Field Density Testing: Valencia Hills Unit Two
Field Density Testing: Valencia Hills Unit Two
Test No. Proctor Test Location Description Percent Dry Percent Compaction
Curve Moisture Density Proctor Requirement
(pcf) Pass/Fail
Respectfully submitted,
SpeeSoil, Inc.
Test No. Proctor Test Location Description Percent Dry Percent Compaction
Curve Moisture Density Proctor Requirement
(pcf) Pass/Fail
Respectfully submitted,
SpeeSoil, Inc.
Test No. Proctor Test Location Description Percent Dry Percent Compaction
Curve Moisture Density Proctor Requirement
(pcf) Pass/Fail
Respectfully submitted,
SpeeSoil, Inc.
Test No. Proctor Test Location Description Percent Dry Percent Compaction
Curve Moisture Density Proctor Requirement
(pcf) Pass/Fail
Respectfully submitted,
SpeeSoil, Inc.
Test No. Proctor Test Location Description Percent Dry Percent Compaction
Curve Moisture Density Proctor Requirement
(pcf) Pass/Fail
Respectfully submitted,
SpeeSoil, Inc.
Test No. Proctor Test Location Description Percent Dry Percent Compaction
Curve Moisture Density Proctor Requirement
(pcf) Pass/Fail
Respectfully submitted,
SpeeSoil, Inc.
Test No. Proctor Test Location Description Percent Dry Percent Compaction
Curve Moisture Density Proctor Requirement
(pcf) Pass/Fail
8" Sanitary Sewer Line
Steel Hill
2nd Lift
Respectfully submitted,
SpeeSoil, Inc.
96.7%
SPN16043SS
Test No. Proctor Test Location Description Percent Dry Percent Compaction
Curve Moisture Density Proctor Requirement
(pcf) Pass/Fail
8" Sanitary Sewer Line
Tin Hill
2nd Lift
Respectfully submitted,
SpeeSoil, Inc.
Test No. Proctor Test Location Description Percent Dry Percent Compaction
Curve Moisture Density Proctor Requirement
(pcf) Pass/Fail
8" Sanitary Sewer Line
Blass Hill
1st Lift
Respectfully submitted,
SpeeSoil, Inc.
Test No. Proctor Test Location Description Percent Dry Percent Compaction
Curve Moisture Density Proctor Requirement
(pcf) Pass/Fail
8" Sanitary Sewer Line
Blass Hill
1st Lift
Copper Hill
1st Lift
Respectfully submitted,
SpeeSoil, Inc.
Test No. Proctor Test Location Description Percent Dry Percent Compaction
Curve Moisture Density Proctor Requirement
(pcf) Pass/Fail
8" Sanitary Sewer Line
Copper Hill
1st Lift
Respectfully submitted,
SpeeSoil, Inc.
Test No. Proctor Test Location Description Percent Dry Percent Compaction
Curve Moisture Density Proctor Requirement
(pcf) Pass/Fail
8" Sanitary Sewer Line
Copper Hill
1st Lift
Test No. Proctor Test Location Description Percent Dry Percent Compaction
Curve Moisture Density Proctor Requirement
(pcf) Pass/Fail
Test No. Proctor Test Location Description Percent Dry Percent Compaction
Curve Moisture Density Proctor Requirement
(pcf) Pass/Fail
Respectfully submitted,
SpeeSoil, Inc.
Test No. Proctor Test Location Description Percent Dry Percent Compaction
Curve Moisture Density Proctor Requirement
(pcf) Pass/Fail
Respectfully submitted,
SpeeSoil, Inc.
Test No. Proctor Test Location Description Percent Dry Percent Compaction
Curve Moisture Density Proctor Requirement
(pcf) Pass/Fail
Respectfully submitted,
SpeeSoil, Inc.
Test No. Proctor Test Location Description Percent Dry Percent Compaction
Curve Moisture Density Proctor Requirement
(pcf) Pass/Fail
Respectfully submitted,
SpeeSoil, Inc.
Test No. Proctor Test Location Description Percent Dry Percent Compaction
Curve Moisture Density Proctor Requirement
(pcf) Pass/Fail
Test No. Proctor Test Location Description Percent Dry Percent Compaction
Curve Moisture Density Proctor Requirement
(pcf) Pass/Fail
Tin Hill
Respectfully submitted,
SpeeSoil, Inc.
Test No. Proctor Test Location Description Percent Dry Percent Compaction
Curve Moisture Density Proctor Requirement
(pcf) Pass/Fail
Respectfully submitted,
SpeeSoil, Inc.
Test No. Proctor Test Location Description Percent Dry Percent Compaction
Curve Moisture Density Proctor Requirement
(pcf) Pass/Fail
Tin Hill
Respectfully submitted,
SpeeSoil, Inc.
Test No. Proctor Test Location Description Percent Dry Percent Compaction
Curve Moisture Density Proctor Requirement
(pcf) Pass/Fail
Respectfully submitted,
SpeeSoil, Inc.
Test No. Proctor Test Location Description Percent Dry Percent Compaction
Curve Moisture Density Proctor Requirement
(pcf) Pass/Fail
Fender Hill
Respectfully submitted,
SpeeSoil, Inc.
