EVN/GENCO3 - VTTPMB VINH TAN 4E TPP The Consortium of PECC3-PECC4 (PMC)

COMMENTS and REPLIES

i Sender of Document The Consortium of DHI-MC- The Consortium of DHI-MC-


PECC2-PAC (DMPP) PECC2-PAC (DMPP)
ii Covering Letter No & Date VT4E-L-DMPPS-PMB-C-19- VT4E-L-DMPPS-PMB-C-19-
0615 dated 04-Apr-2019 0913 dated 03-June-2019
iii Doc Ident No & Rev VT4E-L-DMPPS-PMB-C-19- VT4E-L-DMPPS-PMB-C-19-
0615A 0913A
iv Title of Document Inspection Record of Door Inspection Record of Door
and Window Installation and Window Installation
Works at MEB (Rev.0) Works at MEB (Rev.0)

Owner/Engineer Accepts Reply?


v Date Doc Rec'd by Engineer 08-Apr-19 03-June-19
vi Reviewed by & date completed by NHThao, NTKhue 23-Apr- by CVThi, NTKhue 10-June-19
19
vii Date & No CaRs iss. to Owner xx-Apr-19, CaRs 4724 (R1) xx-Jun-19, CaRs 4724 (R2)
viii Date & No CaRs iss. Contractor 30-May-19, CaRs 4724 (R1) xx-Jun-19, CaRs 4724 (R2)
Inspection Record of Door
VT4E-L-DMPPS-PMB-C-19- and Window Installation
0913A Works at MEB (Rev.0)
Contract / Doc Cls/Page OWNER/ENGINEER's CONTRACTOR's OWNER/ENGINEER's CONTRACTOR's
No Spec Ref Drg Ref etc ROUND 1 COMMENTS ROUND 1 REPLIES ROUND 2 COMMENTS ROUND 2 REPLIES
General Comments
STATUS AFTER R1 COMMENTS: STATUS AFTER R2 COMMENTS:
AIC AIC
General Comments
1 Please revise the date of inspection, in DMPP has re-checked and revised Reply Accepted
December, owner representative (Mr.
Tra Trung Toan) was absent at the
construcsion site

2 DMPP is requested to revise date and


time of inspection. Inspection date
must be after the approval date of shop
drawing.
3
4
5
6
7
8
9
Detailed Comments
11
13
14
15
MASTER CaRs SHEET
Revised 04-Aug-2014 The Owner/Engineer's review of the subject document does not relieve the Contractor of his responsibilities under the Contract. Page 1 of 2
Owner/Engineer Accepts Reply?
EVN/GENCO3 - VTTPMB VINH TAN 4E TPP The Consortium of PECC3-PECC4 (PMC)
COMMENTS and REPLIES

Inspection Record of Door


VT4E-L-DMPPS-PMB-C-19- and Window Installation
0913A Works at MEB (Rev.0)
Contract / Doc Cls/Page OWNER/ENGINEER's CONTRACTOR's OWNER/ENGINEER's CONTRACTOR's
No Spec Ref Drg Ref etc ROUND 1 COMMENTS ROUND 1 REPLIES ROUND 2 COMMENTS ROUND 2 REPLIES
16

MASTER CaRs SHEET


Revised 04-Aug-2014 The Owner/Engineer's review of the subject document does not relieve the Contractor of his responsibilities under the Contract. Page 2 of 2