42.

2
Design of Weir
Creep Length Kholsa Theory
2.8 6.2 2.6
26.1 16.1
Check against uplift and piping
Pile No 1 Pile No 2 Pile No 3
Total water pressure 8 input
D/S Pile
E C
d 2.6 m input
b 42.2 m input b d
α 16.23
λ 8.63 DD
ØE 22.11 %
ØD 15.47 %
Thickness 2.5 m input

Intermediate Pile
d 6.2 input
b1 26.1 input E C
b2 16.1 input
α1 4.21 b1 d b2
α2 2.60
λ 3.55 DD
λ1 0.77
ØE 52.04 %
Ø
ØD 43
43.03
03 %
ØC 33.39 %
Thickness 2.50 m input

U/S pile
d 2.8 input E1 C1
b 42.2 input
α 15.07 d b
λ 8.05
ØD 16.03 %
ØD1 83.97 % D1
ØE 22.93 %
ØC1 77.07 %
Thickness 2.5 m input 77.07 52.04 33.39 22.11

83.97 43.03 15.47


Thickness Correction
U/S pile
ØC 6.16 %

Intermediate
ØE - 3.63 %
ØC 3.89 %

D/S Pile
ØE - 6.38 %

Correction for mutual Interference From A R Arora Page 644

Effect of pile 2 on pile 1


d 0.3 m
D 1.1 m input
b 42.2 m
b' 26.1 m

C 0.13 %

Effect of pile 1 on pile 2


d 3.70
D 2.46 input
b 42.2
b' 26.1

C- 0 85 %
0.85

Effect of pile 2 on pile 3


d 0.10
D 5.01 input
b 42.2
b' 16.1

C- 1.28

Effect of pile 3 on pile 2


d 3.70
D 0.6 input
b 42.2
b' 16.1

C 0.37
Slope Corection

upstream of pile 2 c' 6.5 From A R Arora Page 644


bs 6 b' 26.1
Correction ØE - 1.49 %

Downstream of pile 2 c' 4.5


bs 15 b' 16.1

Correction ØE 4.19 %

Corrected pressure of Pile 1 Uplift Pressure Q R


Pile No 1 6.18 4.64 3.01 1.16
ØC 77.20 % Pc 6.18 m

Corrected pressure of Pile 2 Pile No 2

ØE 58.02 % PE 4.64 m
ØC 37.65 % PC 3.01 m

Corrected pressure of Pile 3 Pile No 3

ØE 14.45 % PE 1.16 m

Uplift pressure Q at the start of D/S floor 3.01 m

Thickness Required 2.43 m

Uplift pressure R at the End of D/S floor 1.16 m

Thickness Required 0.93 m OK

Exit Gradient
H 10.21 m input
d 2.6 m
λ 8.63

G 0.43 2.35 1 in 100 yrs flood