Daily Work Report

Sheet No. Date Ref No. Job Ref


DWR
Project:
Report No:
Detailed Discription

T&C CES Contractor MADA International


Name Name
Signature Signature
Quality Control Check Sheet 2- Cleaning
Chemical Flushing

Project: First Gulf Bank Business Park


Report No:
Location:
No Check That Status Remarks

Quality control check sheet signed & approved by the


1
consultant & ICA

2 Clean water is avalaiable


3 Power and other required utility are avaialable

Identify the Drain points and visually indicates to avoid


4
accidental operation by other workers

5 Make sure all the cooling coils are bypassed


6 All drains are closed
7 Apply the chemical as per manufactures instruction
Circulate the chemical minimum of 4 hrs, max of 6 hrs
8
as per the system requirement

9 Drain Cleaning chemical from the specified drain points

Carry out the balanced flush untill the system has been
10
cleared from chemical

11 Clean strainers
12 Take water sample and inspect and record the result
13 If within acceptable tolerance proceed to next stage
14 Ensure the system is filled with clean water
Comments:-

T&C CES ICA Consultant


Name Name Name
Signature Signature Signature
Quality Control Check Sheet 3 - Final
Chemical Treatment

Project: First Gulf Bank Business Park


Report No:
Location:
No Check That Status Remarks

Quality control check sheet 2 chemical flushing signed


1
& approved by the consultant & ICA

2 Clean water is avalaiable


3 Power and other required utilities are avaialable

Identify the Drain points and visually indicates to avoid


4
accidental operation by other workers

5 Make sure all the cooling coils are connected


6 All drains are closed
7 Fill the system with clean water
Back flush the terminal devices and remove the dirt
8
from the cooling coils

Carry out the balanced flush untill the system has been
9
cleared

10 Take water sample and inspect visually


If the system quality is within the specified range add
11 the final chemical and make sure the quantity by
inspecting the sample
Take water sample and inspect and record the quality
12 control paramters

Comments:-

T&C CES ICA Consultant


Name Name Name
Signature Signature Signature