You are on page 1of 9

1) PT.

SUMBER MINERAL
2) 300 hari
3) 2 kali peledakan 1 hari
4) Produksi sehari
1 tahun = 300 hari
10.500.000 ton/tahun
= 35000 ton/hari
300 hari

= 3500 ton
𝑚 3500
𝑣= = = 12962,96 𝑚3
𝑝 2,7

5) Vertical
6) Depresiasi 90% (Penambahan 10% dari jumlah material )
12962,96 + 1296,29 = 14259,256𝑚3
7) Cerah
8) DM30(rotary) 11 seri oleh atlas copco (5m) top or DTH drilling method
9) ANFO densitas 0,8
10) 5NH4NO3 + CH2 → 4N2 + 2NO + CO2 + 7H2O

a. N = 10 x 14 = 140
H = 20 x 1 = 20
O = 15 x 16 = 240
Total AN = 400
b. C = 1 x 12 = 12
H=2x1=2
Total FO = 14
c. TOTAL AN + FO = 414
d. Presentase Bahan Peledak
%AN = (400:414) x 100% = 96,6%
%FO = (14:414) x 100% = 3,38%
11) NONEL
12) KONYA =3288,174 𝑘𝑔
Rl Ash =3939,036 𝑘𝑔
13) 3 baris
14) 60 CM
15) SG GRANITE = 2,7 𝑡𝑜𝑛/𝑚3
VOD Anfo = 11.300 𝑚/𝑠 2
16) A. Konya
0,85
 B1 = 3,15 x 4 x ( 2,7 )
= 3,15 x 4 x 0,68m = 8,6 ft
0,85
B2 = [(2 + 1,5)] 4
2,7

= [(2(0,3𝑀8) + 1,5)]4 = 8,5 𝑓𝑡


100
B3 = 0,67.4 ( 2,7 )

= 0,67.4 (3,293) = 8,82


=∑ 𝐵 = 8,64 𝑓𝑡 = 2,63𝑚
Bc =𝐾𝑟 × 𝐾𝑑 × 𝐾𝑠 × 𝐵
= 0,9 × 0,95 × 2,63
= 2,24

 Spasi = 1,4 𝐵
=1,4 × 2,24 = 3,14

100
 Steaming 𝑇 = 0,45 × 4 × ( 2,7 ) ⁰´³³
= 5,927 𝑚

 J (Sub Drilling) = 0,3(𝐵) = 0,3 × 2,24 = 0,67𝑚

 Waktu tunda
𝑡𝑟 = 𝑇𝑟 × 𝐵 = 3 × 2,24 = 6,72 𝑚𝑠
𝑡ℎ = 𝑇ℎ × 𝑆 = 1,5 × 3,14 = 4,71𝑚𝑠/𝑚
 Pemakaian bahan peledak
𝑑𝑒 = 0,34 × 𝑆6𝑒 × 𝐷𝑐 2

