You are on page 1of 1

PERHITUNGAN WAKTU RETENSI KERNEL DI KERNEL DRIER (target >24 jam)

Data Input
Vol.Kernel Silo = 25 m3
Density Kernel = 0.65 ton/m3
Kernel Silo dipakai = 4 unit
Tot.Vol. Silo dipakai = 100 m3
= 65 ton

Throughput = 60 ton/jam
%KER = 5 %
Kernel dihasilkan = 3 ton kernel

Maka
Retention Time = (Tot.Vol. Kernel Silo dipakai) / Kernel dihasilkan

= 21.67 jam