2.00 Supervision
2.02 Civil/structural Engineering Consultant 1 25,000.00
2.04 Resident Civil Engineer 1 15000
2.05 Foreman 1 3000
2.06 Surveyor 1 12000
Subtotal
REE 6 MONTHS
Total No
of Days Cost(NGN)
144 432,000
144 216,000
1 105,000
0
0
18 450,000
144 2,160,000
144 432,000
3 36,000
4,022,550.00