ROMEO P. DELA PEÑA-Registered Electrical Engineer
ROMEO P. DELA PEÑA-Registered Electrical Engineer
Dear Sir:
After our second meeting last Tuesday, August 19, 2014 at about 2:40 P.M. we come-up with a proposal to prepare a
final electrical audit and report, as to the actual set-up of the electrical load that is currently connected to each tenant,
namely: Fast Cargo, Airlift Asia and DHL.
Also included in the final electrical audit, is the actual electrical connected load of Ambiente Designs International
that is currently using and other loads that is rarely used but still to be accounted as connected load.
Based from the electrical data audited and gathered by Engr. Gigi Canata, please find herewith, the individual
scheduled of loads of each tenant, as well as the schedule of load of Ambiente Designs International.
Page 1 of 5
B. SCHEDULE OF LOADS, “MCC-2” (LOCATION: WOOD WORKING AREA)
CKT AMPERES PROTECTION
NO. LOAD DESCRIPTION HP KW Volts AB BC CA I 3P AT POLE
1 RADIAL ARM SAW # 1 3 2.24 220 7.35 20 3P
2 RADIAL ARM SAW # 1 5 3.73 220 12.24 20 3P
3 PLAINER # 2 5 3.73 220 12.24 20 3P
4 TABLE SAW # 2 5 3.73 220 12.24 20 3P
5 HAND JOINTER # 2 3 3.73 220 7.35 20 3P
6 BAND SAW # 1 3 3.73 220 7.35 20 3P
TOTAL 20.89 58.77
COMPUTATION:
IT = [58.77 + (0.25 x 12.24)] x 0.85 D.F.
= 52.56 AMPS.
SIZE OF WIRE : 3-14 MM2 THW CU. WIRE OR COPPER BUS BAR
PROTECTION : USE 100AT/225AF. 3P, 240V CIRCUIT BREAKER
Page 3 of 5
H. SCHEDULE OF LOADS FOR COMPRESSORS AND FIRE PUMP MOTOR
CKT AMPERES PROTECTION
NO. LOAD DESCRIPTION HP KW Volts AB BC CA I 3P AT POLE
1 AIR COMPRESSOR 15 11.19 220 36.71 60 3P
2 FIRE PUMP MOTOR 15 11.19 220 36.71 60 3P
TOTAL 22.28 73.42
SUBMITTED BY:
Page 5 of 5