I N D E X : GENERAL NOTES

10 MM Ø BED BARS SPCD. @


1 AS SHOWN ALL HORIZONTAL PIPINGS IN
0.50Mx0.50Mx0.10M THK. 1' PERFECT ALIGMMENT AND
2 REINFORCED CONCRETE A UNIFORM GRADE OF NOT
SLAB MANHOLE COVER. LESS THAN 2%.
12 MM Ø ROUND BAR HANDLE
2.50 3
CHANGE IN DIRECT SHALL
1.25 0.60 0.65 0.10M THK. REINFORCED 2' BE DONE BY APPROPRIATE
0.50 M
4 CONCRETE SLAB USE OF 45% WYE LONG SWEEP
4" THK. REINFORCED CHB QUARTER BENT 6 / 8
5 WALL CEMENT PLASTERED OR 6 / 10 BENDS WHEN
3 "Ø PVC SANITARY PIPE CHANGE OF FLOW IS FROM
HORIZONTAL TO VERTICAL,
4" THK. REINFORCED CHB CEMENT PLASTERED 4" Ø PVC SANITARY PIPE A SINGLE 1 / 8 BEND
6 COMBINATION MAY BE USED IN
CO CO CO OUTLET 10 MM Ø VERTICAL & WASTE LINES, TEE AND
4" Ø PVC SANITARY PIPE INLET
10MM Ø HORIZONTAL BARS 6 7 HORIZONTAL BARS SPCD. @ CROSSES MAY BE USED IN
0.50M.O.C BOTHWAY VENT PIPES.
5
MANHOLE MANHOLE MANHOLE 4-12MM Ø MAIN BARS
8
INLET OUTLET NO DOUBLE HUB OR DOUBLE

0.50
10MMØ BOTTOM BARS

1.20
2 9 3' TEE BRANCH SHALL BE USED
SPACED @ 0.20M O.C.
0.50 M

BOTHWAYS ON HORIZONTAL SOIL OR


WASTE LINES, THE DRILLING
3 0.20 m X 0.30 m WALL & TAPPING OF HOUSE,
A 10 FOOTING W/ 3- 10 Ø mm
CO WASTE OR VENT PIPES AND
B
4" Ø PVC SANITARY PIPE LONGITUDINAL BARS; 10 Ø USED OF SADDLE HUBS AND
4 mm TRAVERSE BARS SPACED BEND ARE PROHIBITED.
@ O.30 M. O. C. BOTHWAYS

4' CLEAN-OUTS ARE REQUIRED


12MM Ø ROUND BAR HANDLE W/ 2 COAT EPOXY PRIMER PAINT GREY
INLET 1 UNDER THE FOLLOWING
0.50Mx0.50Mx0.10M THK. REINFORCED CONCRETE SLAB MANHOLE COVER 0.50 CONDITIONS:
a. EVERY CHANGE IN
PLAN PLAN HORIZONTAL DIRECTION
EXCEEDING 22.5°
b. 1.5M INSIDE PROPERTY
LINE BEFORE THE
HOUSE DRAINAGE.
2 3 6 2 3 6 6 c. EVERY 15MTS. IN
HORIZONTAL RUN OF
CO MAN HOLE CO MAN HOLE CO MAN HOLE CO PIPE.
0.50Mx0.50Mx0.10M THK. REINFORCED CONCRETE d. AT ANY END OF ANY
3" Ø PVC SANITARY PIPE SLAB MANHOLE COVER W/ 12MM Ø ROUND BAR HORIZONTAL PIP LINE.
HANDLE W/ 2 COAT EPOXY PRIMER PAINT GREY

0.10
4" PVC SANITARY PIPE 4" PVC SANITARY PIPE
OUTLET THE DIEGESTIVE CHAMBER
5' OF ANY SEPTIC VAULT MUST
S C U M FLOW LINE BE WATER PROOFED.
0.10

3"
NOT LEES THAN .30 MTS OF
5 6' AIR SPACE MUST BE LEFT
0.60

0.40

BETWEEN THE TOP OF THE


1.50
1.70

SEWAGE AND BOTTOM OF


G R A D E D LEN
ACW
G
HIEL LEN
ACW
G
HIEL THE SEPTIC VAULT COVER.
GRAVEL FILTER V
C
GEHD
ASM
ITBER
0.10

4" THK. REINFORCED CHB


CEMENT PLASTERED ALL PLUMBING WORKS
7' SHOULD BE DONE IN ACCOR-
DANCE WITH THE PROVISION
OF THE NATIONAL PLUMBING
10MM Ø HORIZONTAL BARS GR AD ED GR AV E L F IL T E R CODE THE REQUIREMENTS
S L U D G E OF THE LOCAL PLUMBING
0.15 0.35 0.15 INSPECTION OFFICE,
0.20

PERTINENT PROVISIONS OF
10 THE EXISTING LOCAL BUILDING
CODE.
SECTION 9 ALL PLUMBING WORKS SHALL
SECTION 8' BE DONE BY A LICENSED
MASTER PLUMBER OR
0.30 0.30 0.30 0.30 SANITARY ENGINEER AND
LICENSED PLUMBING
CONTRACTOR.

P-1-2 CATCH BASIN DETAIL P-2-2 DETAIL OF SEPTIC VAULT


SCALE 1:20MTS. 04 07 SCALE NTS
04 07
Office of the President SUBMITTED BY: SHEET CONTENT : REVISIONS : DATE : SHEET NO.
NAME OF PROPONENT : DESIGNED BY :
NATIONAL HOUSING AUTHORITY
Elliptical Road, Diliman, Quezon City
CATCH BASIN DETAIL
ROTAFLEX CONSTRUCTION & DEV'T. CORP
4/F, EL-AL Bldg., 608 Quezon Ave, Brgy.
PROJECT TITLE :

PROPOSED TWO STOREY 60 SQ.M.


DETAIL OF SEPTIC VAULT P
Tatalon, Quezon, City CHECKED BY: REVIEWED BY: RECOMMENDING APPROVAL: APPROVED BY:
ARCHITECT / CIVIL ENGINEER DUPLEX HOUSING UNIT
RYAN L. UY 4
7
RYAN UY

REG. NO.: DATE: LOCATION : MARCELINO P. ESCALADA, JR.


AUTHORIZED REPRESENTATIVE
GENERAL MANAGER, NHA
PTR NO.: PLACE:

You might also like