Mauritus Multi Sports Complex

Information Required Register


Discipline: Structures Legend - Item Status
Rev 1 Item Remains Open
Date 14/11/2017 Item Closed

Information Required Response

ITEM REF QUERY Area/Room COMPANY DISCIPLINE DATE RAISED RESPONSE Current Working Assumption ACTION BY (Name RESPONSE RESPONSE
REQUIRED BY Stakeholder) RECEIVED DATE

1. Energy Centre building: There is a 1 story building on the northern side of the Grand Stand
(Refer below snap), please let us know if this is the Energy Centre Building.

STRUC 01 Energy Centre MM-GDC STRUC 14/11/17 15/11/17 Carl Wright / Gonzalo
Prieto

STRUC 02 Refuse Store Building: Not identified in the Revit models. Please provide the details Refuse Store MM-GDC STRUC 14/11/17 15/11/17 Gonzalo Prieto
STRUC 03 Ancillary Buildings: Please provide the details of other ancillary buildings. Ancillary Buildings MM-GDC STRUC 14/11/17 15/11/17 Gonzalo Prieto
Mauritus Multi Sports Complex
Information Required Register
Discipline: Structures Legend - Item Status
Rev 1 Item Remains Open
Date 14/11/2017 Item Closed

Information Required Response

ITEM REF QUERY Area/Room COMPANY DISCIPLINE DATE RAISED RESPONSE Current Working Assumption ACTION BY (Name RESPONSE RESPONSE
REQUIRED BY Stakeholder) RECEIVED DATE

STRUC 04 External Retaining Wall: Please provide the details of retaining walls required External MM-GDC STRUC 14/11/17 15/11/17 Gonzalo Prieto
Aquatic Centre: Wall seems to block the window(Refer attached snaps), please confirm

STRUC 05 Aquatic Centre MM-GDC STRUC 21/11/17 22/11/17 Barbara Murru 12/20/2017 The wall has been updated to a perforated aluminium screen, please refer
to architectural Tender Package

Aquatic Centre: Wall seems to to have no connection with the building(Refer attached snaps),
please confirm

STRUC 06 Aquatic Centre MM-GDC STRUC 21/11/17 22/11/17 Barbara Murru 12/20/2017 The wall has been updated to a perforated aluminium screen, please refer
to architectural Tender Package

At the red clouded locations In the fig above is it possible to avoid the double wall and provide
only concrete wall at the present location of the block wall?

At green clouded location we propose to provide RC wall as block wall will not be sufficient to
take the accidental load due to public movement.
Please confirm.

STRUC 07 Aquatic Centre MM-GDC STRUC 22/11/17 23/11/17 Barbara Murru 12/20/2017 Structural co- ordination is on going- please see our draft proposed
delivery schedule

Highlighted walls in Fig 2 and Fig 3 seems to be double height block walls.The slab edge should
be extended to support the wall at storey level.
Please confirm

STRUC 08 Aquatic Centre MM-GDC STRUC 22/11/17 23/11/17 Barbara Murru 12/20/2017 Resolved - Refer to architectural Tender Package
Mauritus Multi Sports Complex
Information Required Register
Discipline: Structures Legend - Item Status
Rev 1 Item Remains Open
Date 14/11/2017 Item Closed

Information Required Response

ITEM REF QUERY Area/Room COMPANY DISCIPLINE DATE RAISED RESPONSE Current Working Assumption ACTION BY (Name RESPONSE RESPONSE
REQUIRED BY Stakeholder) RECEIVED DATE

The Below location at concourse level shows the block wall stopping at 3m height and there is a
void space of 2m above that. As per our understanding the block wall should be continued till
the top to enclose the rooms from the open space outside. Please confirm.

STRUC 09 Aquatic Centre MM-GDC STRUC 22/11/17 23/11/17 Barbara Murru 12/20/2017 There is a seperate roof provided for VIP lounge at this level- please refer
to architectural Tender Package

The highlighted inclined wall in the fig above is assigned as 200thk block wall.
The inclined part is difficult to be constructed in block. We propose to provide non-structural RC
wall at this location.

STRUC 10 Aquatic Centre MM-GDC STRUC 22/11/17 23/11/17 Barbara Murru 12/20/2017 Structural co- ordination is on going- please see our draft proposed
delivery schedule

STRUC 11 Requirement of secondary structural arrangement for supporting false ceiling and services Aquatic Centre MM-GDC STRUC 22/11/17 23/11/17 Wojteiech

STRUC 12 Structure DBR is required Project wide MM-GDC STRUC 22/11/17 12/6/2017 Wojteiech

STRUC 13 Details of floodlights mast Football and Athlectics MM-GDC STRUC 06/12/17 12/7/2017 Carl Wright / Michael
Bond
In the above picture the suspended portion of the block work shall be replaced with non-
structural RC component suspended from slab.

STRUC 14 Multi Puspose Hall MM-GDC STRUC 18/12/17 12/19/2017 Antonio Blanco

The wall on the grid line ‘Ir’ is upto a height of 2.65m and above it there is an opening till Roof
tile sheeting. Please confirm whether this is correct or any glass façade will be coming at the
opening location.

