M/T SAMAL

MARCH 9, 2017

DAILY MONITORING

1. Cleaning and overhaul generator cooler.

2. Installation of (2) propellers.

3. Cutting of pod eye for old tire fender and replace chains.
4. Pull-out of cabin locker for installation of double deck @ accommodation room.

5. Check deteriorated/damage plates @ forward fender plates.

6. Checking and re-aline the hand railings and engine room blower @ second deck, port side.
7. ENGINE ROOM WORKS:
a. Cleaning of cylinder head and overhauling 1st main engine stbd side (continue).

b. Conduct bilge cleaning.

c. Overhaul auxiliary engine/generator (2) (continue).

d. Pull-out of main engine lub-oil cooler.


8. Lifting of (2) lub-oil cooler for main engine from the vessel for reconditioning.

9. Cutting and repair deteriorated parts of pipes @ fabrication area (continue).

10. Installation of scaffold @ aft portion for fender works (continue).