CASH FLOW
ACTIVITIES COST/AMOUNT
A - Site Visit = Php
B - Mobilization = Php
C - Land Surface Clearing = Php
D - Construction of bunkhouse = Php
E - Construction of temporary fence = Php
F - Laying out and staking out = Php
G - Excavation of foundation = Php
H - Fabrication of footing, column rebars = Php
I - Installation of footing, column rebars = Php
J - Concreting of footing = Php
K - Scaffold installation for ground column = Php
L - Installation of forms for ground columns = Php
M - Pouring concrete for ground column = Php
N - Grading and Gravel fill for SOG = Php
O - Installation of slab on grade rebars = Php
P - Installation of plumbing and electrical rough-ins (ground) = Php
Q - Concreting of slab on grade = Php
R - Fabrication of rebars for 2nd floor beams = Php
S Installation of rebars for 2nd floor beams = Php
T Installation of forms for 2 floor beams
nd = Php
U Pouring of concrete for 2nd floor beams = Php
V Fabrication of rebars for 2nd floor suspended slabs = Php
W Installation of rebars for 2nd floor suspended slabs = Php
X Installation of plumbing and electrical rough-ins (2nd) = Php
Y Pouring of concrete for 2nd floor slab = Php
Z Fabrication of rebars for stairs (ground to second) = Php
AA Installations of rebars for stairs (ground to second) = Php
BB Installations of forms for stairs (ground to second) = Php
CC Pouring concrete for stairs (ground to second = Php
DD Fabrication of rebars for columns (2nd to 3rd) = Php
EE Installation of rebars for columns (2nd to 3rd) = Php
FF Installation of forms for columns = Php
GG Pouring concrete for column = Php
HH Fabrication of rebars for 3rd floor beams = Php
II Installation of rebars for 3 floor beams
rd
= Php
JJ Installation of forms for 3rd floor beams = Php
KK Pouring of concrete for 3rd floor beams = Php
LL Fabrication of rebars for 3rd floor suspended slabs = Php
MM Installation of rebars for 3rd floor suspended slabs = Php
NN Installation of plumbing and electrical rough-ins (3rd) = Php
OO Pouring of concrete for 3rdfloor slab = Php
PP Fabrication of rebars for stairs (2nd to 3rd ) = Php
QQ Installations of rebars for stairs (second to third) = Php
RR Installations of forms for stairs (second to third) = Php
SS Pouring concrete for stairs (second to third) = Php
TT Fabrication of rebars for columns (3rd to RD) = Php
XX Fabrication of rebars for RD slabs = Php
UU Installation of rebars for columns (3rd to RD) = Php
VV Installation of forms for columns (3rd to RD) = Php
WW Pouring concrete for column(3 to RD)
rd = Php
YY Installation of rebars for RD slabs = Php
ZZ Pouring of concrete for RD slab = Php
AAA Removal of all formworls = Php
BBB Installation of CHB walls = Php
CCC Wall finishing = Php
FFF Installation of plumbing and electrical fixtures = Php
DDD Installation of doors and windows = Php
EEE Installation of catch basin and Septic tank construction = Php
GGG Installation of downspout = Php
HHH Tile works = Php
III Installation of ceiling = Php
JJJ Painting works = Php
KKK KKK. Wall finishing = Php
LLL LLL. Demobilization = Php
MMM MMM. General cleaning = Php
NNN Turn Over = Php
A - Site Visit
B - Mobilization
C - Land Surface Clearing
D - Construction of bunkhouse
E - Construction of temporary fence
F - Laying out and staking out
G - Excavation of foundation
H - Fabrication of footing, column rebars
I - Installation of footing, column rebars
J - Concreting of footing
K - Scaffold installation for ground column
L - Installation of forms for ground columns
M - Pouring concrete for ground column
N - Grading and Gravel fill for SOG
O - Installation of slab on grade rebars
Total
0 25
1st (25 DAYS) 2nd (25 DAYS)
COST/AMOUNT EXPENDITURE 348,575.98 799,251.71
0.00 CUMULATIVE EXPENDITURE 348,575.98 1,147,827.69
5,000.00 % ACCOMPLSIHMENT 9.232 21.168
9,810.00 CUMULATIVE % ACCOMPLISHMENT 9.232 30.400
5,000.00
13,779.00 PLATE NO. 10
20,000.00 S-CURVE
53,409.72
Row 9
20,274.00
110.000
20,274.00
100.000
103,619.95
25,284.00 90.000
10,548.00
80.000
25,893.00
9,238.00 70.000
39,669.46 60.000
135,508.46
50.000
71,938.00
78624.00 40.000
78624.00 30.000
23500.00
20.000
73158.00
39430.00 10.000
39430.00
135508.46 0.000
0 20 40 60 80 100
71945.46
21312.32
21312.32
6300.00
13357.50
35136.00
35136.00
10548.00
25893.00
78624.00
78624.00
23500.00
73158.00
39430.00
39430.00
135508.46
71945.55
21312.33
21312.32
6300.00
13357.50
35136.00
39430.00
35136.00
10548.00
25893.00
39430.00
71945.00
1885.70
223273.30
20000.00
195000.00
155596.00
28800.00
9625.00
42300.00
70625.00
817200.00
20000.00
50000.00
3000.00
0.00
5,000.00
9,810.00
5,000.00
13,779.00
20,000.00
53,409.72
20,274.00
20,274.00
103,619.95
25,284.00
10,548.00
25,893.00
9,238.00
26446.306667
348,575.98
13,223.15
135,508.46
71,938.00
78624.00
78624.00
23500.00
73158.00
39430.00
39430.00
135508.46
71945.46
21312.32
8524.93
790,726.78
12787.39
6300.00
13357.50
35136.00
35136.00
10548.00
25893.00
78624.00
78624.00
23500.00
73158.00
39430.00
39430.00
135508.46
71945.55
21312.33
21312.32
6300.00
13357.50
4392.00
39430.00
785482.05
30744.00
35136.00
10548.00
25893.00
39430.00
39430.00
71945.00
1885.70
223273.30
20000.00
155596.00
1600.00
195000.00
4708.33
855189.33
27200.00
65916.67
817200.00
20000.00
50000.00
3000.00
983316.67
50 75 123
3rd (25 DAYS) 4th (25 DAYS) 5th (23 DAYS)
781,349.12 817,675.67 1,028,933.333
1,929,176.81 2,746,852.48 3,775,785.810
20.694 21.656 27.251
51.093 72.749 100.000