MIV STATION AT KM 88.00 AND 264.

00 (PER IEEE 1115)


(1) (2) (3) (4) (5) (6) (7) (8)

Required Section
Capacity Temperature Size
Duration or Rating Factor Derating (3) x (6) x (7)
Load Time to End of Section
Period Change in Load (amperes) Period at t Min Rate Factor for t = Rated Amp-Hrs
(amperes)
(minutes)
(minutes) LOAD
(Kt) Min Rate (Tt)
Positive Negative
Values Values A1
Section 1 - First Periods only - if A2 is greater than A1, go to Section 2. A2
1 A1= 1.32 A1-0= 1.32 M1= 1440 t= M1= 1440 26.10 1.03 35.37 *** A3
Sec 1 Total 35.37 *** A4
Section 2 - First Two Periods only - if A3 is greater than A2, go to Section 3. A5
1 A1= 1.32 A1-0= 1.32 M1= 1440 t= M1+M2= 7200 120.13 1.03 162.81 A6
2 A2= 0.34 A2-A1= -0.97 M2= 5760 t= M2= 5760 96.86 1.03 -97.24 AR
Sec Sub Total 162.81 -97.24 A8
2 Total 65.57 ***
Section 3 - First Three Periods only - if A4 is greater than A3, go to Section 4.
1 A1= A1-0= M1= t= M1+M2+M3= 0 AR
2 A2= A2-A1= M2= t= M2+M3= 0
3 A3= A3-A2= M3= t= M3=
Sec Sub Total 0.00 0.00
3 Total 0.00 ***
Section 4 - First Four Periods only - if A5 is greater than A4, go to Section 5.
1 A1= A1-0= M1= t= M1+...M4= 0
2 A2= A2-A1= M2= t= M2+M3+M4= 0
3 A3= A3-A2= M3= t= M3+M4= 0
4 A4= A4-A3= M4= t= M4=
Sec Sub Total 0.00 0.00
4 Total 0.00 ***
Section 5 - First Five Periods only - if A6 is greater than A5, go to Section 6.
1 A1= A1-0= M1= t= M1+...M5= 0
2 A2= A2-A1= M2= t= M2+…M5= 0
3 A3= A3-A2= M3= t= M3+…M5= 0
4 A4= A4-A3= M4= t= M4+M5= 0
5 A5= A5-A4= M5= t= M5= 0
Sec Sub Total 0.00 0.00
5 Total 0.00 ***
Section 6 - First Six Periods only - if A7 is greater than A6, go to Section 7.
1 A1= A1-0= M1= t= M1+...M6= 0
2 A2= A2-A1= M2= t= M2+…M6= 0
3 A3= A3-A2= M3= t= M3+…M6= 0
4 A4= A4-A3= M4= t= M4+…M6= 0
5 A5= A5-A4= M5= t= M5+M6= 0
6 A6= A6-A5= M6= t= M6= 0
Sec Sub Total 0.00 0.00
6 Total 0.00 ***
Section 7 - First Seven Periods only - if A8 is greater than A7, go to Section 8.
1 A1= A1-0= M1= t= M1+...M7= 0
2 A2= A2-A1= M2= t= M2+…M7= 0
3 A3= A3-A2= M3= t= M3+…M7= 0
4 A4= A4-A3= M4= t= M4+…M7= 0
5 A5= A5-A4= M5= t= M5+…M7= 0
6 A6= A6-A5= M6= t= M6+M7= 0
7 A7= A7-A6= M7= t= M7=
Sec Sub Total 0.00 0.00
7 Total 0.00 ***
Random Equipment Load Only (if needed)
R AR= 0.00 AR-0= 0.00 MR= 0 t=MR= 0 0.00 0.00 0.00 ***

Maximum Section Size 100.94


Legend:
Random Section Size -
Uncorrected Size (US) 100.94 Indicates data input required
Design Margin 1.10 E per SAES-P-103 Clause 5.3.3 Indicates calculated value
Aging Factor 1.25 E per SAES-P-103 Clause 5.3.3
Minimum Required Cell Siz 138.79
Standard Cell Size PV185 E ALCAD Vendor Catalog Number
MIV STATION AT KM 88.00 AND 264.00
DC Load List
Equipment Steady State Power (W) Inrush power QTY
Pump Motor 115 1
Density Meter Skid Miscellaneous Instruments 85 1

Solenoid Valves 2 2
GOV Valve Positioner 1 1
Indicating Light 2 1
Control Relays 2 3
MOV Panel Indicating Lights 2 1

Site Processor 20 1
Leak Detection System

RTU Miscellaneous Equipment 24 1


Remote Terminal Unit

Continuous Loads: L1 for 7200 minutes (5 days)


