Professional Documents
Culture Documents
Summary:
External Forces:
Material properties:
As = 245 mm2
D= 22 mm
ps = 375 N/mm2 : Shear strength of bolts
pbb = 1000 N/mm 2
: Bearing strength of bolts
pt = 560 N/mm 2
: Tension strength of bolts
Bolts arrangement: ec c
ec
ec = 40 mm : Horizontal edge distance ep
c= 70 mm : Gauge
ep = 40 mm : Vertical edge distance p
p= 70 mm : Pitch
offset = 10 mm
ep
t= 10 mm : Cleat thickness (<=0.5d for Gr43 steel) o
m= 1 : Number of columns of bolts
n= 3 : Number of rows of bolts
Ps = ps*As
= 375*245/1000
= 91.8 kN : [Cl.6.2.3.1]
The force in each bolt due to the shear (assumed equally divided),
fv = Vu/(m*n)
= 100/(1*3)
= 33.4 kN
The force in each bolt due to the axial force (assumed equally divided),
fh = Pu/(m*n)
= 10/(1*3)
= 3.4 kN
The polar inertia about the centroid for the whole bolt group,
J ( n 1)
(
I00 = #VALUE!
= #VALUE! mm2
I 00 m
The horizontal component force in the extreme bolt due to the moment is,
fmh = #VALUE!
= #VALUE! kN
The vertical component force in the extreme bolt due to the moment is,
fmv = #VALUE!
J 0
= #VALUE! kN
The combined force in the extreme bolt (resultant) is,
f r ( f mv f v ) ( f mh f 2
fr = #VALUE!
= #VALUE! kN
Fv = 100 kN
t= 10 mm : Thickness of cleat
Av = 0.9*A : Shear area [Cl.4.2.3]
= 0.9*220*10
= 1980 mm2
Avnet = Av-n*D*t
= 1980-3*22*10
= 1320 mm2 : Net shear area
Pu = 10 kN
Vu = 100 kN
M = 100*((1-1)/2*70+40+10)/1000
5 kNm
Pc = A*py
= 220*10*275/1000
= 605 kN
Fv/Pv = 100/326.7
= 0.307
Mc = py*Z
= 275*(10*220^2/6)/1000000
= 22.1 kNm
For high shear,
r = (2*(Fv/Pv)-1)^2
= (2*0.307-1)^2
= 0.149
Sv = 0.9*10*220^2/4
= 108900 mm3
Mc = py*(Z-r*Sv/1.5)
= 275*(80666.6666666667-0.149*108900/1.5)/1000000
= 19.2 kNm
Therefore,
P/Pc + M/Mc
= ABS(10)/605+ABS(5)/22.1
= 0.243 <1 O.K.
Fb = #VALUE! kN
d= 20 mm : Bolt size
t= 10 mm : Cleat thickness
pbb = 1000 N/mm2 : Bearing strength of bolts
Fb = #VALUE! kN
d= 20 mm : Bolt size
t= 10 mm : Cleat thickness
pbs = 0.67*(Us+Ys) : Bearing strength of cleat [Table 32]
= 0.67*(410+275)
= 458 N/mm2
e= 40 mm : Minimum edge distance
kbs*d*t*pbs
= 1.0*20*10*458/1000
= 91.6 kN
0.5*kbs*e*t*pbs
= 0.5*1.0*40*10*458/1000
= 91.6 kN
Pbs = MIN(91.6,91.6)
= 91.6 kN #VALUE! #VALUE! #VALUE!
Pu = 10 kN
Vu = 100 kN
s
M = 100*((1-1)/2*70+40+10)/1000
s
5 kNm
2 l
�P M � �V
�
� �
�A Z � �
sreq = SQRT((10000+6*5000000/220)^2+(100000)^2)/(2*0.7*220*220)
= 3 mm
� P
� �
�2 ( 0.7 s ) l
�
Job Number ---
Job Title ---
Summary:
External Forces:
Material properties:
As = 245 mm2
D= 22 mm
ps = 375 N/mm2 : Shear strength of bolts
pbb = 1000 N/mm 2
: Bearing strength of bolts
pt = 560 N/mm 2
: Tension strength of bolts
Bolts arrangement: ec c
ec
ec = 40 mm : Horizontal edge distance ep
c= 70 mm : Gauge
ep = 40 mm : Vertical edge distance p
p= 70 mm : Pitch
offset = 10 mm
ep
t= 10 mm : Cleat thickness (<=0.5d for Gr43 steel) o
m= 1 : Number of columns of bolts
n= 3 : Number of rows of bolts
Ps = ps*As
= 375*245/1000
= 91.8 kN : [Cl.6.2.3.1]
The force in each bolt due to the shear (assumed equally divided),
fv = Vu/(m*n)
= 100/(1*3)
= 33.4 kN
The force in each bolt due to the axial force (assumed equally divided),
fh = Pu/(m*n)
= 10/(1*3)
= 3.4 kN
The polar inertia about the centroid for the whole bolt group,
J ( n 1)
(
I00 = #VALUE!
= #VALUE! mm2
I 00 m
The horizontal component force in the extreme bolt due to the moment is,
fmh = #VALUE!
= #VALUE! kN
The vertical component force in the extreme bolt due to the moment is,
fmv = #VALUE!
J 0
= #VALUE! kN
The combined force in the extreme bolt (resultant) is,
f r ( f mv f v ) ( f mh f 2
fr = #VALUE!
= #VALUE! kN
Fv = 100 kN
t= 10 mm : Thickness of cleat
Av = 0.9*A : Shear area [Cl.4.2.3]
= 0.9*220*10
= 1980 mm2
Avnet = Av-n*D*t
= 1980-3*22*10
= 1320 mm2 : Net shear area
Pu = 10 kN
Vu = 100 kN
M = 100*((1-1)/2*70+40+10)/1000
5 kNm
Pc = A*py
= 220*10*275/1000
= 605 kN
Fv/Pv = 100/326.7
= 0.307
Mc = py*Z
= 275*(10*220^2/6)/1000000
= 22.1 kNm
For high shear,
r = (2*(Fv/Pv)-1)^2
= (2*0.307-1)^2
= 0.149
Sv = 0.9*10*220^2/4
= 108900 mm3
Mc = py*(Z-r*Sv/1.5)
= 275*(80666.6666666667-0.149*108900/1.5)/1000000
= 19.2 kNm
Therefore,
P/Pc + M/Mc
= ABS(10)/605+ABS(5)/22.1
= 0.243 <1 O.K.
Fb = #VALUE! kN
d= 20 mm : Bolt size
t= 10 mm : Cleat thickness
pbb = 1000 N/mm2 : Bearing strength of bolts
Fb = #VALUE! kN
d= 20 mm : Bolt size
t= 10 mm : Cleat thickness
pbs = 0.67*(Us+Ys) : Bearing strength of cleat [Table 32]
= 0.67*(410+275)
= 458 N/mm2
e= 40 mm : Minimum edge distance
kbs*d*t*pbs
= 1.0*20*10*458/1000
= 91.6 kN
0.5*kbs*e*t*pbs
= 0.5*1.0*40*10*458/1000
= 91.6 kN
Pbs = MIN(91.6,91.6)
= 91.6 kN #VALUE! #VALUE! #VALUE!
Pu = 10 kN
Vu = 100 kN
s
M = 100*((1-1)/2*70+40+10)/1000
s
5 kNm
2 l
�P M � �V
�
� �
�A Z � �
sreq = SQRT((10000+6*5000000/220)^2+(100000)^2)/(2*0.7*220*220)
= 3 mm
� P
� �
�2 ( 0.7 s ) l