Test No. Proctor Test Location Description Percent Dry Percent Compaction
Curve Moisture Density Proctor Requirement
(pcf) Pass/Fail
Respectfully submitted,
SpeeSoil, Inc.
Test No. Proctor Test Location Description Percent Dry Percent Compaction
Curve Moisture Density Proctor Requirement
(pcf) Pass/Fail
8" Sanitary Sewer Line
Copper Hill
4th Lift
Respectfully submitted,
SpeeSoil, Inc.
Test No. Proctor Test Location Description Percent Dry Percent Compaction
Curve Moisture Density Proctor Requirement
(pcf) Pass/Fail
8" Sanitary Sewer Line
Copper Hill
Manhole
1st Lift
Brass Hill
Respectfully submitted,
SpeeSoil, Inc.
Test No. Proctor Test Location Description Percent Dry Percent Compaction
Curve Moisture Density Proctor Requirement
(pcf) Pass/Fail
8" Sanitary Sewer Line
Steel Hill
6th Lift
Tin Hill
Respectfully submitted,
SpeeSoil, Inc.
Test No. Proctor Test Location Description Percent Dry Percent Compaction
Curve Moisture Density Proctor Requirement
(pcf) Pass/Fail
8" Sanitary Sewer Line
Fender Hill
6th Lift
Respectfully submitted,
SpeeSoil, Inc.
Test No. Proctor Test Location Description Percent Dry Percent Compaction
Curve Moisture Density Proctor Requirement
(pcf) Pass/Fail
8" Sanitary Sewer Line
Steel Hill
7th Lift
Tin Hill
Respectfully submitted,
SpeeSoil, Inc.
Test No. Proctor Test Location Description Percent Dry Percent Compaction
Curve Moisture Density Proctor Requirement
(pcf) Pass/Fail
8" Sanitary Sewer Line
Fender Hill
7th Lift
Respectfully submitted,
SpeeSoil, Inc.
Test No. Proctor Test Location Description Percent Dry Percent Compaction
Curve Moisture Density Proctor Requirement
(pcf) Pass/Fail
8" Sanitary Sewer Line
Brass Hill
Copper Hill
Respectfully submitted,
SpeeSoil, Inc.
Test No. Proctor Test Location Description Percent Dry Percent Compaction
Curve Moisture Density Proctor Requirement
(pcf) Pass/Fail
8" Sanitary Sewer Line
Copper Hill
Brass Hill
Copper Hill
6th Lift
Respectfully submitted,
SpeeSoil, Inc.
Test No. Proctor Test Location Description Percent Dry Percent Compaction
Curve Moisture Density Proctor Requirement
(pcf) Pass/Fail
8" Sanitary Sewer Line
Bronze Hill
1st Lift
Respectfully submitted,
SpeeSoil, Inc.
Test No. Proctor Test Location Description Percent Dry Percent Compaction
Curve Moisture Density Proctor Requirement
(pcf) Pass/Fail
Respectfully submitted,
SpeeSoil, Inc.
Test No. Proctor Test Location Description Percent Dry Percent Compaction
Curve Moisture Density Proctor Requirement
(pcf) Pass/Fail
8" Sanitary Sewer Line
8th Lift/ Final
Steel Hill
Tin Hill
Respectfully submitted,
SpeeSoil, Inc.
Test No. Proctor Test Location Description Percent Dry Percent Compaction
Curve Moisture Density Proctor Requirement
(pcf) Pass/Fail
Maintannance Road
Subgrade
Respectfully submitted,
SpeeSoil, Inc.
Test No. Proctor Test Location Description Percent Dry Percent Compaction
Curve Moisture Density Proctor Requirement
(pcf) Pass/Fail
Gabion Baskets
south of Covert
Subgrade
Respectfully submitted,
SpeeSoil, Inc.
Test No. Proctor Test Location Description Percent Dry Percent Compaction
Curve Moisture Density Proctor Requirement
(pcf) Pass/Fail
Gabion Baskets
south of Covert
1st Lift
Respectfully submitted,
SpeeSoil, Inc.
Test No. Proctor Test Location Description Percent Dry Percent Compaction
Curve Moisture Density Proctor Requirement
(pcf) Pass/Fail
Gabion Baskets
south of Covert
2nd Lift
Respectfully submitted,
SpeeSoil, Inc.
Test No. Proctor Test Location Description Percent Dry Percent Compaction
Curve Moisture Density Proctor Requirement
(pcf) Pass/Fail
Gabion Baskets
south of Covert
2nd Lift
Respectfully submitted,
SpeeSoil, Inc.
Test No. Proctor Test Location Description Percent Dry Percent Compaction
Curve Moisture Density Proctor Requirement
(pcf) Pass/Fail
Respectfully submitted,
SpeeSoil, Inc.
Test No. Proctor Test Location Description Percent Dry Percent Compaction
Curve Moisture Density Proctor Requirement
(pcf) Pass/Fail
Gabion Baskets
3rd lift
Respectfully submitted,
SpeeSoil, Inc.
Test No. Proctor Test Location Description Percent Dry Percent Compaction
Curve Moisture Density Proctor Requirement
(pcf) Pass/Fail
Gabion Baskets
3rd lift
Respectfully submitted,
SpeeSoil, Inc.