Equipment Steady State Power (W) QTY Total
Solenoid Valves 2 2 4
GOV Valve Positioner 1 1 1
Indicating Light 2 1 2

Grand total 7
Continuous Loads: L2 for 1440 minutes
Equipment Steady State Power (W) QTY Total
Site Processor 20 1 20
Leak Detection System

Grand total 20
Random Load
Equipment Steady State Power (W) QTY Total

Grand total 0
DC Load Profile
Period Period scenarios Total Amperes Duration (min) Capacity Removed (Ah)
A1 LI + L2 1.32 1440 31.58
A2 L1 0.34 5760.00 32.75
A3 0.00 0.00 0.00
A4 0.00 0.00 0.00
A5 0.00 0.00 0.00
A6 0.00 0.00 0.00
A7 0.00 0.00 0.00
A8 0.00 0.00 0.00
AR 0.00 0.00 0.00
Total 64.33
CELL TYPE PV185 CAPACITY RATING FACTORS
(1) (2)

Time t1 from Cell Time t2 from Cell Factor Kt1 for time Factor Kt2 for time
Discharge Time, t Factor Kt
Performance Performance t1, t2,
(Minutes) Amperes for time Amperes for time for time t
Tables (Minutes) Tables (Minutes) t1 t Batt. AH / (1) Batt. AH / (2)
2

1440 2880 4320 3.74 2.54 49.47 72.83 26.10


5760 5760 1.91 96.86 96.86
7200 7200 1.54 120.13 120.13
RQ-2 at KM 88.00 and 264.00

Objective
Determine the Size of Solar Array and Charge Controller ARAMCO Standards
for the 24V DC Photovoltaic System per ARAMCO Standards
Indicates data input required
Data: Indicates calculated value

DC CONTINUOUS LOADS
24.00 V E System voltage
20.52 V E End-of discharge voltage
Qty.
0.97 A 1 x 20 Watts E LDS
0.00 A 0 x 24 Watts E RTU
0.34 A 1 x 7 Watts E GOV Relay Panel
1.32 A E Sum of Loads
10% E Spare Capacity

1.45 A E Total Continuous Load (to be re-validated per actual installed load/s)

BATTERY INFORMATION
185 AH @ C120 E Battery AH Capacity PV185 Alcad E Vendor Catalog number
171 AH @ C5 E Battery AH Capacity
120.0 hrs E BT Required battery backup time in hours per SAES-P-103 Table 1 330C

A. PHOTOVOLTAIC ARRAY SIZING

30 Days E RT Recharge days to 95% AH capacity per SAES-P-103 Clause 9.3.3.1


5 hrs/day E SH Daily effective sun hours per SAES-P-103 Clause 9.3.3.2
150.0 hrs E RH Recharge hours to 95% AH capacity per SAES-P-103 Clause 9.3.3.1
8.91 A E PV Peak PV module output KD245GX Kyocera E Vendor Catalog number
44.55 Ah/day E PPV Daily peak PV module output
1.45 A E L Load current
1.15 E BIF Battery inefficiency factor (for all batteries) per SAES-P-103 Clauses 7.2.1 and 7.2.2
1.31 A E LB Battery charging current
34.74 Ah/day E Lh Daily load power
6.56 Ah/day E LBh Daily battery charging power
41 Ah/day E PVh Total daily power
1.10 E DPF Dust accumulation derating factor per SAES-P-103 Clause 9.3.3.3
1.10 E APF Aging derating factor per SAES-P-103 Clause 9.3.3.4
1.10 E GPF Growth factor per SAES-P-103 Clause 9.3.3.5
54.96 Ah/day E Adj. PVh Adjusted total daily power
1.23 E Nmin No. of parallel modules
2 E Nmin No. of parallel modules (an integer number within 5% of calculated)
24 V E MV Module voltage
1 E SS No. of series strings
2 E NT Total no. of modules

B. CHARGE CONTROLLER SIZING

A = SF x (L + LB) E SAES-P-103 Clause 7.2.1, equation (5)


1.10 E SF Service factor per SAES-P-103 Clause 7.2.1
3.03 A E Minimum charge controller size
15 A E Available charge controller size
330C

330C

Comment:
This calculation is preliminary only. It is the responsibility of the Construction Contractor and the Photovoltaic-System
Vendor to re-design and re-validate this Photovoltaic Array and Charge Controller Sizing Calculations per actual installed DC
continuous loads. 350C
MIV STATION AT KM 120.00 AND 294.00 (PER IEEE 1115)
(1) (2) (3) (4) (5) (6) (7) (8)

