You are on page 1of 3

*$1330PZT-9141C/I04-A*

CTCI CHIYODA SYNERLITZ MIE (CCSM)

Construction Check Sheet


INSTRUMENT INSTALLATION
Instrument I04-A
ITEM/TAG NO. 1330PZT-9141C RECORD NO. A1100534
EQUIPMENT DESCRIPTION PRESS XMTR
SUB-SYSTEM NO. 1330-P-03-01
SUB-SYSTEM
DESCRIPTION
PROPANE/PROPYLENE SPLITTER
LOCATION 1330-K-001 SYSTEM 1330-P-03
PROJECT TITLE PETRONAS RAPID PROJECT, PENGERANG PROJECT NO. 14A1758A
DRAWING REFERENCE RAPID-P0001-CCSM-PRO-PID-1330-0036 DATE PRINTED 2018-07-23
INSTRUMENT DATA
TYPE DIAPHARGM TYPE SIGNAL RANGE 4-20 MA
SERVICE STEAM TURBINE EXHAUST HEADER DIAL/CHART RANGE 0 TO 1.3 BAR
RAPID-P0001-CCSM-INC-TDS-
SERIAL NUMBER N/A DATASHEET
1330-0018
MODEL NO. YOKOGAWA MANUFACTURER EJA310E
INSTALLATION CHECK OK N/A PL NO
Verify that devices are tested/calibrated and confirm the duration of calibration
1
certificate is still valid
2 Instrument is correctly mounted, elevated and positioned as per approved drawings
Ensure that instrument manifold are correctly oriented and installed properly as per
3
vendor drawings
4 Instrument name plate /service tag are correct as per approved drawing
5 Instrument is free of vibration
6 Instrument is clear from obstructions and accessible
Tubing (impulse, signal & hydraulic lines) are installed and properly supported (every
7
1.5m)
8 Vent line to safe location
Instrument complies with hazardous specification and IP rating. To ensure the IP rating
9
and hazardous area certification are engraved at the instrument body name plate
Verify orifice plate is installed as per approved PTS standard/vendor drawings and
10 approved hook up drawings. Orientation of the “jack” nut is correctly done (for flange
fitting only).
11 Check in line instrument installation is as per the Vendor Drawings.
Check all covers are fitted, seal are in good condition and spare entries are plugged
12
with certified plug as per instrument hazardous and IP rating
13 Check that instrument back and front cover are applied with copper grease
14 Instrument body are earthed properly
15 Ensure cable glanding are done properly
Ensure the instrument cable glands (with earth lug) are earthed to the instrument
16 body/support structure.

17 Verify to ensure that all construction / installation activities have been completed
INSTALLATION CHECK OK N/A PL NO
18 Ensure wiring termination is correctly done and proper ferrules (ring type) are

Rev2 November 30, 2017 *P1/3*


*$1330PZT-9141C/I04-A*

CTCI CHIYODA SYNERLITZ MIE (CCSM)

Construction Check Sheet


INSTRUMENT INSTALLATION
Instrument I04-A
ITEM/TAG NO. 1330PZT-9141C RECORD NO. A1100534
EQUIPMENT DESCRIPTION PRESS XMTR
SUB-SYSTEM NO. 1330-P-03-01
SUB-SYSTEM
DESCRIPTION
PROPANE/PROPYLENE SPLITTER
LOCATION 1330-K-001 SYSTEM 1330-P-03
PROJECT TITLE PETRONAS RAPID PROJECT, PENGERANG PROJECT NO. 14A1758A
DRAWING REFERENCE RAPID-P0001-CCSM-PRO-PID-1330-0036 DATE PRINTED 2018-07-23
INSTRUMENT DATA
TYPE DIAPHARGM TYPE SIGNAL RANGE 4-20 MA
SERVICE STEAM TURBINE EXHAUST HEADER DIAL/CHART RANGE 0 TO 1.3 BAR
RAPID-P0001-CCSM-INC-TDS-
SERIAL NUMBER N/A DATASHEET
1330-0018
MODEL NO. YOKOGAWA MANUFACTURER EJA310E
connected, screen drain wires are properly insulated
Verify core marker and cable tag are correctly installed as per instrument loop
19
drawing
Correct size/type of cable glands fitted, cable tags attached, spare cable entries
20
plugged off.
21 Verify no dust inside Enclosure /Cabinet / Panel and insulation surfaces are clean.
22 Verify Instruments & its Accessories /Electrical equipment/Panel externally clean.
REFERENCE DRAWINGS
1 Instrument Location Plan
2 Instrument Installation Detail
3 Hook Up Drawings
4 Vendor Drawings
5 PTS Standard Drawings
6 Instrument Loop Drawings
COMMENT(S) OR ADDITIONAL INFORMATION:

Inspected By Inspected By Approved By


Designation QAQC QAQC Inspector QAQC Engineer
Company CCSM PMT PMT

Rev2 November 30, 2017 *P2/3*


*$1330PZT-9141C/I04-A*

CTCI CHIYODA SYNERLITZ MIE (CCSM)

Construction Check Sheet


INSTRUMENT INSTALLATION
Instrument I04-A
ITEM/TAG NO. 1330PZT-9141C RECORD NO. A1100534
EQUIPMENT DESCRIPTION PRESS XMTR
SUB-SYSTEM NO. 1330-P-03-01
SUB-SYSTEM
DESCRIPTION
PROPANE/PROPYLENE SPLITTER
LOCATION 1330-K-001 SYSTEM 1330-P-03
PROJECT TITLE PETRONAS RAPID PROJECT, PENGERANG PROJECT NO. 14A1758A
DRAWING REFERENCE RAPID-P0001-CCSM-PRO-PID-1330-0036 DATE PRINTED 2018-07-23
INSTRUMENT DATA
TYPE DIAPHARGM TYPE SIGNAL RANGE 4-20 MA
SERVICE STEAM TURBINE EXHAUST HEADER DIAL/CHART RANGE 0 TO 1.3 BAR
RAPID-P0001-CCSM-INC-TDS-
SERIAL NUMBER N/A DATASHEET
1330-0018
MODEL NO. YOKOGAWA MANUFACTURER EJA310E
Name

Signature

Date

Rev2 November 30, 2017 *P3/3*