= 0,34 × 0,85 × 42 = 4,6241𝑏/𝑓 = 2,097 𝑘𝑔/𝑚3

 Bahan peledak tiap lubang 12962.96 + 10% = 14259,25𝑚3


𝑄 = 𝑃𝑐 × 𝑑𝑒
= 15,373 × 2,097
= 32.237 𝑡𝑖𝑎𝑝 𝑙𝑢𝑏𝑎𝑛𝑔

𝑃𝑐 = (𝐿 − 𝑇) + 𝐽

= (20 − 5,927) + 0,67𝑚

= 15,373

Lebar bench = 𝐵 × 3 𝑏𝑎𝑟𝑖𝑠 = 2,24 × 3 = 6,27𝑚

𝐿 × 𝑃 × 𝑙𝑒𝑏𝑎𝑟 = 14259,25𝑚3

20 × 𝑃 × 6,27 = 14259,25𝑚3

𝑃 × 134,4 = 14259,25𝑚3
14259,25
𝑃= = 1,06 × 102
134,4

= 106𝑚

𝑃 = 106𝑚, 𝐿 = 6,72𝑚, 𝑡𝑖𝑛𝑔𝑔𝑖 = 20𝑚

106 𝑚 106 𝑚
𝑃 = = 34 𝑙𝑢𝑏𝑎𝑛𝑔 𝑑𝑎𝑙𝑎𝑚 1 𝑏𝑎𝑟𝑖𝑠
𝑠𝑝𝑎𝑠𝑖 3𝑚

= 𝑡𝑜𝑡𝑎𝑙 34 × 3 = 102 𝑙𝑢𝑏𝑎𝑛𝑔

𝐸 = 𝑃𝑐 × 𝑑𝑒 × 𝑡𝑜𝑡𝑎𝑙 𝑙𝑢𝑏𝑎𝑛𝑔

= 15,373 × 2,097 × 102 𝑙𝑢𝑏𝑎𝑛𝑔

= 3288,174 𝑘𝑔
B. Rl Ash
𝐾𝑏 × 𝐷𝑒
𝐵= =
12
𝐾𝑏 = 𝑘𝑏 𝑠 + 𝑑 × 𝐴𝑓1 × 𝐴𝑓2

3 𝐷𝑠+𝑑 3 160 1𝑏/𝑓𝑡 3


𝐴𝑓1 = √ = √
𝐷 2,27 𝑘𝑔/𝑚3

3
3 160 1𝑏/𝑓𝑡
= √ 2000 1𝑏
2,7 3 3,281 𝑓𝑡

3 160 1𝑏/𝑓𝑡 3
=√
152,93 1𝑏/𝑓3

= 3√1,046 = 1,0,15

3 𝐸𝑝 𝑏𝑎ℎ𝑎𝑛 𝑝𝑒𝑙𝑒𝑑𝑎𝑘
𝐴𝑓2 = √
𝐸𝑝 𝑏𝑎ℎ𝑎𝑛 𝑠𝑡𝑎𝑢𝑡𝑎𝑟

3 0,85×(11,300 𝑚/𝑠2
= √ 1,2×(12.000 𝑚/𝑠2

3 127690000
= √0,85 × 1,2×144×106

3 108 536 500


= √ 172 800 00 = 3√0,628 = 0,856

𝐾𝑏 = 𝑘𝑠 𝑠 + 𝑑 × 1,015 × 0,856

= 30 × 1,015 × 0,856

= 26,065

26,065 × 4 104,26
𝐵= = = 8,68 𝑓𝑡 = 2,64𝑚
12 12
𝑇 = 𝐾𝑇 (0,7 − 1) (2,64) = 2,63

𝑆 = 𝐾𝑆 (1 − 2) (2,64) = 2,64
𝐽 = 𝐾𝐽 (0,2 − 0,4)(2,64) = 1,056

𝑑𝑒 = 2,097 𝑘𝑔/𝑚3

𝑃𝑐 = (𝐿 − 𝑇) + 𝐽 = (20 − 2,64) + 1,056 = 18,416

𝑄 = 𝑃𝑐. 𝑑𝑒 = 18,416 × 2,097 = 38,618 𝑘𝑔 𝑡𝑖𝑎𝑝 𝑙𝑢𝑏𝑎𝑛𝑔

𝑙𝑒𝑏𝑎𝑟 = 𝐵 × 3 = 2,64 × 3 = 7,92𝑚

𝐿 × 𝑃 × 𝑙𝑒𝑏𝑎𝑟 = 14259,25𝑚3

20 × 𝑃 × 7,92 = 14259,25

158,4 𝑃 = 14259,25

𝑃 = 14259,25/158,4 = 90,02 𝑚

𝐿 = 7,92𝑚 𝑃 = 90,02 𝑡𝑖𝑛𝑔𝑔𝑖 = 20𝑚

90,02
= 34 𝑙𝑢𝑏𝑎𝑛𝑔 𝑑𝑎𝑙𝑎𝑚 1 𝑏𝑎𝑟𝑖𝑠
(𝑆)2,64

= 34 × 3 = 102 𝑙𝑢𝑏𝑎𝑛𝑔 𝑑𝑎𝑙𝑎𝑚 1 𝑏𝑎𝑟𝑖𝑠

E= 𝑃𝑐 × 𝑑𝑒 × 𝑁

= 18,416 × 2,097 × 102

= 3939,036 𝑘𝑔/ 𝑡𝑜𝑡𝑎𝑙 𝑙𝑢𝑏𝑎𝑛𝑔

𝑊 35000 𝑡𝑜𝑛
𝑃𝑓 = =
𝐸 3939,036 𝑘𝑔
𝑉 0,8
𝑋 = 𝐴. ( ) × 𝑄 0,17 × (𝐸/115)0,63
𝑄

RL ASH

𝐴 = 0,12 × 𝐵1

= 0,12 (0,5(𝑅𝑀𝐷 + 𝐽𝑃𝑆 + 𝐽𝐷𝑂 + 561 + 𝐻)

