MODERN ENGINEERING SOLUTIONS

MODERN ASSOCIATED ENGINEERING

PROJECT : NIL
VENUE: MES OFFICE
SUBJECT: WEEKLY MEETING – WEEK 35
Meeting Date and Time: 26 AUG 2019 – 0930-1100Hrs

Attendees:
Company Name Designation

Modern Engineering Solutions Bruce Lim Project Manager


Sdn. Bhd. Muhd Najibullah Project Engineer
Nur Ain Nabilah Proposal Engineer
Ahmad Bukhari Project Engineer
Fatin Nur Afini Proposal Engineer
Wan Azura Snr Project Engineer

MINUTES OF MEETING
Item
Description Status Action Target Date
No.

1.0 GENERAL

1.1 Mr. Bruce Lim, Project Manager MES highlighted purpose of this Info
meeting which are:
- To follow up pending tasks of engineers

1.2 Mr Bruce went through all the pending tasks each of engineers. Info
All engineers shall clear up all the pending task as described below:

By Najibullah: -
1.2.1
i. To re-coil power cable at Panglima Garang Open Najib & 28/08/19
Bukhari
ii. To compile the documentation for EKL 800 meter Open Najib
1) Extract of report
2) As built drawing: JB Stand, Junction Box
(Status: pending for final VDRL submission)
iii. To prepare the offshore medical Open Najib 18/09/19
(Status: pending for treatment)
iv. To investigate/ study case the termination block for JB Open Najib & 22/08/19
1) To confirm the fork lug size Bukhari

Page 1 of 3
MODERN ENGINEERING SOLUTIONS
MODERN ASSOCIATED ENGINEERING
v. To prepare final document for Tembikai Open Najib

1.2.2
By Bukhari: -
Open Bukhari
i. To follow up claim with Vestigo & EPOM regarding
Bentara Project
Open Bukhari
ii. To complete temporary design rack to be install in the
store room.
iii. To create project schedule for BPPA Project and register Open
Bukhari 06/08/19
OGSP (Status: Submitted)
Open Bukhari
iv. To lead SAFRAN Project
Open Bukhari
v. To lead KBC Jetty/ MLA
-to be confirm on 27/08/19

By Ain: -
Ain 19/08/19
Open

Ain 19/08/19
Open

2.0 SALES

2.1 Mr Bruce went through all the pending tasks each of engineers. Info
All engineers shall clear up all the pending task as described below:

2.1.1 By Azura:-
Oil India Project
i. To prepare info such as number of circuit, total load and Open Azura 19/08/19
specification for DB to get the price from supllier

By Afini:-
2.1.2 Open Afini 26/08/19
i. Incharge of sales tracking

3.0 OTHER MATTERS

No other matters

Meeting Adjourned at 1100hrs.

Prepared by: (MES) Reviewed by: (MES)

Page 2 of 3
MODERN ENGINEERING SOLUTIONS
MODERN ASSOCIATED ENGINEERING

……………………............... ……………………………….
Name: Nur Ain Nabilah Name: Bruce Lim
Position: Project Engineer Position: Project Manager