PEKERJAAN KOLAM
1 2 3 4 5 6
A PEKERJAAN KOLAM
III PEKERJAAN BETON
1 Pekerjaan Rabatan 10cm 1.80 m3 1,067,771.30 1,921,988.33
2 Pek. Beton Plat
- Cor beton f'c 21.7 Mpa 4.55 m3 1,200,771.30 5,463,509.40
- Besi/baja tulangan 18.00 m2 88,910.00 1,600,380.00
3 Pek. Beton Dinding
- Bekisting 2x pakai 57.00 m2 774,020.00 44,119,140.00
- Cor beton f'c 21.7 Mpa 6.00 m3 1,200,771.30 7,204,627.78
- Besi/baja tulangan 27.00 m2 88,910.00 2,400,570.00
Total : 62,710,215.51
IV PEKERJAAN PASANGAN
1 Pasangan Batu Dinding 45.00 m2 465,423.00 20,944,035.00
Total : 20,944,035.00
TOTAL 83,654,250.51