ACCIONA at a glance
Global reach
Integrated
Business Model
2
ACCIONA at a glance
Cubiertas y Tejados
In 2005 ACCIONA changed the is founded en 1916
corporate image, branding and
logo to the current ones
Services Agua
ACCIONA is part of the:
• IBEX 35 Madrid Stock Exchange
• Dow Jones Sustainability
World Index (DSJI World) Sustainability
• Dow Jones Stoxx Sustainability
Index (DJSSI)
• Global Compact Lead
• World Business Council for
Sustainable Development
(WBCSD)
Energy
Infrastructure
4
ACCIONA at a glance
CAPEX 2014
436 M€
Revenues 2014
6,500 M€
EBITDA 2014
1,009 M€
5
ACCIONA Around the world
6
ACCIONA Innovation
7
ACCIONA in Asia
8
ACCIONA in Asia
9
ACCIONA in Australia
Cathedral Rocks Wind Farm Royalla Solar Farm Engineering and Construction
Adelaide Office
Gunning Wind Farm
Adelaide Desalination Plant
Waubra Windfarm
Melbourne Office
East West Link Tollway
10
Acciona in Australia
11
Acciona in Australia
ACCIONA Energy
12
Acciona in Australia
ACCIONA Agua
for Adelaide
The expanded capacity of the plant will be 300,000 m3/day (to be built in two phases of
150,000 m3/day)
13
Acciona in Australia
ACCIONA Infrastructure
• Offices in Brisbane, Melbourne and Sydney.
• Member of Queensland Major Contractors Association (Tier 1 Contractors)
• Prequalified under Austroads National Prequalification system in the highest levels :R5-B4-F150 PLUS
ACCIONA Infrastructure
ACCIONA Infrastructure
16
Roads and Bridges
Roads
ACCIONA’s experience in roads goes
from complex projects in highly
populated areas (such as A-30
Highway in Canada) to greenfield
projects in remote areas
(Mamiengue-Fougamou Highway in
Gabon).
17
Roads and Bridges
18
Rail – Madrid Metro North
Client MINTRA
Budget 112 M € 1st
section (167 M
AUD)
143.5 M € 2nd
section (214.8
M AUD)
Duration 40 months
TBM tunnels 3.85 km
length MADRILADORA TBM
4.48 km
CHOTIS TBM
Stations 6
Cut and cover 437.49 m
tunnel 19
Rail – Madrid Metro North
20
Rail – Metro Barcelnoa Line 9
Client GISA
22
Rail – Metro KCRC Ma On Shan – East Rail Hong Kong
23
Rail – Zaragoza Light Rail
24
Rail – Zaragoza Light Rail
Length of the Line 1: 12,8 km
Number of Stops: 25 Stops
Number of Trams: 21 units in 2013
Length of Trams: 32 meters up to 42
meters
Capacity: 200 passengers,
Supply: Catenary except in the city centre
Frequency peak hour: 5 ’
Total Trip north - south: 40 ‘
Distance between stops: 500 meters
Interchangers: 3
Intermodal Parkings: 2
Depots: 2
25
Rail – Sydney Light Rail
Design, construction, testing, commissioning, operation, maintenance and
financing of a new CBD and South East Light Rail (CSELR)
Circular Quay to Central Station and onto suburbs in the south east
(Surry Hills, Moore Park, Randwick, Kensington and Kingsford)
13km of new double track
20 new light rail stops
Wire (catenary) free pedestrian zone in Sydney CBD (George St between
Bathurst and Hunter Streets)
30 electric-powered light rail vehicles
Peak service frequency 2-3 mins Indicative artist impression of the SLR PPP – Martin Place
Source: Transport for NSW
System to move up to 9,000 passengers per hour (each direction)
Stabling facilities at Randwick and maintenance facilities at Rozelle
Operate and maintain the existing Inner West Light Rail (IWLR)
12.8 km track from Central Station to Dulwich Hill (includes 5.6 km
extension currently under construction)
12 existing electric-powered light rail vehicles (200 person capacity)
Peak service frequency 10 mins
26
Rail – High Speed Rail Madrid – Barcelona - French Border
27
Tunnelling Capabilities
One of the largest tunnelling players in the world
Type of works:
28
Underground Works
29
Underground Works
ACCIONA’s specialised
underground plant and
machinery resources
include:
•TBMs
•Road Headers
•Tunnelling Jumbos
•Wetkret Machines
•Platforms
•Locomotives
•Segments Platforms
•Mixer Wagons
•Concrete Mixers
•Materials Platforms
•Personnel Wagons
•Fans
•Gantries
•Cooling Towers
30
ACCIONA’s PPP and Concession Division Introduction
ACCIONA Concessions is one of the leading infrastructure developers in the World by number
and volume of projects, with a total experience of 33 projects developed and managed
Currently, ACCIONA Concessions holds a portfolio of 23 PPP projects in Brazil, Canada, Chile,
Mexico and Spain, including 11 highways (both toll and availability roads), three light rail
projects, six hospitals and other various infrastructure assets. The majority of the portfolio is at
operations stage having successfully achieved construction completion and commissioning
Some of the projects have been awarded important international recognitions such as:
The “North American P3 Deal of the Year 2008” by Project Finance Magazine for the A$
1,7 billion A-30 highway in Canada
The “2009 CCPPP National Awards for Innovation and Excellence” for the 500 bed Royal
Jubilee Hospital in Canada, currently under operation.
