You are on page 1of 53

“BASIC WELL SERVICE OPERATION”

Syafruddin ZUBAER

Freelance Instructor & Consultant


06/04/2014
MAIN TOPICs

DAY-1 :

• 1.1 Introd. to Surface&DH Equip. and Well Completion


a. Surface & DH Equipment
b. Well Completion
• 1.2 Basic of Slick Line Operation
• 1.3 Basic of Electric Line Operation

Syafruddin Zubaer
06/04/2014 1.1a Surface & Down Hole Equipment 2
1.1a Introd. to Surface & Down Hole
Equipment

Syafruddin ZUBAER
( Freelance Instructor & Consultant )

06/04/2014
WELL HEAD & DOWN HOLE EQUIP.

Well Head :
Associated Well equipment on surface

Down Hole Equip. :


Associated Well equipment set down hole

Syafruddin Zubaer
06/04/2014 1.1a Surface & Down Hole Equipment 4
WELL HEAD

Well Head :

Xmast Tree

Casing Head &


Tubing Head

Syafruddin Zubaer
06/04/2014 1.1a Surface & Down Hole Equipment 5
WELL HEAD - Single Composite XmasTree

Kill valve

Syafruddin Zubaer
06/04/2014 1.1a Surface & Down Hole Equipment 6
WELL HEAD

Well Head :
Solid Block Single

Syafruddin Zubaer
06/04/2014 1.1a Surface & Down Hole Equipment 7
WELL HEAD

Well Head :

Solid Block Single

Syafruddin Zubaer
06/04/2014 1.1a Surface & Down Hole Equipment 8
WELL HEAD

Compact
Well Head:

Syafruddin Zubaer
06/04/2014 1.1a Surface & Down Hole Equipment 9
WELL HEAD

Well Head:

Syafruddin Zubaer
06/04/2014 1.1a Surface & Down Hole Equipment 10
WELL HEAD Dual Solid Block XmasTree

Dual Xmastree BKP/HDL


Syafruddin Zubaer
06/04/2014 1.1a Surface & Down Hole Equipment 11
WELL HEAD

Syafruddin Zubaer
06/04/2014 1.1a Surface & Down Hole Equipment 12
SURFACE & DOWN HOLE EQUIP.

Surface Equipment:

Well Head :
Casing Head
Tubing Head

Xmast Tree

Syafruddin Zubaer
06/04/2014 1.1a Surface & Down Hole Equipment 13
WELL HEAD

To be remembered
Tree Cap/Adaptor
Swab Valve ~ SWV
Upper Master Vv(Act) ~ UMV W/ or W/out Wire Cut
Lower Master Valve ~ LMV
Wing Valve (Act) ~ FWV SSV
Kill Line Valve ~ KWV
Choke Valve ~ CHV
Flow Line Valve ~ FLV
Casing Valve “0” ~ Annulus 0
Casing Valve “1” ~ Annulus 1
Syafruddin Zubaer
06/04/2014 1.1a Surface & Down Hole Equipment 14
WELL HEAD

FWV
SWV
CHV
KWV
FLV
UMV
LWV

Ann 0 Ann 0
Ann 1 Ann 1

Syafruddin Zubaer
06/04/2014 1.1a Surface & Down Hole Equipment 15
WELL HEAD

Well
Head :

Syafruddin Zubaer
06/04/2014 1.1a Surface & Down Hole Equipment 16
WELL HEAD Single Horizontal Xmastree

Syafruddin Zubaer
06/04/2014 1.1a Surface & Down Hole Equipment 17
WELL HEAD Dual Xmastree

Syafruddin Zubaer
06/04/2014 1.1a Surface & Down Hole Equipment 18
WELL HEAD

Well Head :
(Splitter)

In one 30” Conductor


there are 2x 9 5/8” Prod
Casing
Consist of 2 different
wells with its different
direction&trajectory

Syafruddin Zubaer
06/04/2014 1.1a Surface & Down Hole Equipment 19
WELL HEAD

Well Head :
(Splitter)

Syafruddin Zubaer
06/04/2014 1.1a Surface & Down Hole Equipment 20
WELL HEAD Splitter Well Head

Well Head :

Syafruddin Zubaer
06/04/2014 1.1a Surface & Down Hole Equipment 21
WELL HEAD

Well Integrity

To ensure the Safe status of Well Head and DHSV


(….and other DH Equipments if required)
Integrity Test
Ref. CR – FP422 (Barrier for Completed Well)
Xmastree Vlv’s,gaskets,Flange etc.
Casing Valves
Closing time response of any actuated equipment
(DHSV,Actuator etc)

Syafruddin Zubaer
06/04/2014 1.1a Surface & Down Hole Equipment 22
WELL HEAD

Well Integrity

Time period
Integrity Test every 6 months for XTree & DHSV
Replacement 12 months for DHSV

Acceptable Leak Rate


15 SCFM for Gas leak
25 Ltr/Hour for Liquid Leak

Syafruddin Zubaer
06/04/2014 1.1a Surface & Down Hole Equipment 23
DOWN HOLE EQUIP.

