You are on page 1of 1

Project 33/11kV SHAMAL GHARABA PRIMARY FIRE PUMP RODate 17-Jul-18 Page

Client AADC Prep'd JK Chk'd SP


Main Contractor L&T Rev 01 App'd SP
Structure Monorail at Fire Pump Room

1.0 Introduction

The intent of this document is to analyse and design 2.5T capacity monorail support beam. All the supports are
assumed as 'pinned' in structural analysis.

1.1 References

Codes and Standards

BS-5950 - STRUCTURAL USE OF STEELWORK IN BUILDINGS


BS-6399 - LOADINGS FOR BUILDINGS

1.2 Design Loads

Lifting Load = 2500 Kg


= 25 kN

Lifting Height = 7m

Weight Of trolley = 260 Kg = 2.6 kN

So, total load = 27.6 kN

Considering 25% impact load conservatively,


Total Load = 27.6 x 1.25 = 34.5 kN

Horizontal load = 10 % of the vertical load

= 3.45 kN (Both lateral & longitudinal direction)

1.3 Primary Load Cases:-

1.) Dead Load


Self weight of monorail beam

2.) Live Load 1


Condition where the hoist is exactly at the centre of the monorail beam

3.) Live Load 2


Condition where the hoist is near the support of the monorail beam

1.4 Load Combinations:-

Ultimate Load Combination:-


10) 1.4 Dead Load + 1.6 Live Load case 1
11) 1.4 Dead Load + 1.6 Live Load case 2

Service Load Combination:-


20) 1.0 Dead Load + 1.0 Live Load case 1
21) 1.0 Dead Load + 1.0 Live Load case 2