EVN/GENCO3 - VTTPMB VINH TAN 4E TPP The Consortium of PECC3-PECC4 (PMC)
COMMENTS and REPLIES
i Sender of Document The Consortium of DHI-MC- The Consortium of DHI-MC-
PECC2-PAC (DMPP) PECC2-PAC (DMPP) ii Covering Letter No & Date VT4E-L-DMPPS-PMB-C-19- VT4E-L-DMPPS-PMB-C-19- 0615 dated 04-Apr-2019 0913 dated 03-June-2019 iii Doc Ident No & Rev VT4E-L-DMPPS-PMB-C-19- VT4E-L-DMPPS-PMB-C-19- 0615A 0913A iv Title of Document Inspection Record of Door Inspection Record of Door and Window Installation and Window Installation Works at MEB (Rev.0) Works at MEB (Rev.0)
Owner/Engineer Accepts Reply?
v Date Doc Rec'd by Engineer 08-Apr-19 03-June-19 vi Reviewed by & date completed by NHThao, NTKhue 23-Apr- by CVThi, NTKhue 10-June-19 19 vii Date & No CaRs iss. to Owner xx-Apr-19, CaRs 4724 (R1) xx-Jun-19, CaRs 4724 (R2) viii Date & No CaRs iss. Contractor 30-May-19, CaRs 4724 (R1) xx-Jun-19, CaRs 4724 (R2) Inspection Record of Door VT4E-L-DMPPS-PMB-C-19- and Window Installation 0913A Works at MEB (Rev.0) Contract / Doc Cls/Page OWNER/ENGINEER's CONTRACTOR's OWNER/ENGINEER's CONTRACTOR's No Spec Ref Drg Ref etc ROUND 1 COMMENTS ROUND 1 REPLIES ROUND 2 COMMENTS ROUND 2 REPLIES General Comments STATUS AFTER R1 COMMENTS: STATUS AFTER R2 COMMENTS: AIC AIC General Comments 1 Please revise the date of inspection, in DMPP has re-checked and revised Reply Accepted December, owner representative (Mr. Tra Trung Toan) was absent at the construcsion site
2 DMPP is requested to revise date and
time of inspection. Inspection date must be after the approval date of shop drawing. 3 4 5 6 7 8 9 Detailed Comments 11 13 14 15 MASTER CaRs SHEET Revised 04-Aug-2014 The Owner/Engineer's review of the subject document does not relieve the Contractor of his responsibilities under the Contract. Page 1 of 2 Owner/Engineer Accepts Reply? EVN/GENCO3 - VTTPMB VINH TAN 4E TPP The Consortium of PECC3-PECC4 (PMC) COMMENTS and REPLIES
Inspection Record of Door
VT4E-L-DMPPS-PMB-C-19- and Window Installation 0913A Works at MEB (Rev.0) Contract / Doc Cls/Page OWNER/ENGINEER's CONTRACTOR's OWNER/ENGINEER's CONTRACTOR's No Spec Ref Drg Ref etc ROUND 1 COMMENTS ROUND 1 REPLIES ROUND 2 COMMENTS ROUND 2 REPLIES 16
MASTER CaRs SHEET
Revised 04-Aug-2014 The Owner/Engineer's review of the subject document does not relieve the Contractor of his responsibilities under the Contract. Page 2 of 2