Down Hole Equip.


WLEG (Wire Line Entry Guide)
Landing Nipples( Top NoGo,Bottom NoGo)
Packer (Single/Dual, Mech/Hydraulic/Electric,
Permanent/ Retrievable)
Circulating Device (SSD,SPM,Port Nipple etc)
Tubing
Special Joint(Blast /Perforated/Expansion/ Protection /
Flow Coupling)
DHSV (WRSV/TRSV)
Tubing Hanger

Syafruddin Zubaer
06/04/2014 1.1a Surface & Down Hole Equipment 24
DOWN HOLE EQUIP.

Completed well

Syafruddin Zubaer
06/04/2014 1.1a Surface & Down Hole Equipment 25
DOWN HOLE EQUIP.

Wire Line Entry Guide

Syafruddin Zubaer
06/04/2014 1.1a Surface & Down Hole Equipment 26
DOWN HOLE EQUIP.

Landing
Nipple

Syafruddin Zubaer
06/04/2014 1.1a Surface & Down Hole Equipment 27
DOWN HOLE EQUIP.

PACKER

Syafruddin Zubaer
06/04/2014 1.1a Surface & Down Hole Equipment 28
DOWN HOLE EQUIP.

PACKER
Setting:
Wire Line,Hydraulic
Mechanical
Retrievability:
Retrievable,Permanent
Tubing String:
Single
Dual

Syafruddin Zubaer
06/04/2014 1.1a Surface & Down Hole Equipment 29
DOWN HOLE EQUIP.

Sliding Side Door

Syafruddin Zubaer
06/04/2014 1.1a Surface & Down Hole Equipment 30
DOWN HOLE EQUIP.

SPM (Side
Pocket
Mandrel)

Syafruddin Zubaer
06/04/2014 1.1a Surface & Down Hole Equipment 31
DOWN HOLE EQUIP. F.Coupling/P.Tube

Syafruddin Zubaer
06/04/2014 1.1a Surface & Down Hole Equipment 32
DOWN HOLE EQUIP.

Safety Valve

Surface Safety Valve (SSV)

Sub Surface Safety Valve (DHSV)


DHSV Fail Save

Sub Surface Controlled SV (SSCSV)


Surface Controlled Sub Surface SV (SCSSV)

Syafruddin Zubaer
06/04/2014 1.1a Surface & Down Hole Equipment 33
DOWN HOLE EQUIP.
Control Line (To Surface)

SCSSV Type
Lock Mandrel

TRSV (Tbg Retrv)


WRSV(WL Retrv)

Hydraulic Landing Nipple

SSCSV Type
Press Diff SV
Ambient SV ( “K” valve)
Wireline Installed Surface Controlled
Sub-Surface Safety Valve

Syafruddin Zubaer
06/04/2014 1.1a Surface & Down Hole Equipment 34
DOWN HOLE EQUIP.
Control Line (To Surface)

DHSV SSSV (Fail Save)


Sub Surface Controlled SV Lock Mandrel

Surface Controlled Sub SurfaceSV

Valve Closure
Ball Type Hydraulic Landing Nipple

Flapper Type

Equalizing system
Equalizing Type Wireline Installed Surface Controlled
Sub-Surface Safety Valve

Non Equalizing Type

Syafruddin Zubaer
06/04/2014 1.1a Surface & Down Hole Equipment 35
DOWN HOLE EQUIP.

Control Line (To Surface)

Lock Mandrel

Hydraulic Landing Nipple

Wireline Installed Surface Controlled


Sub-Surface Safety Valve

Syafruddin Zubaer
06/04/2014 1.1a Surface & Down Hole Equipment 36
DOWN HOLE EQUIP.

