Professional Documents
Culture Documents
Mata Acara 3
Mata Acara 3
SUMBER MINERAL
2) 300 hari
3) 2 kali peledakan 1 hari
4) Produksi sehari
1 tahun = 300 hari
10.500.000 ton/tahun
= 35000 ton/hari
300 hari
= 3500 ton
𝑚 3500
𝑣= = = 12962,96 𝑚3
𝑝 2,7
5) Vertical
6) Depresiasi 90% (Penambahan 10% dari jumlah material )
12962,96 + 1296,29 = 14259,256𝑚3
7) Cerah
8) DM30(rotary) 11 seri oleh atlas copco (5m) top or DTH drilling method
9) ANFO densitas 0,8
10) 5NH4NO3 + CH2 → 4N2 + 2NO + CO2 + 7H2O
a. N = 10 x 14 = 140
H = 20 x 1 = 20
O = 15 x 16 = 240
Total AN = 400
b. C = 1 x 12 = 12
H=2x1=2
Total FO = 14
c. TOTAL AN + FO = 414
d. Presentase Bahan Peledak
%AN = (400:414) x 100% = 96,6%
%FO = (14:414) x 100% = 3,38%
11) NONEL
12) KONYA =3288,174 𝑘𝑔
Rl Ash =3939,036 𝑘𝑔
13) 3 baris
14) 60 CM
15) SG GRANITE = 2,7 𝑡𝑜𝑛/𝑚3
VOD Anfo = 11.300 𝑚/𝑠 2
16) A. Konya
0,85
B1 = 3,15 x 4 x ( 2,7 )
= 3,15 x 4 x 0,68m = 8,6 ft
0,85
B2 = [(2 + 1,5)] 4
2,7
Spasi = 1,4 𝐵
=1,4 × 2,24 = 3,14
100
Steaming 𝑇 = 0,45 × 4 × ( 2,7 ) ⁰´³³
= 5,927 𝑚
Waktu tunda
𝑡𝑟 = 𝑇𝑟 × 𝐵 = 3 × 2,24 = 6,72 𝑚𝑠
𝑡ℎ = 𝑇ℎ × 𝑆 = 1,5 × 3,14 = 4,71𝑚𝑠/𝑚
Pemakaian bahan peledak
𝑑𝑒 = 0,34 × 𝑆6𝑒 × 𝐷𝑐 2
𝑃𝑐 = (𝐿 − 𝑇) + 𝐽
= 15,373
𝐿 × 𝑃 × 𝑙𝑒𝑏𝑎𝑟 = 14259,25𝑚3
20 × 𝑃 × 6,27 = 14259,25𝑚3
𝑃 × 134,4 = 14259,25𝑚3
14259,25
𝑃= = 1,06 × 102
134,4
= 106𝑚
106 𝑚 106 𝑚
𝑃 = = 34 𝑙𝑢𝑏𝑎𝑛𝑔 𝑑𝑎𝑙𝑎𝑚 1 𝑏𝑎𝑟𝑖𝑠
𝑠𝑝𝑎𝑠𝑖 3𝑚
𝐸 = 𝑃𝑐 × 𝑑𝑒 × 𝑡𝑜𝑡𝑎𝑙 𝑙𝑢𝑏𝑎𝑛𝑔
= 3288,174 𝑘𝑔
B. Rl Ash
𝐾𝑏 × 𝐷𝑒
𝐵= =
12
𝐾𝑏 = 𝑘𝑏 𝑠 + 𝑑 × 𝐴𝑓1 × 𝐴𝑓2
3
3 160 1𝑏/𝑓𝑡
= √ 2000 1𝑏
2,7 3 3,281 𝑓𝑡
3 160 1𝑏/𝑓𝑡 3
=√
152,93 1𝑏/𝑓3