= 0,12 (05(50 + 10 + 0 + 17,5 + 1,1 = 4,716

3939,036 0,8
= 4,716 ( ) × 38,6180,17 × (100/115)0,63
38,618

= 4,716. (102)0,8 × 0,186 × 0,915

= 4,716 × 40,44 × 0,186 × 0,915 = 32,457

KONYA

= 4,716 × (102)0,8 × 32,2390,7 × 0,915

= 4,716 × 40,44 × 0,1804 × 0,915

= 31,480

KONYA

1 + (𝑆⁄𝐵) − 1
𝑛 = (2,2 − 14 𝐵/𝑑) (1 − 𝑊/𝐵) ( ) 𝐿/𝐻
2

2,24 1+(3,14⁄2,24)−1
= (2,2 − 14 15,7) (1 − 0⁄2,24) ( ) 15,373/20
2

= (2,2 − 1,997)(1 − 0)(0,7)(0,758)

𝑛 = 0,107

31,480
𝑋𝑐 =
(0,693)1/0,107
31,480
=
0,6939,345
31,480
=
0,032

= 983,75

60 0,107
𝑅 = 2,71828 − ( )
983,75

= 2,71828 − (0,0609)0,107

= 2,71828 − 0,7413

= 1,976%

RL. ASH

1 + (𝑆⁄𝐵) − 1
𝑛 = (2,2 − 14 𝐵/𝑑) (1 − 𝑊/𝐵) ( ) 𝐿/𝐻
2
2,64 1+(2,64⁄2,24)−1
= (2,2 − 14 15,1) (1 − 0⁄2,64) ( ) 18,416/20
2

= (2,2 − 2,147)(1 − 0)(0,5)(0,9208)

𝑛 = 0,024

32,457
𝑋𝑐 =
(0,693)1/0,024
32,457
=
0,69341,6

32,457
=
0,032

= 1014,281
0,107
60
𝑅 = 2,71828 − ( )
1014,281

= 2,71828 − (0,0591)0,107

= 2,71828 − 0,7388

= 1,979%
18. POLA PELEDAKAN

19. KESIMPULAN

a. Burden RL Ash lebih besar dari Konya


b. Pemakaian Bahan Peledak RL Ash lebih besar dari Konya
c. Jumlah total lubang Seimbang

21. ALAT MUAT

Kb x SF x FF x Eff x 60 menit / jam


Pm = ------------------------------------------
CT (menit)
2 x 0,73 x 0,90 x 0,6 x 60 menit / jam
Pm = ------------------------------------------
0,221

Pm = 214,45 𝑚3 /jam

Ph
Ks = --------
PM
12962,96 𝑚3
Ks = --------
214,45 𝑚3 /jam

Ks = 61 UNIT
21. ALAT ANGKUT

KB x Eff x 60 menit / jam


Pa = -----------------------------------
CT (menit)

12 x 0,7261 x 60 menit / jam


Pa = -----------------------------------
25,5

Pa = 20,501 m3/jam.

Ph
Ka = --------
Pa
12962,96 𝑚3
Ka = --------
20,501 m3/jam

Ka = 632 UNIT