Required Section
Capacity Temperature Size
Duration or Rating Factor Derating (3) x (6) x (7)
Load Time to End of Section
Period Change in Load (amperes) Period at t Min Rate Factor for t = Rated Amp-Hrs
(amperes) (minutes)
(minutes) (Kt) Min Rate (Tt)
Positive Negative
Values Values
Section 1 - First Periods only - if A2 is greater than A1, go to Section 2.
1 A1= 2.49 A1-0= 2.49 M1= 1440 t= M1= 1440 26.13 1.03 66.89 ***
Sec 1 Total 66.89 ***
Section 2 - First Two Periods only - if A3 is greater than A2, go to Section 3.
1 A1= 2.49 A1-0= 2.49 M1= 1440 t= M1+M2= 7200 119.94 1.03 307.05
2 A2= 1.51 A2-A1= -0.97 M2= 5760 t= M2= 5760 96.96 1.03 -97.34
Sec Sub Total 307.05 -97.34
2 Total 209.70 ***
Section 3 - First Three Periods only - if A4 is greater than A3, go to Section 4.
1 A1= A1-0= M1= t= M1+M2+M3= 0
2 A2= A2-A1= M2= t= M2+M3= 0
3 A3= A3-A2= M3= t= M3=
Sec Sub Total 0.00 0.00
3 Total 0.00 ***
Section 4 - First Four Periods only - if A5 is greater than A4, go to Section 5.
1 A1= A1-0= M1= t= M1+...M4= 0
2 A2= A2-A1= M2= t= M2+M3+M4= 0
3 A3= A3-A2= M3= t= M3+M4= 0
4 A4= A4-A3= M4= t= M4=
Sec Sub Total 0.00 0.00
4 Total 0.00 ***
Section 5 - First Five Periods only - if A6 is greater than A5, go to Section 6.
1 A1= A1-0= M1= t= M1+...M5= 0
2 A2= A2-A1= M2= t= M2+…M5= 0
3 A3= A3-A2= M3= t= M3+…M5= 0
4 A4= A4-A3= M4= t= M4+M5= 0
5 A5= A5-A4= M5= t= M5= 0
Sec Sub Total 0.00 0.00
5 Total 0.00 ***
Section 6 - First Six Periods only - if A7 is greater than A6, go to Section 7.
1 A1= A1-0= M1= t= M1+...M6= 0
2 A2= A2-A1= M2= t= M2+…M6= 0
3 A3= A3-A2= M3= t= M3+…M6= 0
4 A4= A4-A3= M4= t= M4+…M6= 0
5 A5= A5-A4= M5= t= M5+M6= 0
6 A6= A6-A5= M6= t= M6= 0
Sec Sub Total 0.00 0.00
6 Total 0.00 ***
Section 7 - First Seven Periods only - if A8 is greater than A7, go to Section 8.
1 A1= A1-0= M1= t= M1+...M7= 0
2 A2= A2-A1= M2= t= M2+…M7= 0
3 A3= A3-A2= M3= t= M3+…M7= 0
4 A4= A4-A3= M4= t= M4+…M7= 0
5 A5= A5-A4= M5= t= M5+…M7= 0
6 A6= A6-A5= M6= t= M6+M7= 0
7 A7= A7-A6= M7= t= M7=
Sec Sub Total 0.00 0.00
7 Total 0.00 ***
Random Equipment Load Only (if needed)
R AR= 0.00 AR-0= 0.00 MR= 0 t=MR= 0 0.00 0.00 0.00 ***

Maximum Section Size 276.60


Legend:
Random Section Size -
Uncorrected Size (US) 276.60 Indicates data input required
Design Margin 1.10 E per SAES-P-103 Clause 5.3.3 Indicates calculated value
Aging Factor 1.25 E per SAES-P-103 Clause 5.3.3
Minimum Required Cell Siz 380.32
Standard Cell Size PV415 E ALCAD Vendor Catalog Number
MIV STATION AT KM 120.00 AND 294.00
DC Load List
Equipment Steady State Power (W) Inrush power QTY
Pump Motor 115 1
Density Meter Skid Miscellaneous Instruments 85 1

Solenoid Valves 2 2
GOV Valve Positioner 1 1
Indicating Light 2 1
Control Relays 2 3
MOV Panel Indicating Lights 2 1

Site Processor 20 1
Leak Detection System

RTU Miscellaneous Equipment 24 1


Remote Terminal Unit

Continuous Loads: L1 for 7200 minutes (5 days)


Equipment Steady State Power (W) QTY Total
Solenoid Valves 2 2 4
GOV Valve Positioner 1 1 1
Indicating Light 2 1 2
RTU Miscellaneous Equipment 24 1 24
Remote Terminal Unit