STRUC 15 Multi Puspose Hall MM-GDC STRUC 18/12/17 12/19/2017 Antonio Blanco
Mauritus Multi Sports Complex
Information Required Register
Discipline: Structures Legend - Item Status
Rev 1 Item Remains Open
Date 14/11/2017 Item Closed

Information Required Response

ITEM REF QUERY Area/Room COMPANY DISCIPLINE DATE RAISED RESPONSE Current Working Assumption ACTION BY (Name RESPONSE RESPONSE
REQUIRED BY Stakeholder) RECEIVED DATE

The outer periphery has a 550mm thick earthy brick wall as highlighted in the above picture.
Please confirm the thickness and type of the wall.

STRUC 16 Multi Puspose Hall MM-GDC STRUC 18/12/17 12/19/2017 Antonio Blanco

The 250mm concrete wall coming in the outer periphery is overlapping with the brick masonry
wall in some places. Please confirm whether this is correct or not?

STRUC 17 Multi Puspose Hall MM-GDC STRUC 18/12/17 12/19/2017 Antonio Blanco
Mauritus Multi Sports Complex
Information Required Register
Discipline: Structures Legend - Item Status
Rev 1 Item Remains Open
Date 14/11/2017 Item Closed

Information Required Response

ITEM REF QUERY Area/Room COMPANY DISCIPLINE DATE RAISED RESPONSE Current Working Assumption ACTION BY (Name RESPONSE RESPONSE
REQUIRED BY Stakeholder) RECEIVED DATE

The Glass panels on the grid lines ‘1c’ and ‘11c’ are covered by an external Roof cladding as
shown in the above picture. Please confirm whether this is correct or not?

STRUC 18 Multi Puspose Hall MM-GDC STRUC 18/12/17 12/19/2017 Antonio Blanco
Mauritus Multi Sports Complex
Information Required Register
Discipline: Structures Legend - Item Status
Rev 1 Item Remains Open
Date 14/11/2017 Item Closed

Information Required Response

ITEM REF QUERY Area/Room COMPANY DISCIPLINE DATE RAISED RESPONSE Current Working Assumption ACTION BY (Name RESPONSE RESPONSE
REQUIRED BY Stakeholder) RECEIVED DATE
Mauritus Multi Sports Complex
Information Required Register
Discipline: MEP Legend - Item Status
Rev 1 Item Remains Open
Date 13/11/2017 Item Closed

Information Required Response

ITEM REF QUERY Area/Room COMPANY DISCIPLINE DATE RAISED RESPONSE Current Working Assumption ACTION BY (Name RESPONSE RESPONSE
REQUIRED BY Stakeholder) RECEIVED DATE
Mauritus Multi Sports Complex
Information Required Register
Discipline: MEP Legend - Item Status
Rev 1 Item Remains Open
Date 13/11/2017 Item Closed

Information Required Response

ITEM REF QUERY Area/Room COMPANY DISCIPLINE DATE RAISED RESPONSE Current Working Assumption ACTION BY (Name RESPONSE RESPONSE
REQUIRED BY Stakeholder) RECEIVED DATE
As per the markup received from SA team ,the FOP area has to be cooled by purging air below the seats
,refer image below.

But in the working model received on 08-12-2017, this area is open to ground floor which will cause leakage Antonio Blanco/ Robert
MEP 54 of air into Ground Floor, refer snapshot below. Multipurpose MM-GDC HVAC 12/12/17 12/12/17 Johnson

The architect will have to provide an air tight partition along the length of seating area to prevent these
leakages. Further the ducts and the indoor units of the area below seating here at ground floor will require
a ceiling to be suspended from.
A confimation from Architect is required.

SA Team confirmed that they have prepared some UPS and Server room mark-ups which can be adapted for Matthew Starr/Abdul
MEP 36 the Aquatic centre. GDC requested to share the same in notes shared vide email dated Fri 17/11/2017. Aquatic centre MM-GDC ELE 21/11/17 11/22/2017
Please share the required. Chand//Andrew woodhouse
Mauritus Multi Sports Complex
Information Required Register
Discipline: BIM
Rev
Date

ITEM REF

BIM 01

BIM 02

BIM 03

BIM 04
ulti Sports Complex
quired Register

1
11/20/2017

QUERY

Please confirm from the Architect about Project Base Points in 3D Revit Model of
Aquatic Building and which one are we supposed to incorporate in our model.
Please find the below snaps for your easy reference.
1) Project base point (model received on 17/11/2017)

2) Project base point (model received on


10/11/2017)

The grids in the 3D Revit Model of Aquatic Building received on 17/11/2017 and
10/11/2017 also mis match please confirm from the Architects which one to follow.

Please comment on the naming convention of files as mention in the BIM execution
plan.
Please finalise and send a title block
Information Required
Area/Room COMPANY

Aquatic building MM-GDC

Aquatic building MM-GDC

Site Wide MM-GDC

Site Wide MM-GDC


DISCIPLINE DATE RAISED RESPONSE REQUIRED BY

BIM 11/20/2017

BIM 11/20/2017

BIM 11/20/2017

BIM 11/20/2017
Legend - Item Status
Item Remains Open
Item Closed

Response
Current Working Assumption ACTION BY (Name Stakeholder)
Response
RESPONSE RECEIVED DATE RESPONSE

You might also like