The document provides a safety report from an offshore rig operated by GPC and contractor ADES. It summarizes that there were 1 drill/safety meeting and 4 pre-tour/tool box meetings in the reporting period. No lost-time injuries have occurred since the rig started operating, with 1966 LTI-free days recorded. A total of 105 safety stop cards were issued, with 50 for safe stops and 55 for unsafe stops. A breakdown of participants in risk assessments is provided, with 6 total risk assessments performed where some jobs required assessments and others did not.
The document provides a safety report from an offshore rig operated by GPC and contractor ADES. It summarizes that there were 1 drill/safety meeting and 4 pre-tour/tool box meetings in the reporting period. No lost-time injuries have occurred since the rig started operating, with 1966 LTI-free days recorded. A total of 105 safety stop cards were issued, with 50 for safe stops and 55 for unsafe stops. A breakdown of participants in risk assessments is provided, with 6 total risk assessments performed where some jobs required assessments and others did not.
The document provides a safety report from an offshore rig operated by GPC and contractor ADES. It summarizes that there were 1 drill/safety meeting and 4 pre-tour/tool box meetings in the reporting period. No lost-time injuries have occurred since the rig started operating, with 1966 LTI-free days recorded. A total of 105 safety stop cards were issued, with 50 for safe stops and 55 for unsafe stops. A breakdown of participants in risk assessments is provided, with 6 total risk assessments performed where some jobs required assessments and others did not.