ITEM NO. DESCRIPTION OF WORK UNIT
COST QTY.
3.01 Supply, spread and compact aggregates base course cu.m. 1,229.32 242.00
(200mm thk.)
3.03 Excavate existing fill to required elevation, stockpile cu.m. 229.29 520.00
reusable materials and dispose excess at designated
area as approved by the Engineer
2.01 Chip-off existing R.C. Curb, flushed to deck level and l.m. 601.29
smoothened with mortar
2.03 Supply and install steel reinforcement for retaining wall kgs. 91.99
and slotted R.C. curb
Total for Bill No. 3
FACILITIES CONSTRUCTION AND MAINTENANCE DEPARTM
3.01 Supply, spread and compact aggregates base course cu.m. 1,229.32 242.00 297,495.44
(200mm thk.)
3.02 Construct Portland Cement Concrete Pavement sq.m. 2,694.45 1,209.00 3,257,590.05
(230mm thk.)
3.03 Excavate existing fill to required elevation, stockpile cu.m. 229.29 520.00 119,230.80
reusable materials and dispose excess at designated
area as approved by the Engineer
3.04 Prepare sub-grade surface as to required grade, sq.m. 23.82 1,209.00 28,798.38
cross section, moisture content and density
2.01 Chip-off existing R.C. Curb, flushed to deck level and l.m. 601.29
smoothened with mortar
2.03 Supply and install steel reinforcement for retaining wall kgs. 91.99
and slotted R.C. curb
Total for Bill No. 3 3,703,114.67