The “Euromoney & Project finance Magazine 2004”, for the “CM 400 Highway (Consuegra
– Tomelloso)- AUVISA”
The “Future health project 2012”, for the “Vigo Hospital”
The “UITP local rail awards 2012” for best urban integration project and finalist for the
“Best alternative deal structure” for the “Zaragoza light Rail”
In Chile, “Route 160”, was finalist for the “innovation and environment 2011”
31
ACCIONA’s roles in a PPP – Delivery Phase
Engineering
+50 years of lidership.
Civil and environmental Construction
engineering, Industrial
infrastructure and architecture Civil and building
Concessions
Financing – management – O&M
Social and transport infrastructure
32
ACCIONA’s PPP Portfolio
ACCIONA Concessions Portfolio
33
ACCIONA’s PPP Portfolio
ACCIONA Infrastructure Investment Portfolio
34
ACCIONA’s PPP Portfolio
ACCIONA Infrastructure Investment Portfolio
35
ACCIONA’s PPP Portfolio
ACCIONA Infrastructure Investment Portfolio
36
Selected Landmark Projects– Infrastructure
Transportation Maritime Works
High Speed Rail, Spain Superport of Acu, Brazil
More than 1000 km of Design and Largest Mineral Port in South America,
Construct of High speed networks able to fit Chinamax vessels
38
ACCIONA Infraestructuras’ experience in images
39
ACCIONA Infraestructuras’ experience in images
40
ACCIONA Infraestructuras’ experience in images
41
ACCIONA Infraestructuras’ experience in images
42
ACCIONA Infraestructuras’ experience in images
43
ACCIONA Infraestructuras’ experience in images
44
ACCIONA Infraestructuras’ experience in images
45
ACCIONA Infraestructuras’ experience in images
46
ACCIONA Infraestructuras’ experience in images
47
ACCIONA Infraestructuras’ experience in images
48
ACCIONA Infraestructuras’ experience in images
49
ACCIONA Infraestructuras’ experience in images
50
ACCIONA Infraestructuras’ experience in images
51
ACCIONA Infraestructuras’ experience in images
52
ACCIONA Infraestructuras’ experience in images
53
ACCIONA Infraestructuras’ experience in images
54
ACCIONA Infraestructuras’ experience in images
55
ACCIONA Infraestructuras’ experience in images
56
ACCIONA Infraestructuras’ experience in images
57
ACCIONA Infraestructuras’ experience in images
58
ACCIONA Infraestructuras’ experience in images
59
ACCIONA Infraestructuras’ experience in images
60
ACCIONA Infraestructuras’ experience in images
61
ACCIONA Infraestructuras’ experience in images
62
ACCIONA Infraestructuras’ experience in images
63
ACCIONA Infraestructuras’ experience in images
64
ACCIONA Infraestructuras’ experience in images
65
ACCIONA Infraestructuras’ experience in images
66
ACCIONA Infraestructuras’ experience in images
67
ACCIONA Infraestructuras’ experience in images
68
ACCIONA Infraestructuras’ experience in images
69
www.acciona.com.au
70