Grand total 31
Continuous Loads: L2 for 1440 minutes (1 day)
Equipment Steady State Power (W) QTY Total
Site Processor 20 1 20
Leak Detection System

Grand total 20
Random Load
Equipment Steady State Power (W) QTY Total

Grand total 0
DC Load Profile
Period Period scenarios Total Amperes Duration (min) Capacity Removed (Ah)
A1 L1 + L2 2.49 1440 59.65
A2 L1 1.51 5760.00 145.03
A3 0.00 0.00 0.00
A4 0.00 0.00 0.00
A5 0.00 0.00 0.00
A6 0.00 0.00 0.00
A7 0.00 0.00 0.00
A8 0.00 0.00 0.00
AR 0.00 0.00 0.00
Total 204.68
CELL TYPE PV415 CAPACITY RATING FACTORS
(1) (2)

Time t1 from Cell Time t2 from Cell Factor Kt1 for time Factor Kt2 for time
Discharge Time, t Factor Kt
Performance Performance t1, t2,
(Minutes) Amperes for time Amperes for time for time t
Tables (Minutes) Tables (Minutes) t1 t Batt. AH / (1) Batt. AH / (2)
2

1440 2880 4320 8.40 5.71 49.40 72.68 26.13


5760 5760 4.28 96.96 96.96
7200 7200 3.46 119.94 119.94
RQ-2 at KM 120.00 and 294.00

Objective:
Determine the Size of Solar Array and Charge Controller ARAMCO Standards
for the 24V DC Photovoltaic System per ARAMCO Standards
Indicates data input required
Data: Indicates calculated value

DC CONTINUOUS LOADS
24 V E System voltage
20.52 V E End-of discharge voltage 350C
Qty.
0.97466 A 1 x 20 Watts E LDS
1.16959 A 1 x 24 Watts E RTU
0.34113 A 1 x 7 Watts E GOV Relay Panel
2.49 A E Sum of Loads
10% E Spare Capacity

2.73 A E Total Continuous Load (to be re-validated per actual installed load/s)

BATTERY INFORMATION
415 AH @ C120 E Battery AH Capacity PV415 Alcad E Vendor Catalog number
384 AH @ C5 E Battery AH Capacity
120.0 hrs E BT Required battery backup time in hours per SAES-P-103 Table 1 330C

A. PHOTOVOLTAIC ARRAY SIZING

30 Days E RT Recharge days to 95% AH capacity per SAES-P-103 Clause 9.3.3.1


5 hrs/day E SH Daily effective sun hours per SAES-P-103 Clause 9.3.3.2
150.0 hrs E RH Recharge hours to 95% AH capacity per SAES-P-103 Clause 9.3.3.1
8.91 A E PV Peak PV module output KD245GX Kyocera E Vendor Catalog number
44.55 Ah/day E PPV Daily peak PV module output
2.73 A E L Load current
1.15 E BIF Battery inefficiency factor (for all batteries) per SAES-P-103 Clauses 7.2.1 and 7.2.2
2.94 A E LB Battery charging current
65.61 Ah/day E Lh Daily load power
14.72 Ah/day E LBh Daily battery charging power
80 Ah/day E PVh Total daily power
1.10 E DPF Dust accumulation derating factor per SAES-P-103 Clause 9.3.3.3
1.10 E APF Aging derating factor per SAES-P-103 Clause 9.3.3.4
1.10 E GPF Growth factor per SAES-P-103 Clause 9.3.3.5
106.92 Ah/day E Adj. PVh Adjusted total daily power
2.40 E Nmin No. of parallel modules
3 E Nmin No. of parallel modules (an integer number within 5% of calculated)
24 V E MV Module voltage
1 E SS No. of series strings
3 E NT Total no. of modules

B. CHARGE CONTROLLER SIZING

A = SF x (L + LB) E SAES-P-103 Clause 7.2.1, equation (5)


1.10 E SF Service factor per SAES-P-103 Clause 7.2.1
6.25 A E Minimum charge controller size
30 A E Available charge controller size

330C

350C
330C

350C

Comment:
This calculation is preliminary only. It is the responsibility of the Construction Contractor and the Photovoltaic-System
Vendor to re-design and re-validate this Photovoltaic Array and Charge Controller Sizing Calculations per actual installed DC
continuous loads. 350C
BATTERY DUTY CYCLE DIAGRAM

L2
CURRENT

L1
R
TIME ( SEC )

Hard File: Design/Calculations Page 9


Filename: Attachment-2B Printed: 10/31/2019 20:56:49