QUESTION 2 [40]
The following horizontal and vertical alignments apply to a rural road. The design speed for this
road is 100km/hr.
a. Calculate the stake values of BC2 and the co-ordinates for EC2 (12)
b. A pedestrian bridge crosses this road at the high point of vertical curve 9. Determine the
stake value where this bridge crosses the road.(8)
c. Calculate the final road levels (left edge, centre-line, and right edge) at stake values
42000.0 and 42100.0 if the following details apply to the horizontal curve. (20)
left turning horizontal; maximum super elevation is 6.5%
BC stake value is 41 645.231; EC stake value is 42 234.841 (20)
1 of 10
TRE200S Tutorial 3 MEMO – Semester 1, 2019
Given R = 1 000m
792.607 1 820.047
Y X
PI2 24 071.500 15 807.000
= 613.066
SV @ EC2 =
46500 - (444.012 – 316.509) = 46372.497
Join - TLength
SV @ BC2 = 46372.497 – 613.066 = 45 759 .431m
Chord length
Co-ordinates at EC2
Calculate polar using TL (316.509m) in the direction of 1680 24”23’
Y X
End 24160.733 15 372.047
Subtract _________ (-ve)______
24 135.108 15 496.949
2 of 10
TRE200S Tutorial 3 MEMO – Semester 1, 2019
b) A pedestrian bridge crosses this road at the high point of vertical curve 9. Determine the
stake value where this bridge crosses the road. (8)
203.17 – 215.255
44 740 – 45 880 = 1.06% (G1)
215.255 – 200.170
45 880 – 46 500 = - 2.43% (G2)
c) Calculate the final road levels (left edge, centre-line, right edge) at stake values 42 000.0
and 42 100.0 if the following details apply to the horizontal curve : (20)
d) left turning horizontal
e) maximum super elevation is 6.5%
f) BC stake value is 41 645.231
g) EC stake value is 42 234.841 (20)
Super-elevation runoff = =
5.7 * 6.5 * 230 * 1.0
100
3 of 10
TRE200S Tutorial 3 MEMO – Semester 1, 2019
SV 42 000 & SV 42 100 are situated in the H/Curve (full s/elevation) (BC SV 41 645.231 to EC SV 42 234.841)
Stake Value CLine FRL Cross Fall Road Level Cross Fall Road Level
Left (Left) Right (Right)
42 000 140.376 -6.5 140.006 +6.5 140.747
42100 142.615 -6.5 142.245 +6.5 142.986
FRL @ SV 42000 = 137.203 (HVPI2) + (-0.43% * (240 60)) + [3.66 __ * (41700 – 42000)2] = 140.376
200*480
FRL Left = (-0.065 * 5.7) + 140.376 = 140.006; RL Rgt = (+0.065 * 5.7) + 140.376 = 140.747
RL Left = (-0.065 * 5.7) + 142.615 = 142.245; RL Rgt = (0.065 * 5.7) + 142.615 = 142.986
4 of 10
TRE200S Tutorial 3 MEMO – Semester 1, 2019
5 of 10
TRE200S Tutorial 3 MEMO – Semester 1, 2019
This is a left turning curve at 6.5% S/Elev.
Why? Banking is occurring on the right hand side of the road; i.e. it rises on the right
x% ?
-2% -0% +2% SV is known +6.5%
2/3 L =
CL =
CL =
6 of 10