Professional Documents
Culture Documents
M/T Samal: MARCH 9, 2017 Daily Monitoring
M/T Samal: MARCH 9, 2017 Daily Monitoring
MARCH 9, 2017
DAILY MONITORING
3. Cutting of pod eye for old tire fender and replace chains.
4. Pull-out of cabin locker for installation of double deck @ accommodation room.
6. Checking and re-aline the hand railings and engine room blower @ second deck, port side.
7. ENGINE ROOM WORKS:
a. Cleaning of cylinder head and overhauling 1st main engine stbd side (continue).