You are on page 1of 7

GOOD PRACTICES

PARKWAY INTERNATIONAL CONTRACTING

PARK POINT 5AB


HSE GOOD PRACTICES (AUGUST 2019)

1
GOOD PRACTICES

1) Arrangement for PVC Blue sheet been provided in rest areas


to enable workers sleep comfortably during break Time

2
GOOD PRACTICES

2) Rebar Cap has been provided to be used to cover all


protruding steel rebar in the site

3
GOOD PRACTICES

3) Arrangements for New Mobile scaffolding have been


ensured to help safe work operations in corridors and
rooms in site.

4
GOOD PRACTICES

4) Re-Certification of all Lifting gears after 6 Months as


per Dubai Municipality Code of Construction Practice
being ensured in the project

5
GOOD PRACTICES

5) Arrangements has been put in place for removal of


waste materials on roof of the site buildings on daily basis
to prevent Fire out break and safe working environment

BEFORE

AFTER

6
GOOD PRACTICES

6) Arrangements for daily visual inspection of all


Distribution board in site has been ensure and damaged
sockets being replaced.

BEFORE

AFTER