Daily Report Engineering Department

I. Monthly Task

No Task Progress Timeline


1 Training Pre opening On progress September 2016

2 Prepared for Grand Opening On progress September 2016

3 Cleaning Area On progress September 2016

4 Check List Room and Public Area On progress September 2016

5 Prepared grand opening tools On progress September 2016

6 Set soap liquid machine in 6nd floor On progress September 2016

II. Daily report

Date No Activities Remark


Monday 1 Logsheet and saving energy all area Done
4 September 2016
2 Continue making cabinet (requested by FO Dept) Done

3 Repair position of fallen lamp in Rustik Done

4 Repair tap of leaking washbasin in 229 Done

5 Cleaning in front of loading dock area and office Done


area

6 Continue making rack of locker Progress

7 Logsheet and saving energy all area Done

8 Repair leaking fuller of FCU in 6th floor Done

9 Monitoring repair of pillar lamp in drop off area Done

10 Logsheet and saving energy Done

11 Cleaning cooling tower I Done

12 Change compressor III to compressor II Done


13 Change fan cooling tower, pump cooling tower and Done
pump chiller

14 Saving energy Done

15 Closing PDAM and PLN Done

Prepared by Approved by

Nugraha Lestari Umar Pannao


Engineering Secretary Assist. Chief Engineer