You are on page 1of 1

Second Stage Flash for SMPO-2

CHIYODA SINGAPORE
(SSF2) PROJECT (PTE) LIMITED

Vendor Name: Utoc Engineering Pte Ltd


UTOC ENGINEERING PTE LTD
Item:

Document Title: Shell Seraya SSF2 Project Overall Progress S-Curve


Equipment Tag Number(s): Total Pages: 01

Vendor Document No.: Rev.0 CSL Identification No. (For CSL) Rev. (For CSL)

CHIYODA SINGAPORE (PTE) LIMITED

JOB NO. : 48608 (SSF2) Project


PO NO. :
REQ NO. :
IDENT NO.: REV. NO.
0
1- NO COMMENTS. PROCEED SECTION:
WITH FABRICATION

2- PROCEED FABRICATION

WITH COMMENTS TO BE

INCORPORATED

3- DO NOT PROCEED WITH

FABRICATION. RESUBMIT

AS COMMENTED

4- FOR INFORMATION DATE:

PURCHASER’S PERMISSION TO PROCEED OR REVIEW TAKEN ON VENDOR

PRINTS SHALL NOT RELIEVE VENDOR FROM ITS RESPONSIBILITIES OR

LIABILITIES UNDER PURCHASE ORDER

0 FOR APPROVAL 05.07.2019


REV. DESCRIPTION ISSUE DATE PREPARED BY APPROVED BY

LEVEL 3