DATE Work Location Work Content & Description Commment from Superviser
1st Serang outer 2 02PDG057- CILONGKRANG HIGHTEMP
Dispatching
1-Apr-12 Dispatching End 30-Apr-12 Total
Start
Designed
No. Scoring Item Score Scoring Criteria
Score
1 Work Quality 40
2. For each General Error found by CONTRACTOR, 1 point will be deducte
designated time and 5 if refused to make any correction. The score will be the re
1. 2 points will be deducted for each delay in the work or client complaint for
English competence).
Communication and
2 20
Cooperative
2. The score will be the result of deduction of the points for errors from a bas
1. The labor is required to be punctual in work and obey the tasking orders f
Pressure Enduring
3 30
Performance
2. 2 points will be deducted for each error found. The score will be the result
30.
1. The labor is required to observe local religious taboos and the behavior s
Manners and
4 10
Behavior
2. 1 point will be deducted for each error found. The score will be the result o
Total Score:
Remarks: If any deduction is made in the form, a Score Deduction Accident Record Form shall be attached.Major accidents shall be handled in accord
Liabilities of the Agreement.
ion Sheet
al 1 Month
patched Labor
Scoring Criteria
OR, 3 points will be deducted if corrected in time, 5 if corrected later than the designated
CTOR, 1 point will be deducted if corrected in time, 2 if corrected later than the
tion. The score will be the result of deduction of the points for erro
e work or client complaint for poor communication and cooperative (including poor
and obey the tasking orders from the project manager positively.
d. The score will be the result of deduction of the points for errors from a base score of
The score will be the result of deduction of the points for errors from a base score of 10.
Date