Civil Clearance Required to Start the MEP First Fix Activities in High Level as per attached appro
Civil Clearance Required to Start the MEP Second Fix Activities in High Level as per attached ap
Civil Clearance Required to Start the MEP Final Fix Activities in High Level as per attached appro
Civil Clearance Required to Start the Works Inside the Risers from as per the attached approved
Civil clearance Required to Starts the MEP High Level Work as per attached drawings
Required Civil clearance to Start the Floor Conduits Works as per attached shop drawing and ske
Civil Clearance to Starts Ceiling Painting to Install the Highlevel MEP Services for Generator room
drawings
Required civil Clearance to Install the MEP Equipments in the Foundation as per attached appro
Required Civil Clearance to Start the Installation of Ceiling Suspended Fans in Highlevel as per a
Required civil clearance for Cutting and Chipping in the Slab to start the Installation of MEP Serv
approved drawings
Required civil Clearance to Make the Blockwall Openings to Install the MEP services as per attac
Required Civil Clearance to Start the Coring in the Slab as per the attached approved shop draw
Required Civil Clearance to Make the hole for Aluminum Frame to Install the Light Fitting as per
Required Civil Clearance to Start the Chipping in the Screed to Change the Damaged Conduits a
Required Civil Clearance to Start the Rectification Work in Stairecases as per the attached Highl
Required Civil Paint Clearance to Start the MEP Works in Service Rooms (Electrical and Telephon
Highlighed Areas