You are on page 1of 7

Last Weeks Problem

The Problem Statement


Liner: 5.0” OD, CT: 1.5” OD, 1. Tbg. Cap & Vol?
v 4.494” ID, v 1.375” ID,
v 13.0 # v 1.840# 2. Hole Vol ?
Tbg: 3.5” OD, 3. Tbg-CT Ann Vol?
v 2.867” ID,
v 9.30# 4. HH @ ToP?
PD: 7200’
SG of 5. Height of 50 bbl treating
ToP: 7300’ Completion
Fluid is 1.02.
fluid?
BoP: 7350’ 6. CT Speed if pump rate
Pumping rate
PBD: 7400’ through CT is 0.80 bpm?
0.80 bpm.
TD: 7500’
Tubing Cap, Vol & CT Cap, Vol
• Tubing Capacity & Volume • CT Capacity & Volume

Assuming Packer Depth = Assuming CT is @ BoP i.e.


Tubing Length 7350’
Hole Volume & CT-Tbg Ann Vol
• Hole Capacity & Volume • CT-Tubing Annular Volume
Hydrostatic Head @ ToP &
Treating Fluid Height

Since Total Volume of Treating Fluid is 50 bbl and total


volume of Hole + Tbg-CT Annular is 3.92+ 41.76 = 45.68 bbl.

The treating fluid will emerge from the wellbore before the
completion of Perforation wash.
CT Speed if Q = 0.80 bpm
Since 50 bbl are to be pumped at 0.80 bpm;
It will take 50/0.80 = 62.5 min to pump the fluid.

So to perform single cycle perforation wash CT speed will need to be:


100/62.5 = 1.6 ft/min.