa (assumed) x (6/2 + 4/2) x (5.6/2 + 4.4/2) = 18.75 kN
Column = 0.45 x 0.4 x 3.46 x 24 = 15 kN
Brickwall = 20 x 0.175 x (6/2 + 4/2) x (5.6/2 + 4.4/2) = 60.55 kN
Main Beam = 24 x 0.6m x 0.8m x (6/2 + 4/2) = 57.6 kN
Secondary Beam = 24 x 0.25 x 0.45 x (6/2 + 4/2) = 13.5 kN
Total = 255.4 kN

(ii) Live Load:

LL = 4 KN//m2 (assumed) x (6/2 + 4/2) x (5.6/2 + 4.4/2) = 100 kN

(2c) Third Storey or 2nd Upper Storey:

(i) Dead Load:

Slab = 0.15mm (assumed) x 24 x (6/2 + 4/2) x (5.6/2) = 50.4 kN


Beam = 24 x 0.6m x 0.8m x 6 = 69.1 KN
Floor finishes = 0.75 kPa (assumed) x (6/2 + 4/2) x (5.6/2) = 10.5 kN
Column = 0.45 x 0.4 x 3.06 x 24 = 13.22 kN
Brickwall = 20 x 0.175 x (6/2 + 4/2) x 3.06 = 53.55 kN
Total = 196.77 kN
nd
(ii) Live Load: (2 Upper Storey Rooms)

LL = 4 KN/m2 (assumed) x (6/2 + 4/2) x (5.6/2) = 50 kN


Harvest

(2d) Roof Level:

Brickwall = 20 x 0.175 x 1.81 x (6/2 + 4/2) = 32 kN


Service Dead Load
= 0.75 kPa (assumed) x (5.6/2 + 4.4/2) x (6/2 + 4/2) = 18.75 kN
Total = 50.75 kN

Roof Live Loads = 0.75KN/m2 x 5 x 5 = 14.07 KN

ROOF Materials = 1.5KN//m2 x 5 x 5 = 56.25 KN

Total Dead Load = 122.4 + 255.4 + 196.77 + 50.75 + 56.25 = 681.57 kN

Total Live Load = 100 + 50 + 14.07 = 164.07 kN


Total DL + LL = 776.54 kN

Strip Footing Size of 2m width (instead of 4m) x 4m (Span Length) x .75 Thk

Ground Footing Foundation Weight = 24.0 x 2 x 4 x .75 = 144.0 KN

Acting Soil Pressure = 989.64 / (2.0 x 4.0) = 123.71 KN//m2

Refer to Section 5.6 of the report, the tested foundation allowable bearing soil
pressure is 140.00 KN//m2 > 123.71 KN//m2 which is O.K.!