Syafruddin Zubaer
06/04/2014 1.1a Surface & Down Hole Equipment 37
DOWN HOLE EQUIP.
Guideline for Hold Open Pressure

Opening Pressure
The pressure required to fully open the SV in
atmospheric condition

Hold Open Pressure


The pressure required to maintain the SV in open
conditions during well production

Recommended Hold Open Pressure


Opening Pressure+Tubing Pressure+(500 to 1000) psi

Syafruddin Zubaer
06/04/2014 1.1a Surface & Down Hole Equipment 38
DOWN HOLE EQUIP : WR SCSSV

Hydraulic
Supply pressure
supply
usually 4000 psi

Sleeve
Packing
WR SCSSV
Spring
Open position
Pressure
equalising
line

Flapper
Syafruddin Zubaer
1.1a Surface & Down Hole Equipment 39
DOWN HOLE EQUIP : TR SCSSV

Hydraulic
Supply pressure
supply
usually 4000 psi

Sleeve
Packing
TR SCSSV
Spring
Open position

Flapper
Syafruddin Zubaer
06/04/2014 1.1a Surface & Down Hole Equipment 40
DOWN HOLE EQUIP:Macaroni DBSV (Diamond Board SV)

Hydraulic Supply pressure


Packing
supply usually 4000 psi

Tubing
Sleeve Tubing sleeve

Spring

Coil Tubing
sleeve
Flapper
Syafruddin Zubaer
06/04/2014 1.1a Surface & Down Hole Equipment 41
DOWN HOLE EQUIP. DHSafety Valve

Syafruddin Zubaer
06/04/2014 1.1a Surface & Down Hole Equipment 42
DOWN HOLE EQUIP. DHSafety Valve

Syafruddin Zubaer
06/04/2014 1.1a Surface & Down Hole Equipment 43
DOWN HOLE EQUIP. Self-Equalizing Flapper

• When the valve is closed, the


equalizing mechanism’s port
is protected from debris

• The Flow Tube depresses


the plunger to open an
equalizing path prior to the
valve opening

• The Flapper swings


completely out of the flow
path, protecting the Flapper
and seat from wireline tool
damage. The equalizing
feature returns to the closed
position when the valve is
fully open
Syafruddin Zubaer
06/04/2014 1.1a Surface & Down Hole Equipment 44
DOWN HOLE EQUIP.

Production Tubing
• Size : 2” – 2 3/8” , 2 1/2” – 2 7/8”, 3” – 3 ½” ,
4” – 4 ½” , 5” - 5 ½”
• Length : R1 ( 7,5 - 8,5 m)
R2 ( 8,5 – 9,5 m)
R3 ( 9,5 - 10,5 m)
• Thread Type :
VAM , Atlas Breadford, Upset,Non Upset,CS
Hydrill etc

Syafruddin Zubaer
06/04/2014 1.1a Surface & Down Hole Equipment 45
DOWN HOLE EQUIP.

Tubing Hanger

Syafruddin Zubaer
06/04/2014 1.1a Surface & Down Hole Equipment 46
WELL HEAD

CASING HEAD TUBING HEAD

Syafruddin Zubaer
06/04/2014 1.1a Surface & Down Hole Equipment 47
DOWN HOLE EQUIP.

Tubing Hanger Plug


Wire Line Set
Mechanical Set

Syafruddin Zubaer
06/04/2014 1.1a Surface & Down Hole Equipment 48
DOWN HOLE EQUIP.

Tbg Hanger Plug ( Mechanical set)

Syafruddin Zubaer
06/04/2014 1.1a Surface & Down Hole Equipment 49
DOWN HOLE EQUIP.

Syafruddin Zubaer
06/04/2014 1.1a Surface & Down Hole Equipment 50
DOWN HOLE EQUIP.

Well Flow
NATURAL FLOW

ARTIFICIAL LIFT
–Pumping Method
- Sucker Rod : Beam Pumping,PCP
- ESP (Electric Submergible Pump)
- Hydraulic Jet
–Gas Lift Method
- Continous Injection : SPM,GLM,GLPO
- Intermittent Injection
Syafruddin Zubaer
06/04/2014 1.1a Surface & Down Hole Equipment 51
DOWN HOLE EQUIP.

ARTIFICIAL LIFT
Pumping
Sucker Rod Pump
Beam Pump
Rotary “Moyno”
Rodemip ~> PCP
Centrifugal - ESP
Hydraulic Jet Pump
Plunger Lift

Syafruddin Zubaer
06/04/2014 1.1a Surface & Down Hole Equipment 52
DOWN HOLE EQUIP.

ARTIFICIAL LIFT

Gas Lift
Continous
Intermittent
GL Macarony

Syafruddin Zubaer
06/04/2014 1.1a Surface & Down Hole Equipment 53

You might also like