BQ KERNEL CRUSHING PLANT CAP.

200 TON KERNEL PER DAY


SCHEDULE OF CONTRACT VALUES
1 2 3 4 5
Item Description Quantity Price($) Installation Portion (Rp)
A Kernel Receiving Station 0.00 0
1 Kernel Discharge Conveyor 2 unit
2 Kernel Elevator 1 unit
3 Kernel Distributing Conveyor 1 unit
4 Kernel Bulk Silo 2 unit
5 Airlock ø 400 mm 2 unit
Sub Total III.A
B Kernel Crushing Station
1 Kernel Bottom Cross Conveyor 1 unit
2 Kernel Cross Conveyor 1 unit
3 1st Line Kernel Crushing 1 unit
3.1 Kernel Conveyor to 1st Line Crushing 1 unit
3.2 Kernel Elevator 1 unit
3.3 Kernel Distributing Conveyor above Kernel Hopper 1 unit

3.4 Kernel Hopper c/w Chute, Catwalk and Stair 11 unit


3.5 Kernel Press 11 unit
3.6 Kernel Press Tie Beam 1 set
3.7 1st Oil Conveyor 1 unit
3.8 1st Cake Conveyor c/w Discharge Cover 1 unit
5 Cake Transfer Conveyor to 2nd Line 1 unit
5 2nd Line Cake Crushing:
5.1 Cake Elevator 1 unit
5.2 Cake Distributing Conveyor above Cake Hopper 1 unit
5.3 Cake Hopper c/w Chute, Catwalk and Stair 9 unit
5.4 Cake Press 9 unit
5.5 Cake Press Tie Beam 1 set
5.6 2nd Oil Conveyor 1 unit
5.7 2nd Cake Conveyor c/w Discharge Cover 1 unit
6 Oil Collecting Conveyor (1st & 2nd Oil Conveyor) 1 unit
7 Oil Collecting Pit 1 unit
8 Crossing Catwalk from 1st Line to 2nd Line 2 unit

9 Maintenance Tools for Press Machines 1 lot

C Filtering Station
1 Oil Bucket Elevator 2 unit
2 Sludge PK Expeller Conveyor 1 unit
3 Crude Oil Pump 2 unit
4 Oil Settling Tank 1 unit
5 Oil Pump to Leaf Filter Press 2 unit
6 Leaf Filter Press 2 unit
7 Steel Structure for 2 units Filter Press 1 unit

8 Filtered Oil Tank 1 unit


9 Filtered Oil Pump 2 unit
10 Oil Daily Tank 1 unit
BQ KERNEL CRUSHING PLANT CAP.200 TON KERNEL PER DAY
SCHEDULE OF CONTRACT VALUES
1 2 3 4 5
Item Description Quantity Price($) Installation Portion (Rp)
11 Oil Transfer Pump 2 unit
12 PKO Storage Tank 1 unit
13 Oil Despatch Pump 2 unit
14 Piping Line System c/w Valves and Instrument 1 lot
15 Maintenance Tools for Leaf Filter Press 1 lot
D Storage Tank & Oil Loading Shed
1 Final Cake Elevator 1 unit
2 Cake Cross Conveyor to PKE Storage Building 1 unit
3 Cake Distribution Conveyor 2 unit
4 Cake Tank for Bagging 1 unit
E Not included
1 Unloading system 1 unit
23 Compressor 1 unit
24 Air Dryer 1 unit
25 Air Receiver Tank 1 unit
26 Residue Conveyor 1 unit
27 Residue Elevater 1 unit
E Piping Line for Pillars and Appurtenances
1 Schematic Piping for Palm Kernel Oil 1 lot
2 Schematic Piping for Palm Kernel Steam 1 lot
3 Hydrant 1 lot
4 Ring Main 1 lot

E Others
1 All of Other Platform and Support 1 lot
2 Painting works 1 lot
3 Materials for testing 1 lot
4 Insulation Works For All Tanks & Piping 1 lot
5 Transport costs 1 lot
6 Laboratory equipment for analysis 1 lot
0
F Total
6
Remarks

ø400 mm×22
Double Chain Type
ø600 mm×18
Cap. 150 ton
Under Bulk Silo

ø500 mm×10
ø400 mm×18

ø400 mm×16
Single Chain Type.
ø400 mm×34

WF 200, UNP 100 and MS Plate 6


mm
Cap. 20 ton/day.
HB 150 x 6 lines along press
foundation
ø200 mm×30
ø300 mm×30
ø300 mm×15

Single Chain Type.


ø300 mm×30
WF 200, UNP 100 and MS Plate 6
mm
Cap. 20 ton/day.
HB 150 x 6 lines along press
foundation c/w anchor
ø200 mm×30
ø300 mm×30
ø300 mm×15
P.7m x L. 600mm. UNP 120 and L 50
P. 7 m x L. 600 mm. UNP 120 and L
50
Lifting screw and motor for
maintenance purposes

Single Chain Type


ø300 mm×8

Cap. 30m3

L 100,UNP 100 and Cheq Plate


4.5mm
Cap.4m3

Cap. 70 ton
6
Remarks

Cap. 2000 ton

Single Chain Type.


ø300 mm×30
ø300 mm×30
Cap. 10m3

ø300 mm×6