Design of Continuous Two-way slab

Banking hall
slab is restrained with edge beams
given
Material M15 grade concrete
HYSD reinforcement of grade Fe415
Solution : -
Assume 150 mm thick slab
2
Self load 0.15 x 25 = 3.75 KN / m
2
floor finish = 1.00 KN / m
2
Live Load = 3.00 KN / m
2
Total 7.75 KN / m
Pu = 1.5 x 7.75
2
= 11.625 KN / m
ly / lx = 5 / 5
=1 < 2 i.e. two-way slab.
Middle strip :
IS 456-2000 Table -26 Two adjacent edges Discontinuous
2 2
Mu1 , Mu3 ( - ) = αx x w x lx = 0.047 x 11.625 x 5 = 13.66 KNm
2 2
Mu2 ( + ) = αy x w x lx = 0.035 x 11.625 x 5 = 10.17 KNm
From Table 6-3
For M15 mix and Fe415 steel, Q = 2.07
drequired =√M / Q x b
= √13.66 x 10 / 2.07 x 1000
6

= 81.23 mm,
dprovided for positive moment reinforcement
= 150 - 15 - 10 - 5 ( assume 10 O bar )
= 120 mm, > 81.23 mm ……………….( O.K.)
dprovided for negative moment reinforcement
= 150 - 15 - 5
= 130 mm, > 81.23 mm ……………….( O.K.)
2 6 2
Mu / b x d ( + ) = 10.17 x 10 / 1000 x (120)
= 0.706
Pt = 50 1-√1-(4.6 / fck) x (Mu / b x d )
2

fy / fck

= 50 1-√1-(4.6 / 15) x (0.706)


415 / 15

= 50 [(1-0.885) x 15 / 415 ]
= 0.208%