Following is the table which clearly shows various planning file entries against a

transaction/activity.

No
NChge Explode Plng entry
S.no Activity/Transaction NChgePHor ResetProps Remarks
plng BOM date (No

impact)

Material master created with only basic


1 X
data views

Material master extended with purchasing


2 X
view (No MRP views)

Material master extended with sales view


3 X
(No MRP views)

Material master extended with work


4 X
scheduling view (No MRP views)

Material master extended with Plant

5 storage location data 1/2 view (No MRP X


views)

6 Material master extended with MRP views X X X

7 New BOM created for material X X X X

X
(Entries
8 After MRP run
are
reset)
No

NChge Explode Plng entry


S.no Activity/Transaction NChgePHor ResetProps Remarks
plng BOM date (No
impact)

Modify BOM (Not just accessing BOM via

CS02, we need to modify some elements


of BOM).Example: If I access CS02 and

modify component usage from 1 EA to

again 1 EA,no impact on planning file


No Impact
entry. This must be changed from 1 EA to
on
2 EA or something else. This means
component
modification must be a real modification
9 X X X planning
not just accessing CS02).Modification
file which
includes following: 1. Item quantity,2.Item
is changed
change,3.BOM status,4.Fixed qty, Net
in BOM
scrap indicators, Following modifications

are not part of planning file entry: 1.Item

number (POSNR) would not have any


impact on planning file entry 2.BOM

header and Alt texts

X
Planning file entry would be reset Even if I
(Entries
10 run MD03 as BOM anyway exploded here
are
in MD03.
reset)

Now,Planned order created manually;So,


11 X X X
firm indicator set as it is created manually

(Entries
12 Run MD03
are

reset)
No
NChge Explode Plng entry
S.no Activity/Transaction NChgePHor ResetProps Remarks
plng BOM date (No

impact)

Planning file entry is updated for

component as dependent requirement


13 X X
generated from header item while running
MD03

Modify BOM, component usage quantity


14 X X X
from 1 EA to 2 EA

(Entries
15 Run MD03
are
reset)

Despite firm indicator, planned order

16 component usage changed from 1 EA


to 2 EA

(Entries
17 Run MD03 for component
are

reset)

Modify PR quantity of component from 1


18 X X
EA to 2 EA

(Entries
19 Run MD03 for component
are

reset)

Following MRP data changed at Material


20 X X X
master would have impact: 1. Lead time
No

NChge Explode Plng entry


S.no Activity/Transaction NChgePHor ResetProps Remarks
plng BOM date (No

impact)

Following MRP data changed at Material

master would have impact: 1.MRP


21 controller,2.Prod.Stor.Location,3.Strategy X X

group,4.Indiv/Coll indicator,5.Batch

management activation

Following MRP data changed at Material

master would have impact: 1.Selection


22 X X X
method in MRP4 view,2.Create/Change
of Production version in MRP4 view

Following MRP data would not have

impact: 1. Backflush indicator,2.REM

23 profile/Indicator,3.Serial number profile

addition,4.Change of Prod.Version text

alone in MRP4 view

Run MD03 for component;This would not


X
change lead time updated in PR as it is
(Entries
24 firmed.This change in lead time would not
are
even be updated while converting PR to
reset)
PO

25 Conversion from PR to PO X

26 Change of quantity in PO X X

27 Change in delivery days in PO X

28 Change in delivery date in PO X X