1
Spin Plan of 60S count cotton Yarn 2
Ring frame:
TPI = 27
Efficiency = 90%
Waste = 2.5%
Average stoppage = 5%
25000
Required ring frame = = 52.08 ≈ 52 for 24960 spindles.
480
100−5 95
No. of running spindles = 24960 × = 24960 × = 23712
100 100
18000 ×60 90
= × × 23712 = 470.48𝑙𝑏𝑠
27 ×36 ×840 ×60 100
2
Spin Plan of 60S count cotton Yarn 3
Simplex section:
TPI = 1.87
Efficiency = 85%
Waste = 0.5%
Average stoppage = 7%
100+𝑅𝑖𝑛𝑔 𝑤𝑎𝑠𝑡𝑒
Production of simplex = Production of ring frame ×
100
100+2.5
= 470.48 ×
100
= 482.24 lbs
𝑠𝑝𝑖𝑛𝑑𝑙𝑒 𝑠𝑝𝑒𝑒𝑑 ×60
Production / hour/ spindle = × 𝐸𝑓𝑓𝑖𝑐𝑖𝑒𝑛𝑐𝑦
𝑇𝑃𝐼 ×36 ×840 ×𝑅𝑜𝑣𝑖𝑛𝑔 ℎ𝑎𝑛𝑘
1500×60 85
= ×
1.87 ×36 ×840 ×3.5 100
= 0.39 lbs
482.24
No. of running spindles = = 1247.65 ≈ 1248
0.39
100+𝑠𝑡𝑜𝑝𝑝𝑎𝑔𝑒 𝑡𝑖𝑚𝑒
No. of established spindles = 1248×
100
100+7
= 1248 ×
100
= 1335.36 ≈ 1335
3
Spin Plan of 60S count cotton Yarn 4
1335
No. of simplex machines = = 11.13 ≈ 11
120
Combing
Feed/Nip = 7 mm
Nips/ min= 250
No. of head/frame = 7
Efficiency = 90%.
Average stoppage time= 7%
100+𝑠𝑖𝑚𝑝𝑙𝑒𝑥 𝑤𝑎𝑠𝑡𝑒
Production of combing = Production of simplex ×
100
100+0.5%
= 482.24×
100
= 484.65 lbs.
Production/hour =
7×250×1.09×60 850 90
= × ×7×
1000 7000 100
=87.55 lbs
484.65
Number of comber = = 5.53
87.55
4
Spin Plan of 60S count cotton Yarn 5
100+𝑤𝑎𝑠𝑡𝑒
Production of lap former = production of comber ×
100
100+18
= 484.65 × = 571.89 lbs
100
𝑔𝑟𝑎𝑖𝑛
𝐷𝑒𝑙𝑖𝑣𝑒𝑟𝑦 𝑠𝑝𝑒𝑒𝑑 ×𝑙𝑎𝑝 ℎ𝑎𝑛𝑘 𝑖𝑛 ×60
𝑦𝑑𝑠
Production per hour = × 𝑒𝑓𝑓𝑖𝑐𝑖𝑒𝑛𝑐𝑦
7000
90 ×1.09×60×850 90
= × = 643.26 lbs
7000 100
571.89
Number of super Lap former = = 0.89
643.26
100+𝑠𝑡𝑜𝑝𝑝𝑎𝑔𝑒 𝑡𝑖𝑚𝑒
Number of Installed super lap former = 0.89 ×
100
100+7
= 0.89× = 0.95 ≈ 1
100
5
Spin Plan of 60S count cotton Yarn 6
Draw frame:
100+𝑆.𝐿.𝐹 𝑤𝑎𝑠𝑡𝑒
Production of draw frame = Super lap former production ×
100
100+2.5
= 571.89 ×
100
= 586.19 lbs
Delivery roller speed × 60
Production /hour/frame = ×𝐸𝑓𝑓𝑖𝑐𝑖𝑒𝑛𝑐𝑦 × 𝑑𝑒𝑙𝑖𝑣𝑒𝑟𝑦 ℎ𝑒𝑎𝑑/𝑓𝑟𝑎𝑚𝑒
840 ×𝑆𝑙𝑖𝑣𝑒𝑟 ℎ𝑎𝑛𝑘
400 × 60 85
= × ×2
840 ×0.16 100
= 303.57
586.19
Running Draw frame = = 1.93
303.57
100+𝑠𝑡𝑜𝑝𝑝𝑎𝑔𝑒 𝑡𝑖𝑚𝑒
Install draw frame = 1.93 ×
100
100+10
= 1.93 ×
100
= 2.12 ≈ 2
6
Spin Plan of 60S count cotton Yarn 7
Carding section:
100+0.75
= 586.19 ×
100
= 590.59 lbs
𝜋 × 𝐷𝑜𝑓𝑓𝑒𝑟 𝑑𝑖𝑎 ×𝐷𝑜𝑓𝑓𝑒𝑟 𝑠𝑝𝑒𝑒𝑑 ×60
Production/hour/machine = × Efficiency
36 ×840 ×𝑠𝑙𝑖𝑣𝑒𝑟 ℎ𝑎𝑛𝑘
= 42.58 lbs
𝑇𝑜𝑡𝑎𝑙 Carding production
Running Carding machines =
Production/hour/machine
590.59
= = 13.87
42.58
100+10
= 11.04 ×
100
= 15.26 ≈ 15
7
Spin Plan of 60S count cotton Yarn 8
100+𝐶𝑎𝑟𝑑𝑖𝑛𝑔 𝑤𝑎𝑠𝑡𝑎𝑔𝑒
Blow Room production = Carding production×
100
100+5
= 590.59 ×
100
= 620.12 lbs
𝜋×𝐶.𝑅.𝐷 ×𝐶.𝑅.𝑆 ×60
Pro./hr./Scutcher of Blow room = × 𝐸𝑓𝑓𝑖𝑐𝑖𝑒𝑛𝑐𝑦
36×840×𝐿𝑎𝑝 ℎ𝑎𝑛𝑘
3.14×9.5×12×60 85
= × 𝑙𝑏𝑠
36×840×0.0016 100
= 377.31 lbs
Blow Room production
Running Scutcher =
Pro./hr./Scutcher of Blow room
620.12
=
377.31
= 1.64
100+𝐴𝑣𝑒𝑟𝑎𝑔𝑒 𝑖𝑑𝑒𝑎𝑙 𝑡𝑖𝑚𝑒
Installed Scutcher = 1.64 ×
100
100+12
= 1.64×
100
= 1.84 ≈ 2
No. of Blow room line = 2/2 = 1
8
Spin Plan of 60S count cotton Yarn 9
Summary:
Number of required machines for 25000 spindles & 60S Count Cotton yarn:
Carding machines = 15
Draw frame = 02
Comber = 06
Simplex = 11
Ring frame = 52