= 3√1,046 = 1,0,15
3 𝐸𝑝 𝑏𝑎ℎ𝑎𝑛 𝑝𝑒𝑙𝑒𝑑𝑎𝑘
𝐴𝑓2 = √
𝐸𝑝 𝑏𝑎ℎ𝑎𝑛 𝑠𝑡𝑎𝑢𝑡𝑎𝑟
3 0,85×(11,300 𝑚/𝑠2
= √ 1,2×(12.000 𝑚/𝑠2
3 127690000
= √0,85 × 1,2×144×106
𝐾𝑏 = 𝑘𝑠 𝑠 + 𝑑 × 1,015 × 0,856
= 30 × 1,015 × 0,856
= 26,065
26,065 × 4 104,26
𝐵= = = 8,68 𝑓𝑡 = 2,64𝑚
12 12
𝑇 = 𝐾𝑇 (0,7 − 1) (2,64) = 2,63
𝑆 = 𝐾𝑆 (1 − 2) (2,64) = 2,64
𝐽 = 𝐾𝐽 (0,2 − 0,4)(2,64) = 1,056
𝑑𝑒 = 2,097 𝑘𝑔/𝑚3
𝐿 × 𝑃 × 𝑙𝑒𝑏𝑎𝑟 = 14259,25𝑚3
20 × 𝑃 × 7,92 = 14259,25
158,4 𝑃 = 14259,25
𝑃 = 14259,25/158,4 = 90,02 𝑚
90,02
= 34 𝑙𝑢𝑏𝑎𝑛𝑔 𝑑𝑎𝑙𝑎𝑚 1 𝑏𝑎𝑟𝑖𝑠
(𝑆)2,64
E= 𝑃𝑐 × 𝑑𝑒 × 𝑁
𝑊 35000 𝑡𝑜𝑛
𝑃𝑓 = =
𝐸 3939,036 𝑘𝑔
𝑉 0,8
𝑋 = 𝐴. ( ) × 𝑄 0,17 × (𝐸/115)0,63
𝑄
RL ASH
𝐴 = 0,12 × 𝐵1
3939,036 0,8
= 4,716 ( ) × 38,6180,17 × (100/115)0,63
38,618
KONYA
= 31,480
KONYA
1 + (𝑆⁄𝐵) − 1
𝑛 = (2,2 − 14 𝐵/𝑑) (1 − 𝑊/𝐵) ( ) 𝐿/𝐻
2
2,24 1+(3,14⁄2,24)−1
= (2,2 − 14 15,7) (1 − 0⁄2,24) ( ) 15,373/20
2
𝑛 = 0,107
31,480
𝑋𝑐 =
(0,693)1/0,107
31,480
=
0,6939,345
31,480
=
0,032
= 983,75
60 0,107
𝑅 = 2,71828 − ( )
983,75
= 2,71828 − (0,0609)0,107
= 2,71828 − 0,7413
= 1,976%
RL. ASH
1 + (𝑆⁄𝐵) − 1
𝑛 = (2,2 − 14 𝐵/𝑑) (1 − 𝑊/𝐵) ( ) 𝐿/𝐻
2
2,64 1+(2,64⁄2,24)−1
= (2,2 − 14 15,1) (1 − 0⁄2,64) ( ) 18,416/20
2
𝑛 = 0,024
32,457
𝑋𝑐 =
(0,693)1/0,024
32,457
=
0,69341,6
32,457
=
0,032
= 1014,281
0,107
60
𝑅 = 2,71828 − ( )
1014,281
= 2,71828 − (0,0591)0,107
= 2,71828 − 0,7388
= 1,979%
18. POLA PELEDAKAN
19. KESIMPULAN
Pm = 214,45 𝑚3 /jam
Ph
Ks = --------
PM
12962,96 𝑚3
Ks = --------
214,45 𝑚3 /jam
Ks = 61 UNIT
21. ALAT ANGKUT
Pa = 20,501 m3/jam.
Ph
Ka = --------
Pa
12962,96 𝑚3
Ka = --------
20,501 m3/jam
Ka = 632 UNIT