SLUDGE THICKENER PUMP HEAD CALCULATION

Total Number of Pumps= 4 (11SP01 TO 11SP04)


Total Running Pumps= 2
Total Standby Pumps= 2
LWL= N/A
Suction Pipe Center Level= +4.350
Highest Discharge Level= +7.700
Pump TDH= 10.000 m
Pump Discharge Flow Rate= 1.600 m3/min = 0.02667 m3/sec
Longest Path: From Pump no. 11SP04 to Sludge Dry Bed no.01
Pumps Running Considered: 11SP03 & 11SP04
Pipe Materials: Ductile Iron

SUCTION LINE
Pipe Loss:
Items DN Qty C Q hf
Pipe 200 16.000 LM 120 0.027 0.075 m
Pipe (Suction Header) 250 2.100 LM 120 0.053 0.012 m
Pipe 125 1.800 LM 120 0.027 0.084 m
Total Pipe Friction Loss 0.171 m

Fitting Loss:
Items DN Qty K V hv
22.50 Bend 200 1 Nos 0.045 0.849 0.002 m
Butterfly Valve 200 3 Nos 0.16 0.849 0.018 m
Line Flow Tee (200x80) 200 1 Nos 0.30 0.849 0.011 m
Branch Flow Tee (Equal) 200 1 Nos 0.75 1.698 0.110 m
Conc Taper (200x250) 200 1 Nos 0.25 1.698 0.037 m
Butterfly Valve 250 2 Nos 0.16 1.086 0.019 m
Branch Flow Tee (250x125) 250 1 Nos 0.75 1.086 0.045 m
Butterfly Valve 125 1 Nos 0.75 2.173 0.181 m
Total Fittings Friction Loss 0.422 m

DISCHARGE LINE
Pipe Head Loss:
Items DN Qty C Q hf
Pipe 100 2.5 LM 120 0.027 0.345 m
Pipe (Header) 200 0.68 LM 120 0.027 0.003 m
Pipe (Header) 200 3.1 LM 120 0.053 0.053 m
Total Pipe Friction Loss 0.401 m

Fittings Head Loss:


Items DN Qty K V hv
900 Bend 100 1 Nos 0.18 3.395 0.106 m
Check Valve 100 1 Nos 2.2 3.395 1.293 m
Butterfly Valve 100 1 Nos 0.16 3.395 0.094 m
Branch Flow Tee (200x100) 100 1 Nos 0.75 3.395 0.441 m
Branch Flow Tee (200x100) 200 1 Nos 0.75 1.698 0.110 m
Line Flow Tee (200x100) 200 2 Nos 0.3 1.698 0.088 m
900 Bend 200 2 Nos 0.18 1.698 0.053 m
Total Fittings Friction Loss 2.184 m

YARD PIPE: THICKENER TO SDB NO.01


Pipe Head Loss:
Items DN Qty C Q hf
Pipe 200 250 LM 120 0.053 4.250 m
Total Pipe Friction Loss 4.250 m

Fittings Head Loss:


Items DN Qty K V hv
22.50 Bend 200 4 Nos 0.045 1.698 0.026 m
450 Bend 200 6 Nos 0.09 1.698 0.079 m
900 Bend 200 1 Nos 0.18 1.698 0.026 m
Branch Flow Tee (Equal) 200 3 Nos 0.75 1.698 0.331 m
Line Flow Tee (Equal) 200 12 Nos 0.3 1.698 0.529 m
Total Fittings Friction Loss 0.992 m

Result:
H= 3.350 m
h f= 4.822 m
h V = 3.598 m
TDH= 11.770 m
Design TDH= 10.000 m
Net Available Head= -1.770 DESIGNED HEAD NOT OK
ER PUMP HEAD CALCULATION

UCTION LINE

Remarks
Q for 1 pump
Q for 2 pumps
Q for 1 pump

Remarks
v for 1 pump
v for 1 pump
v for 1 pump
v for 2 pumps
v for 2 pumps
v for 2 pumps
v for 2 pumps
v for 1 pump

SCHARGE LINE

Remarks
Q for 1 pump
Q for 1 pump
Q for 2 pumps

Remarks
v for 1 pump
v for 1 pump
v for 1 pump
v for 1 pump
v for 2 pumps
v for 2 pumps
v for 2 pumps

HICKENER TO SDB NO.01

Remarks
Q for 2 pumps

Remarks
v for 2 pumps
v for 2 pumps
v for 2 pumps
v for 2 pumps
v for 2 pumps