Construction Cost Components Approval Fees Cost
Construction Cost Components Approval Fees Cost
Material Cost
Building material cost contributes nearly 50 to 60 percentage of the total construction cost of any building
construction project. Items used are Cement, Sand, Steel, Gravel, Bricks, Plumbing, Electrical, Tiles, Granite Slabs,
Paint, Wood, Timber, Glass etc.
Cost of Steel: Rs.65,000 per Ton, Sand: Rs.1,800 per Ton, Cement: Rs.380 per bag, Bricks: Rs.7 per piece,
Wooden Door Frame (Teak): Rs.8,000 per piece, Wooden Door Frames (Non Teak): Rs.4,500 per piece, Windows
(UPVC): Rs.525 per Sq Ft, Electrical Wires (1 sq mm): Rs.900 per 90 mtrs. etc...
Labour Charges
Labour charges or Workers cost is the second biggest cost factor of any construction project, including Hyderabad,
Bengaluru.
Right from the excavation to the final painting and cleaning of the site before handover to clients, every
construction activity is highly labour intensive and consumes lots of man hours to complete.
Tentatively, combined labour charges of all the works involved in a construction project contributes almost 35 to 40
percent of the total construction cost in Hyderabad.
Cement Cost
Cement Cost Rs.380/- per bag.
Bricks Cost
Brick Cost Rs.8/- per piece.
Electrical Cost
Conduits, Wires, Switches etc.
Plumbing Cost
Plumbing Material and Labour
Fabrication Charges
Grills, Fencing & Gate.
A Construction Cost
Civil: Foundation, Columns, Beams, Slab, Stairs, Brick work, Plastering - per Sq Ft of Floor Rs.880 to
1
Area. Rs.1250
Finishing Materials: Plumbing, Electrical, Flooring, Tiles, Granite/Marble, Doors, Windows, Rs.550 to
2
Painting, Steel Fabrication - per Sq Ft of Floor Area. Rs.1850
Rs.1430 to
B Total:
Rs.3100